ATTACHMENT C Forms.pdf
PDF 158 KB Posted
- Attached to
- AUTOMATIC FEEDER STEEL BEAM REMEDIATION Federal contract opportunity
- Solicitation number
- 12305B21R0011
About this file
This document contains a federal contract solicitation and daily inspection form templates. The solicitation is for automatic feeder steel beam remediation services with a requirement to remove existing rust and failed coatings from automatic feeder trolleys and structural steel at the National Cold Water Marine Aquaculture Center. The period of performance is 90 days from notice to proceed. Bid, payment and performance bonds are required. The estimated value is between $100,000 and $250,000. The solicitation closes on April 08, 2021.
The daily inspection form template requires daily completion and submission to the contracting officer and includes questions about emergency exits, fire protection systems, hazardous materials, safety equipment, permit compliance and incident reporting. Contractors must designate competent persons to perform daily inspections and ensure life safety standards are met during construction activities.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Main Building with Labels.pdf | ||
| Building plan.pdf | ||
| RFI 1.pdf | ||
| 12305B21R0011.pdf | ||
| Attachment D Sample COVID Safety Plan.pdf | ||
| ATTACHMENT B Specifications.pdf | ||
| Wage Determination ME20210008.pdf | ||
| ATTACHMENT A Photo Page.pdf | ||
| ARS372.pdf | ||
| ARS371.pdf | ||
| SOW Automatic Feeder Steel Beam.docx | DOCX document |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FORMS
HOT WORK PERMIT
NEEDED WHEN ANY SPARK OR HEAT PRODUCING EQUIPMENT IS TO BE USED
Project Name:
Name of Contractor’s Firm:
Contractor Contact Name:
Contractor Contact Telephone Number
Date:
Building/Location:
Work To Be Done:
Any Special Precautions:
Fire Watch Required: Yes No The location where the work is to be performed has been examined, necessary precautions have been taken, and permission is granted for this work.
Signed (Contractor Individual Responsible for Authorizing Hot Work)
Permit Expires: (Date)
Time Hot Work Started: Time Hot Work Completed:
FINAL CHECK-UP
Work area and all adjacent areas to which sparks and heat might have spread (including floors above and below and on opposite sides of walls) were inspected 30 minutes after the work was completed and were found fire safe.
Signed _ Contractor’s Fire Watch)
(Page 1 of 2)
Date _
ATTENTION
Before approving any cutting and welding permit, the contractor’s authorized representative or their appointee shall inspect the work area and confirm that precautions have been taken to prevent fire in accordance with NFPA Standard No. 51B.
PRECAUTIONS
• Sprinklers are in service where installed
• Cutting and welding equipment in good repair
• Within 35 feet; floors swept clean of combustible, no combustible material or flammable liquids, all wall and floor openings covered, and covers suspended beneath work to collect sparks
• When working on enclosed equipment and in confined space, equipment and area is free of flammable vapors
• Fire watch provided during and 30 minutes after operation (60 minutes for torch applied roofing operations)
• Portable fire extinguisher with adequate rating available in the immediate vicinity
• Standpipe system in service where installed
• Protection of any sprinkler heads when hot work is in close proximity
• Smoking prohibited in immediate vicinity
• Non-combustible shields provided when hot work is done near combustible walls, partitions, floors, roofs
• Prohibition of hot work on pipes contacting combustible walls
• Personnel trained in use of equipment including portable fire extinguishers and sounding a fire alarm
• Final check-up conducted after 30 minute
(Page 2 of 2)
DAILY INSPECTION FORM
INSTRUCTIONS: This form is to be utilized when hazards are posed by NFPA 101 deficiencies or construction activities are in progress. Remediation must be implemented upon project start and continuously enforced through project completion to provide a level of life safety comparable to that described in the Life Safety Code. Submit completed forms to the Contracting Officer.
Project Name: Project Number:
Construction & Impact Description: Construction Location:
Affected Areas:
Project COR: Project Start Date:
Project Competent Person (CP): Estimated Duration:
Completion Date:
Contractor:
GC Supervisor: Telephone:
Contractor CP:
Inspection Period:
Responses: SUN MON TUE WED THR FRI SAT
1. Are exits readily accessible and provide unobstructed egress?
2. Have alternate exits been established if required due to
3. If alternate exits have been established, are personnel in the area informed and aware of their relocation?
4. Are the existing and relocated exits clearly marked and able to be
5. Are evacuation routes posted with follow-up inspections required
6. Are written procedures and guidelines posted in the immediate and adjacent areas for what to do and who to call in the event of a fire
7. Are personnel in immediate/adjacent areas aware and informed in procedures and guidelines to follow in the event of fire
8. Is there free and unobstructed access to services for emergency personnel (eg, fire, medical, security)?
9. Are fire alarm (eg, pull station), detection (eg, smoke/heat), suppression (eg, sprinkler, extinguisher) systems in working
10. If the fire alarm, detection, suppression systems are impaired or temporarily non-functional, has a fire watch for the area, as required or necessary, been trained and established?
11. If the fire alarm, detection, suppression systems are impaired, have measures been taken to provide temporary equivalent equipment and/or systems for adequate protection? Note date for
12. If the fire alarm, detection, suppression systems are impaired, are equivalent equipment/systems inspected and tested
13. If temporary fire alarm, detection, suppression systems are installed, are personnel in the area aware and trained on how to operate or utilize them in the event of fire or emergency?
14. Has the “No Smoking” policy been posted, implemented and enforced in the construction area?
15. Are temporary partitions built to be fire/smoke tight with fire retardant noncombustible material and inspected daily for
16. Is construction site access restricted to authorized personnel only including warning signs and secured at the end of each
Inspection Period:
Responses:
SUN
MON
TUE
WED
THR
FRI
SAT
17. Is construction area hazard surveillance conducted daily?
18. Is construction area storage, waste, debris and excess materials being daily managed properly to reduce fire or safety
19. Are construction activities and materials prosecuted, handled, stored, and secured in an orderly and safe manner?
20. Is the generation, spread and exposure of construction dust, fumes, noise, odor, smoke controlled with appropriate fume, odor, vapor ventilation provided to control noxious, infectious, toxic exposure and store/protect flammable/combustible products?
21. Has a GC Safety Manager been designated with routine site safety meetings conducted to ensure awareness of Life Safety
22. Is personnel protective equipment (e.g., safety glasses, ear plugs, hard hats) required and being used?
23. If there are hand/safety rails, scaffolding or ladders required, are they in place, in good condition and being used in a
24. Are the construction site (buildings and exterior grounds) hazards (e.g., fall/trip) guarded and free of potential safety
25. Do electrical panels, temporary wiring, extension cords (3 wire grounded type), tools, and equipment appear to be installed, utilized, and functioning in a safe manner?
26. If there are temporary electrical outlets provided, do they have ground fault protection at the receptacle/panel?
27. If hazardous equipment/systems need to be de-energized, are applicable “Lockout/Tagout” procedures being followed?
28. Are utility services (e.g., electrical, steam, water, waste, gas) properly secured at the end of each day?
29. If there is any hot work (welding, soldering, cutting) being performed within the construction site, have additional fire safety precautions been taken and necessary equipment provided?
30. If there is any hot work (welding, soldering, cutting) being performed on the construction site, has Contracting Officer been notified? Has the Hot Work Permit been approved?
31. If hazardous products are present, are they limited to the amount needed and used daily?
32. Are hazardous products disposed according to EPA
33. Are all hazardous products present or being used (e.g., flammable, combustible, corrosive, noxious) labeled with MSDS information readily available?
34. If infection control is required, are the appropriate policies and procedures known and being followed?
35. Are all safety incidents documented and reported to the Contracting Officer?
Contractor CP Initials Performing Daily Inspections:
Inspection Comments/Findings: (PROVIDE DETAILED EXPLAINATION OF
EXCEPTIONS/DEFICIENTIES)
Signature/Date:
Project CP GC Safety Manager
| Signed |
| ATTENTION |
| PRECAUTIONS |
| Inspection Comments/Findings: (PROVIDE DETAILED EXPLAINATION OF EXCEPTIONS/DEFICIENTIES) |
File details come from the government source that posted it. Updated .