Attachment B Tech Data IHWCU Trousers.pdf

PDF 437 KB Posted

Attached to
IHWCU FEMALE COATS/TROUSERS Federal contract opportunity
Solicitation number
SPE1C1-21-R-0029
Issued by
Defense Logistics Agency Troop Support Clothing and Textiles

About this file

This document is a solicitation posted on the DLA Internet Bid Board System (DIBBS) seeking proposals for Improved Hot Weather Combat Utility (IHWCU) coats and trousers for females.

The requirement is for IHWCU coats and trousers to meet specifications GL-PD 15-04F and GL-PD 15-05F respectively. Patterns dated 30 July 2020 are to be used. The destination is Pendergrass, GA with FOB destination terms. Coats are in each unit and trousers are in pair unit. The contract period includes one 12-month base term and four 12-month option terms. Production lead time is 180 days initial and 150 days subsequent. Lot structure includes a HUBZone set-aside lot and a small business set-aside lot, with two awards intended, one for each lot. The inspection and acceptance point is origin. All materials are to be furnished by the offeror. The solicitation will be posted on DIBBS and proposals are due within the timeframe specified there.

View the file

Other files for this federal contract opportunity

Other files attached to IHWCU FEMALE COATS/TROUSERS, newest first.
File Type Posted
Attachment D AQAR.pdf PDF
Attachment A Tech Data IHWCU Coats.pdf PDF
Attachment C DIBBS submission.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Technical and Quality Requirements for the IHWCU Trouser contracts

DLA Troop Support

This document contains contract requirements applicable to Type II (Female), Class 2 of the IHWCU Trousers. This information supplements other contract requirements which may exist to cover similar topics.

This document is subject to revision via contract modification. Each section is marked with a date showing when that section was last updated. The entire document will be periodically reissued in full with all updates incorporated.

DLA TROOP SUPPORT C&T AQAR is also part of this contract and is referenced throughout this document.

END ITEM TECHNICAL REQUIREMENTS

Trouser, IMPROVED HOT WEATHER COMBAT UNIFORM, GL/PD 15-05F This section last updated: 11.17.20

Trouser, IMPROVED HOT WEATHER COMBAT UNIFORM Treated, Operational Camouflage Pattern (OCP) (PGC00226) shall be made in accordance with Class 2 of GL/PD 15-05F.

Sewing pattern

The Contractor is responsible for adjusting patterns as necessary to anticipate dimensional changes and ensure that the finished garment meets the required finished measurements in Table VII. (See paragraph 3.4.1.2 and 3.10)

Request pattern by style name and date to ensure that the correct pattern is provided by the government.

FTrouser, Improved Hot Weather Combat Uniform, PD15_05F

Pattern Date: 30 July 2020

Interim changes to GL/PD 15-05F This section last updated: 11.17.2020

Significant note: The permethrin treatment shall be applied to finished Class 2 trousers by a treatment facility approved by the Army for each item being treated.

Interim changes to GL/PD 15-05F, September 1, 2020

Significant note: The permethrin treatment shall be applied to finished Class 2 coats by a treatment facility approved by the Army for each item being treated.

TABLE VI. Thread requirements. Delete Row 3, Button attachment, in its entirety and replace with the following:

"Button attachment A_A-50199, Type II 71-105 71-105"

Paragraph 3.8.11 Eyelets. Delete the entire paragraph and replace with the following:

"3.8.11 Eyelets. The sewn-in eyelets for the cargo pocket and lower leg pocket bellows shall have a minimum of 16 stitches and a 1/4 (± 1/16) inch diameter finished opening. When sewn-in eyelets are used for the leg bottom they shall measure 3/8 (± 1/8) inch in diameter. The eyelet stitching shall have at least four (4) overlapping stitches with the purling on the outside. See pattern for placement."

Paragraph 3.12.1 Seams and stitching. Line 4; After "turned-under or serged." add: "The garment shall have no raw edges including inside pockets."

Delete in lines 9 and 10 "The sewn eyelets for the bellows pockets shall have a minimum of 16 stitches.

The width of the bight of stitching shall not be less than 1/16-inch." without replacement.

TABLE X. Seams and stitch types. - Continued. : After Row 2 for "Setting of cargo and lower leg pocket flaps", add the following row:

"Pocket edge stitching"

Ssa-1 3/16 to 5/16-inches from edge

502, 503 or 504"

TABLE XI. Bar-tack placement. - Continued: (Row 2 of Table XI for Gusset (see Figure 6)), Row 2: On both a.and b. delete first 2 lines, "Superimposed on outside points (through all layers)" and replace with

"Superimposed on outside points (through all seams)."

P a g e | 4

Additional notes for GL/PD 15-05F:

1. Regarding paragraph 3.9.3 Insect protection/identification/care label (All Classes) and paragraph 3.9.4 Hang tag, insect protection (All Classes).

Where label description calls for "Insect Repellent Brand Name", the brand name shall be printed in standard text (to match the rest of the label) rather than the company's proprietary logo.

2. Wherever seam stitching or topstitching is meant to end at a bartack stitching shall stop at the bartack within 1/8" tolerance. The opening shall not be made smaller due to stitching past the bartack.

3. All garment pieces shall be cut and assembled with the warp in line with the directional line markings (often labeled “Cut on warp”) as marked on the government-furnished pattern, including pockets and small pieces (see paragraph 3.11).

4. Reference GL/PD 15-05F Table XI, Waistband attachment: regardless of attachment method used, stitching shall continue across fly to edge of trouser front.

5. GL/PD 15-05F paragraph 3.11 states “The Government patterns provide a seam allowance of 1/2-inch for side seams, shoulder seams, and sleeve seams, 3/8-inch allowance for collar and all other seams, except where otherwise specified. Pockets, pocket flaps, elbow patches, cuffs, collar, patch loop tape, other hook and loop fastener tape, and bar-tacks shall be located in accordance with marks on patterns and table references. Minor modifications to the pattern are permitted where necessary to accommodate manufacture’s processes to include garment treatments and use of automatic equipment. These modifications shall not alter the final design, serviceability, appearance or final finished measurements.” ENSURE THAT THE

FINISHED DIMENSIONS ARE MET.

7. Stamps may be used in the interior of the garment for vendor tracking or processing purposes.

When stamps are used, they shall be positioned so that they are not visible from the outside of the garment when worn. Any bleed-through or positioning of the stamp that makes it visible from the outside of the garment when worn is considered a major defect #164. The underside of flaps and the space between the pocket top and pocket flap or cuff tab and cuff are considered visible when worn because they will be visible when opened.

8. For garments manufactured by a subcontractor, the Identification and Care label (see paragraph 3.9.2), “Contractor Name” section shall read: "Manufactured by (subcontractor name) for (prime contractor name)". Identification and Care label shall state whether the uniform is Style A (unisex) or Style B (female).

9. All specifications outlined in GL/PD 15-05F shall be the most current specification listed on Assist unless outlined in this document.

Interim changes to reference documents This section last updated: 11.17.2020

P a g e | 5

MIL-DTL-32439

Rev B, dated 06 Oct 2020

Type IV, Class 1, Style H (OCP)

DLA Troop Support C&T AQAR Page 10 of 38, par. 2.1, line 4, after "(DCMA QAS)" add", or Supplier's Source Sampling Representative, as applicable"

Page 11 of 38, par. 2.3, line 2, delete "to the source QAS". Line 4, delete "source QAS" and replace with "Supplier' s Source Sampling Representative". Page 12, par 2.3 (continued), delete "source QAS" and replace with "Supplier's Source Sampling Representative".

Page 12 of 38, par. 2A, line 5, delete "as required" and replace with "if required".

Page 12 of 38, par. 3.1.1, after "entirely" add the following: "For routine shade or physical testing offabric lots, Government sampling is not required. The DD Form 1222 for routine shade or physical testing of fabric lots shall be signed and dated by the Supplier's Source Sampling Representative in Box 15."

Page 13 of 38, par. 3.1.2 - line 10, after "Government QAS" add the following: "or Supplier's Source Sampling Representative, as applicable,"

Page 14 of 38, par. 3.2.1 - lin:e 4, delete "source QAS" and replace with '.'Supplier's Source Sampling Representati ve".

Page 14 of 38, par. 3.2.1.1 - cutting swatches, delete "DCMA QAS" and replace with "Supplier's Source Sampling Representative". After " single color rolls - 4"x 24"" delete " QAS" and replace with "Supplier's Source Sampling Representative". After "multi-color camouflage"... delete "QAS" and replace with "Supplier's Source Sampling Representative".

Page 14 of 38, par. 3.2.1.2- line 3, delete "stamped,". Line 4, Delete "source QAS" and replace with "Supplier's Source Sampling Representative" ·

Page 15 of 38, par. 3.2.1.4- subpar. 2, delete "source QAS" and replace with "Supplier's Source Sampling Representative"

Page 15 of 38, par. 3.2.2 - Line 3, delete "stamped,", delete "source QAS" and replace with "Supplier's Source Sampling Representative". Line 4, delete "QAS" and replace with "Supplier's Source Sampling Representative". ·

Page 16 of 38, par. 3.3.1 -Line 2, after "(30)" add, "calendar". Line 3 and Line 6, after "QAS" add, "or Supplier's Source Sampling Representative"

Page 16 of 38, par. 3.3.2-Delete the paragraph in its entirety, including subparagraphs labeled "a" through "i", and replace with the following:

P a g e | 6

"3.3.2. Contractor Furnished Material (CFM). DLA Troop Support Clothing and Textiles contracts require source sampling of CFM at finishing plants. The following provisions apply to sample selection and lot acceptance.

The samples shall be randomly selected by the Supplier's Source Sampling Representative.

Upon presentation of a lot, the Supplier' s Source Sampling Representative will draw samples and forward the samples to the contractor's laboratory specified in the contract for testing.

Shipment of Component Lots from the source to the prime contractor need not be deferred except for Government Acceptance Testing (i.e., shade evaluation). Commencement of production prior to receipt of a passing test report from the contractor's authorized laboratory is solely at the contractor's risk.

The contractor will provide copies of Certificates of Compliance to the QAS.

The contractor is required to ensure that a complete test report for all lots is furnished to the source's QAS and the appropriate DLA-PTC representative."

Pages 24, 25, 36 add to block 16: "By signing in box 15, I certify that the samples referenced above were randomly selected and represent the lot identified above.

**Special note: Contractors shall ensure that blocks 2 and 15 of the form DD1222 are updated to reflect the correct information. Historically, both blocks contained the information of the DCMA QAR and their stamp/signature. When contractor's representative samples, these blocks shall include the contractor's representative's information. Block 17 shall still include the DCMA QAR to receive the results of the report even though they may not be sampling the material to be tested.

V-B-871F - Button, Sewing, Hole and Button Staple (plastic) CHANGES TO V-B-871F, BUTTON, SEWING HOLE, AND BUTTON STAPLE (PLASTIC), APPLICABLE TO

THIS CONTRACT ONLY:

Paragraph 2.2 Other publications.

Delete American Society for Testing and Material (ASTM) and change to ASTM INTERNATIONAL.

Delete ASTM’s contact address in its entirety and change to the following:

(Copies of documents are available online at www.astm.org or from the ASTM INTERNATIONAL, 100 Barr Harbor Drive, PO Box C700, West Conshohocken, PA 19428-2959.)

Paragraph 2.3 Order of Precedence. Add “Unless otherwise stated herein or in the contract,” to the beginning of the paragraph.

FED-STD-4 - Glossary of Fabric Imperfections

ADDITIONAL INFO FOR FED-STD-4 GLOSSARY OF FABRIC IMPERFECTIONS:

REVISION B: 7/29/64; AMENDMENT 2: 9/12/75

http://www.astm.org/

P a g e | 7

NOTICE 1, DATED 10/1/87.

DEV. TO FED. STD. 4B & AM. 2, PAGE 2, SEC.I. PARA. 2.1. IN IMPERFECTION COMMERCIAL

TERMINOLOGY AND GLOSSARY NO. COLUMNS, AFTER SHADE BAR - 14 INSERT: "SHADED

CLOTH-61B".

PAGE 8 PARA. 3.4, GLOSSARY NO. "61A- OFF SHADE", IN "DEFINITION" COLUMN, DELETE ":

SHADED SIDE TO SIDE, SIDE TO CENTER OR END TO END".

ADD NEW GLOSSARY NO. "SHADED CLOTH "61B-SHADED CLOTH (SHADED SIDE TO SIDE, SIDE

TO CENTER OR END TO END) WITH THE FOLLOWING DEFINITION: "COLOR DIFFERENCE

BETWEEN THE RESPECTIVE CLOTH AREAS".

PAGE 22, SECTION III, PARAGRAPH 2.1, IN "IMPERFECTION COMMERCIAL TERMINOLOGY" AND

GLOSSARY NO." COLUMNS, AFTER "SHADE BAR-15" INSERT: "SHADED CLOTH - 62A"

PAGE 27, PARAGRAPH 3.4, GLOSSARY NO. "62-OFF SHADE" IN "DEFINITION" COLUMN DELETE:

"SHADED SIDE TO SIDE, SIDE TO CENTER OR END TO END".

ADD NEW GLOSSARY NO, "62A-SHADED CLOTH (SHADED SIDE TO SIDE, SIDE TO CENTER OR

END TO END)" WITH THE FOLLOWING DEFINITION: "COLOR DIFFERENCE BETWEEN THE

RESPECTIVE CLOTH AREAS."

DEVIATION FROM FED. STD. 4B, AND AMEND 2:

PG 2, SECTION 1, PARA.2.1, IN "IMPERFECTION COMMERCIAL TERMINOLOGY" AND "GLOSSARY

NUMBER" COLUMNS, AFTER "SHADE BAR-14", INSERT: "SHADED CLOTH 61B".

PG 8, PARA.3.4, GLOSSARY NUMBER "61A-OFF SHADE" IN "DEFINITION" COLUMN, DELETE,

"SHADED SIDE TO SIDE, SIDE TO CENTER OR END TO END".

ADD NEW GLOSSARY NO."61B SHADED CLOTH "SHADED SIDE TO SIDE, SIDE TO CENTER OR END

TO END" WITH THE FOLLOWING DEFINITION; "COLOR DIFFERENCE BETWEEN THE

RESPECTIVE CLOTH AREAS."

PAGE 22, SECTION III, PARAGRAPH 2.1, IN "IMPERFECTION COMMERCIAL TERMINOLOGY" AN

GLOSSARY NO." COLUMNS, AFTER "SHADE BAR-15" INSERT: "SHADED CLOTH - 62A"

PAGE 27, PARAGRAPH 3.4, GLOSSARY NO "62-OFF SHADE" IN "DEFINITION" COLUMN DELETE:

"SHADED SIDE TO SIDE, SIDE TO CENTER OR END TO END".

ADD NEW GLOSSARY NO, "62A-SHADED CLOTH (SHADED SIDE TO SIDE, SIDE TO CENTER OR

END TO END)" WITH THE FOLLOWING DEFINITION: "COLOR DIFFERENCE BETWEEN THE

RESPECTIVE CLOTH AREAS."

A-A-50198A - Thread, Gimp, Cotton, Buttonhole

ADDITIONAL INFORMATION FOR A-A-50198A

P a g e | 8

NO ADDITIONAL INFORMATION

A-A-50199A - Thread, Polyester Core, Cotton or Polyester-Covered

ADDITIONAL INFORMATION FOR A-A-50199A

PAGE 2, DELETE SECTION 4 IN ITS ENTIRETY AND SUBSTITUTE:

"4. PRESERVATION, PACKING AND MARKING.

4.1 PRESERVATION, PACKING AND MARKING SHALL BE SPECIFIED IN THE CONTRACT OR

ORDER. (SEE 5.2)."

PAGE 3,

PARAGRAPH 5.2 ADD "e. PACKAGING REQUIREMENTS (SEE 4.1)

PARAGRAPH 5.3, AFTER LINE 2,

DELETE REMAINDER AND SUBSTITUTE: "AVAILABLE ONLINE AT http://assist.daps,dla.mil".

CHANGES TO THREAD, POLYESTER CORE, COTTON OR POLYESTER-COVERED;

A-A-50199A, DATED JULY 31, 2006, APPLICABLE TO THIS CONTRACT ONLY:

TABLE II DELETE THE COLORFASTNESS ROW IN ITS ENTIRETY AND REPLACE WITH THE

FOLLOWING:

COLORFASTNESS:

LAUNDERING (AFTER 3 CYCLES) 3-4 MIN AATCC 61 TEST 3A 3/, 4/

DRY HEAT AT 376 degrees +/- 6 degrees F 3-4 MIN. AATCC 117 3/ LIGHT (AFTER 40 HRS OR 170kJ) 3-4 MIN. AATCC 16 OPTION 1 OR 3 3/

WET DRY-CLEANING (WHEN SPECIFIED) 3-4 MIN. AATCC 132 3/, 5/

PERSPIRATION (WHEN SPECIFIED) 3-4 MIN. AATCC 15 3/, 5/

WEATHERING (AFTER 80 HRS) 3-4 MIN. AATCC 169 3/

(WHEN SPECIFIED)

DELETE 3.11 IN ITS ENTIRETY AND REPLACE WITH THE FOLLOWING:

3.11 TOXICITY. THE FINISHED THREAD SHALL NOT PRESENT A HEALTH HAZARD AND SHALL

SHOW COMPATIBILITY WITH PROLONGED, DIRECT SKIN CONTACT WHEN TESTED AS

SPECIFIED IN 4.1. CHEMICALS RECOGNIZED BY THE ENVIRONMENTAL PROTECTION AGENCY

(EPA) AS HUMAN CARCINOGENS SHALL NOT BE USED.

DELETE 4.1 IN ITS ENTIRETY AND REPLACE WITH THE FOLLOWING:

P a g e | 9

4.1 TOXICITY TEST. WHEN REQUIRED (SEE 7.5), AN ACUTE DERMAL IRRITATION STUDY

AND A SKIN SENSITIZATION STUDY SHALL BE CONDUCTED ON LABORATORY ANIMALS. WHEN

THE RESULTS OF THESE STUDIES INDICATE THE heat IS NOT A SENSITIZER OR IRRITANT, A REPEAT INSULT PATCH TEST SHALL BE PERFORMED IN

ACCORDANCE WITH THE MODIFIED DRAIZE PROCEDURE. (SEE 7.3). IF THE TOXICITY

REQUIREMENT (SEE 3.11) CAN BE DEMONSTRATED WITH HISTORICAL USE DATA, TOXICITY

TESTING MAY NOT BE REQUIRED (SEE 7.5).

DELETE 7.3 OTHER PUBLICATIONS IN ITS ENTIRETY AND REPLACE WITH THE FOLLOWING:

REPEAT INSULT PATCH TEST - MODIFIED DRAIZE PROCEDURE -

PRINCIPLES AND METHODS OF TOXICOLOGY, (FOURTH EDITION) A WALLACE HAYES (EDITOR),

PP 1057- 1060,200 1.

(COPIES ARE AVAILABLE ONLINE AT HTTP://WWW.TAYLORANDFRANCIS.CO.UKL OR FROM

TAYLOR AND FRANCIS, 325 CHESTNUT STREET , PHILADELPHIA PA 19106.)

DELETE PARAGRAPH 7.4 IN ITS ENTIRETY AND CHANGE TO THE FOLLOWING:

7.4 STANDARD SAMPLES AND PATTERN DRAWINGS, ADDRESS THE CONTRACTING ACTIVITY

ISSUING FOR BIDS OR REQUEST FOR PROPOSAL.

DELETE IN PARAGRAPH 7.5 LINES F. AND G. IN THEIR ENTIRETY AND REPLACE WITH THE

FOLLOWING:

F. WHEN TOXICITY TESTING IS REQUIRED (SEE 3.11)

G. PRODUCT CONFORMANCE PROVISIONS (SEE 5.1)

H. PACKAGING REQUIREMENTS (SEE 6.1)

A-A-55126B - Fastener Tape, Hook and Loop, Synthetic

Interim changes to A-A-55126B, dated 09/07/2006, applicable to this contract only:

Page 1, Paragraph 2. Classification, line 2, delete “document:” and substitute “document. The color required as listed in 2.3 will be as stated in the contract or procuring activity (see 7.8).”

Add paragraph 2.3. Colors (as specified): (hook and loop)

Solids: Foliage Green 504 Tan 499 Coyote 498 Green 520 Camouflage Green (CG) 483

Camouflage: Universal Camouflage Pattern (UCP)

Operation Enduring Freedom Camouflage Pattern (OCP)

P a g e | 10

Page 4, Table I, Physical Requirements, Characteristic, Shear Strength, delete “lbs/sq inch (min)” and substitute “lbs/2 sq inch (min)”.

Page 5, Table II, Physical requirements; Characteristic, Length Dimensional Stability, % (max);

Loop, all classes delete “.0” and substitute “4.0”.

Page 5, Paragraph 3.5.1 Visual Shade Matching. Delete "cloth" in line 1 and replace with "hook and loop".

Page 5, After Table III, add new Table IIIa:

“Table IIIa. Colorfastness requirements for OCP

Colors Laundering Light (40 hrs or Perspiration Crocking Evaluation: 4 cycles) 170KJ) 2/ min) Acid & Alkaline) 3/ (min) 1/(min.) 1/ (min)

All Colors 3-4 3-4 3.5

Dk. Green 528 3-4 Brown 529, Dark Browns30

Cream 524, Tan 525 3 Pate Green 526 Olive 527

1/ Rated using the AATCC Gray Scale for Color Change and AATCC Gray Scale for Staining.

2/ Rated using the AATCC Gray Scale for Color Change.

3/ Rated using the AATCC 9-step Chromatic Transference Scale.”

Page 6, Paragraph 3.6 Spectral Reflectance, first line, delete "Foliage Green 504" and substitute "the color as specified in the contract or procuring documents".

Page 6, paragraph 3.6.1, first line, after the word "data" add "for all specified colors"

Page 6, delete Table IV and substitute the following:

“Table IV. Spectral Reflectance Requirements, Reflectance Values % (Solids)

Spectral Reflectance Values - Solids

Wavelength Foliage Green Camouflage Tan Coyote (Nanometers) Green 504 520 Green 483 499 498 min max min max min max min max min max 600 8 26 5 20 3 10 8 26 8 20

P a g e | 11

620 8 26 5 19 3 10 8 26 8 20 640 8 28 5 21 3 10 8 30 8 22 660 10 30 9 22 3 12 8 34 8 24 680 10 34 10 23 3 14 12 38 12 24 700 12 38 12 33 4 28 12 40 12 34 720 16 42 15 37 5 40 16 46 16 42 740 16 46 21 44 10 52 22 50 22 46 760 18 48 28 50 18 56 30 50 30 50 780 18 48 33 51 20 56 34 54 34 54 800 20 50 38 52 24 58 36 56 36 56 820 22 54 38 54 30 60 38 58 38 58 840 24 54 39 55 38 60 38 58 38 58 860 26 56 39 58 40 60 40 60 40 60”

Page 6, Add 3.6.1.1 Spectral Reflectance Test (Camouflage Patterns).

The reflectance values for the loop side if printed in a camouflage pattern as specified in the contract or procuring documents shall match the spectral reflectance values as stated in the end items specified camouflage document.

Page 7 - 11

Delete paragraphs 3.10 to 3.10.2.1 and substitute the following:

3.10 Fray resistance. Unless otherwise specified by the contract or end item document, all hook and loop fastener tapes (except the Type IV Class 4 hook fastener tape) shall exhibit resistance to fraying when tested as specified below using either 3.10.1 or 3.10.2. as specified in paragraph 7.8.

3.10.1 Fray resistance for slip tape procedure (any width). Five (5) specimen each of the hook and loop fastener tapes shall be tested in accordance with AATCC 135, Option 3, V, Aiii for fray resistance after three (3) launderings, and in accordance with AATCC 132 for fray resistance after one dry cleaning, or commercial dry cleaning using AATCC 158 perchloroethylene (if required by contract). Specimen shall be 10-inches long and full width and shall be prepared for testing by slitting lengthwise up the middle for a distance of 8-inches. Each hook and loop shall be laundered separately. After laundering, or dry cleaning, or when tap es with slit selvages are furnished, the center and outside edges slit edges shall also be examined for fraying. The hook and loop fastener tapes shall show no more than 1/32-inch fraying after laundering or dry cleaning (when applicable). In addition, ultrasonically slit fastener tapes shall be tested for fraying.

(Paragraphs 3.10.2 - 3.10.2.1.2 for Fray resistance for test pad procedure are deleted pending R&D;

paragraphs may be reinstated at a later time)

Page 11, Table VII, FOR ACU FAMILY CONTRACTS, use colorfastness requirement for “All Other Colors (3 cycles)”, AATCC 61, Option 2A.

P a g e | 12

Page 11, Table VII, delete the following row:

“Fray Resistance 3.10 3.10.1 –3.10.2.1.2”

And substitute the following:

“Fray resistance slit 3.10.1 3.10.1

Page 12, Footnote 13/: delete and substitute, “Option 3A shall be used on all Camouflage Shades as specified in the contract or procuring documents. All other solid colors shall be tested using Option 2A.)

Page 14, para 7.2.1, delete second sentence in its entirety without replacement.

Page 14, para 7.3.1, line 5, delete "Universal shade" without replacement.

Page 14, para 7.3.4, delete and substitute:

“7.3.4 Fray resistance for test pad procedure. This requirement provides assurance that any combination of hook and loop tapes i.e. selvage hook with non selvage loop, non selvage hook with non selvage loop, extruded hook with selvage loop or non selvage loop or options as specified in the contract, will not fray in the end item clothing and equipment item up to twenty-five (25) launderings.”

Page 15, para 7.8, delete and substitute:

“7.8 Ordering data. The contract or order should specify the following:.

a. Title, number, and date of this Commercial Item Description document

b. Types and Classes required (see 2.)

c. Width of fastener tapes required (see 3.3)

d. Solid color or camouflage pattern required (see 3.5)

e. Colorfastness to dry cleaning if required (see 3.5.2)

f. Use of spliced tape (see 3.9)

g. Fray resistance and slit test procedure (all widths) requirements (see 3.10.1)

h. Fray resistance pad procedure end item requirements (3.10.2)

i. Length and put-up required (see 3.11)

j. Product conformance provisions (see 5.)

k. When toxicity testing is required ( see 3.12)

l. Acceptance criteria and lot size (see 5.3)

m. Packaging (see 6.1)

n. Standard samples (see 7.3)”

MIL-DTL-32075 - Label: For Clothing, Equipage, and Tentage (General Use)

ADDITIONAL INFORMATION FOR MIL-DTL-32075:

P a g e | 13

MIL-DTL-32075, LABEL FOR CLOTHING, EQUIPAGE, AND TENTAGE, GENERAL USE REPLACES

DDD-L-20

INTERIM SPECIFICATION CHANGES TO MIL-DTL-32075:

Page 4, para. 3.3.5, after "Type III or IV, Class 4 of" delete "DDD-L-20" and replace "MIL-DTL 32075,".

Page 6, TABLE I, "Physical requirements of the Type VI finished label" Under "Tearing strength" delete: "(lb.) minimum" and substitute: "(gms) minimum"

Page 12, Para 3.3.2.17, after "NSN" add "and the Universal Product Code (UPC) supplied by the Government, for all NSN"s."

MIL-C-44296 - Cloth, Fusible

ADDITIONAL INFORMATION FOR MIL-C-44296:

INTERIM SPECIFICATION CHANGES TO MIL-C-44296A:

PAGE 1, PARAGRAPH 1.1, SCOPE., LINE 1: AFTER "AND" INSERT "STITCH-REINFORCED

NONWOVEN".

PAGE 1, PARAGRAPH 1.2. CLASSIFICATION. BELOW "TYPE IX" ADD "TYPE X - CIRCULAR KNIT

SUBSTRATE"

PAGE 1, PARAGRAPH 1.2, LINE 12: BETWEEN "TYPE X-CIRCULAR KNIT SUBSTRATE" AND "CLASS

1" INSERT "TYPE X1- "STITCH-REINFORCED NONWOVEN".

PAGE 2, PARAGRAPH 2. APPLICABLE DOCUMENTS ADD FOLLOWING NEW PARAGRAPH: "2.1.3

OTHER PUBLICATIONS. THE FOLLOWING DOCUMENTS FORM A PART OF THIS DOCUMENT TO

THE EXTENT SPECIFIED HEREIN. UNLESS OTHERWISE SPECIFIED, THE ISSUES OF THE

DOCUMENTS WHICH ARE DOD ADOPTED SHALL BE THOSE LISTED IN THE ISSUE OF THE

DODISS SPECIFIED IN THE SOLICITATION. UNLESS OTHERWISE SPECIFIED, THE ISSUES OF THE

DOCUMENTS NOT LISTED IN THE DODISS SHALL BE THE ISSUES OF THE NONGOVERNMENT

DOCUMENTS WHICH ARE CURRENT ON THE DATE OF THE SOLICITATION.

AMERICAN ASSOCIATION OF TEXTILE CHEMISTS AND COLORISTS (AATCC) AATCC 20 - FIBER

ANALYSIS QUALITATIVE (APPLICATIONS FOR COPIES SHOULD BE ADDRESSED TO AMERICAN

ASSOCIATION OF TEXTILE CHEMISTS AND COLORISTS (AATCC), P.O. BOX 12215, TRIANGLE

PARK, NC 27709-2215)"

PAGE 3, ADD THE FOLLOWING NEW PARAGRAPH: "3.1.2.10 TYPE X. TYPE X SHALL BE A

CIRCULAR KNIT. WHEN SPECIFIED (SEE 6.2), THE FACE SIDE SHALL BE NAPPED."

PAGE 3: AFTER PARAGRAPH 3.1.2.10, ADD THE FOLLOWING: "3.1.2.11 TYPE X1. TYPE X1 SHALL

BE STITCH- REINFORCED NONWOVEN WHEREBY A SERIES OF CHAINSTITCHING IS SEWN IN

P a g e | 14

THE MACHINE DIRECTION OF THE SUBSTRATE IN ORDER TO REINFORCE THE NONWOVEN

CONSTRUCTION."

PAGE 7, PARAGRAPH 3.4. PHYSICAL REQUIREMENTS. ADD THE FOLLOWING NEW TABLE

(TABLE VIIA) AFTER TABLE VII:

"TABLE VII. A PHYSICAL REQUIREMENTS FOR TYPE X

STYLE CLASS WEIGHT (INCLUDING BURSTING FIBER CONTENT

ADHESIVE) STRENGTH

OZ/SQ/YD. LBS. (MIN)

MINIMUM MAXIMUM

A 1,2,3 or 4 1.4 1.8 60 1/

1/ 100% NYLON OR POLYESTER."

PAGE 7, PARAGRAPH 3.4 PHYSICAL REQUIREMENTS.: AFTER TABLE"VIII" ADD NEW TABLE IX:

"TABLE IX, PHYSICAL REQUIREMENTS FOR TYPE XI

BREAKING STRENGTH

WGT, OZ/YD2 LBS, (MIN) STITCHING

STYLE CLASS MIN MAX MACH X-MACH CONTENT REINFORCEMENT

A 1,2,3 1.0 1.8 10.0 1.0 1/ 2/

1/ 50 TO 100 PERCENT POLYESTER WITH REMAINING PERCENTAGE NYLON OR RAYON.

2/ STITCH REINFORCEMENT CONDUCTED WITH SINGLE MULTIFILAMENT THREAD USING

CHAINSTITCH STITCH TYPE WITH CHAINSTITCH LOOPS ON FUSIBLE SIDE TO PROTECT FROM

UNRAVELING."

PAGE 7, PARAGRAPH 3.4.1. BONDING STRENGTH.

- LINE 2, DELETE "(EXCEPT CLASS 5)" AND SUBSTITUTE "(EXCEPT TYPE IX WHEN USED AS

FUSIBLE SEAM TAPE AND CLASS 5)".

- LINES 7 AND 8, DELETE "OR SHEETING MATERIAL".

PAGE 9, PARA. 4.2.2.1, LINE 22, DELETE "30" AND SUBSTITUTE "20". LINE 24, DELETE "45" AND

SUBSTITUTE "30".

PAGE 11, TABLE VIII. END ITEM TESTS UNDER TEST METHOD COLUMN, LINES 2 AND 3 DELETE

"1600" AND SUBSTITUTE "AATCC 20".

PAGE 12, PARAGRAPH 4.3.1.1. BONDING STRENGTH PROCEDURE (INITIAL AND AFTER

LAUNDERING/DRY CLEANING). DELETE THE FIRST AND SECOND SENTENCES IN THEIR

ENTIRETY AND SUBSTITUTE: "CUT A 12 INCH WARP BY 11 INCH FILLING SAMPLE FROM BOTH

THE OUTERSHELL AND FUSIBLE MATERIALS SPECIFIED FOR CONTRACT USE (SEE 6.5)."

PAGE 15: AT THE END OF PARAGRAPH 6.1.1, ADD THE FOLLOWING:

P a g e | 15

" E. STITCH REINFORCED NONWOVEN TYPE X1 OFFERS HIGH DEGREE

STRENGTH/STABILIZATION FOR TAPE AND STAY APPLICATION FOR LARGE OR SMALL PART

FUSIBLES AND IS INTENDED TO PROVIDE VERTICAL STABILITY AND ABRASION RESISTANCE."

PAGE 16, PARAGRAPH 6.5. BONDING STRENGTH DISPUTE PROCEDURE. INSERT THE

FOLLOWING BETWEEN THE FIRST AND SECOND SENTENCES: "IN SOME CASES, OUTERSHELL

SAMPLES REPRESENTATIVE OF SEPARATE PRODUCTION LOTS MAY BE USED TO DETERMINE IF

DIFFERENT FINISHES MAY AFFECT BONDING STRENGTH."

MIL-DTL-5038 - Tape, Textile and Webbing, Textile, Reinforcing Nylon

ADDITIONAL INFORMATION FOR MIL-DTL-5038:

CHANGES TO MIL-DTL-5038J, TAPE, TEXTILE AND WEBBING, TEXTILE, REINFORCING, NYLON, (NOVEMBER 5, 1996), APPLICABLE TO THIS CONTRACT ONLY:

PARAGRAPH 2.3 NON-GOVERNMENT PUBLICATIONS. DELETE TINES 1-4 AND CHANGE TO THE

FOLLOWING:

2.3 NON-GOVERNMENT STANDARDS AND OTHER PUBLICATIONS. THE FOLLOWING

DOCUMENTS FORM A PART OF THIS DOCUMENT TO THE EXTENT SPECIFIED HEREIN. UNLESS

OTHERWISE SPECIFIED, THE ISSUES OF THE DOCUMENTS ARE THOSE CITED IN THE

SOLICITATION OR CONTRACT.

DELETE AMERICAN SOCIETY FOR TESTING AND MATERIAL (ASTM) AND CHANGE TO ASTM

INTERNATIONAL.

DELETE ALL TEST METHODS (61, 16, 11 IA) UNDER AMERICAN ASSOCIATION OF TEXTILE

CHEMISTS AND COLORISTS (AATCC) AND CHANGE TO THE FOLLOWING:

AATCC TEST METHOD 16 - COLORFASTNESS TO LIGHT

AATCC TEST METHOD 61 - COLORFASTNESS TO LAUNDERING: ACCELERATED

AATCC TEST METHOD ILL -WEATHER RESISTANCE OF TEXTILES: EXPOSURE TO DAYLIGHT AND

WEATHER

AATCC EVALUATION PROCEDURE 1, GRAY SCALE FOR COLOR CHANGE

AATCC EVALUATION PROCEDURE 2, GRAY SCALE FOR STAINING

AATCC EVALUATION PROCEDURE 8, AATCC 9-STEP CHROMATIC TRANSFERENCE SCALE

AATCC EVALUATION PROCEDURE 9, VISUAL ASSESSMENT OF COLOR DIFFERENCES OF

TEXTILES

PARAGRAPH 2.4 ORDER OF PRECEDENCE.

P a g e | 16

ADD TO THE BEGINNING OF THE FIRST SENTENCE: "UNLESS OTHERWISE STATED HEREIN OR

IN THE CONTRACT,".

PARAGRAPH 3.1 SAMPLES. DELETE LAST SENTENCE IN ITS ENTIRETY WITHOUT

REPLACEMENT.

PARAGRAPH 3.4.3 MATCHING. DELETE IN IT'S ENTIRETY AND CHANGE TO THE FOLLOWING:

3.4.3 MATCHING. THE TAPE AND WEBBING SHALL BE A GOOD MATCH TO THE COLOR

STANDARD SAMPLE WHEN TESTED AS SPECIFIED IN 4.3.3.1.

PARAGRAPH 3.4.4, LINE 3 COLORFASTNESS. DELETE "THE END ITEM TESTING TABLE" AND

CHANGE TO "TABLE II".

PARAGRAPH 3.5.1, LINE 2 RESISTANCE TO LIGHT AND HEAT. DELETE "OPTION A" AND CHANGE

TO "OPTION 1 OR 3".

4.3.3 TABLE II, THIRD ROW:

LAUNDERING, COLUMN 3, ADD "7/" BESIDE "2/"

LIGHT, COLUMN 1, ADD (20hrs OR 85kJ)

LIGHT, COLUMN 3, DELETE "OPTION A" AND CHANGE TO "OPTION 1 OR 3" 8/

ADD OR DELETE THE FOLLOWING FOOTNOTES TO THE END OF TABLE II AS NOTED.

4.3.3 TABLE II, FOOTNOTE 5/ LINES 2 AND 6. DELETE THE "A" AFTER "111" WITHOUT

REPLACEMENT.

ADD FOOTNOTE 7/ RATED USING THE AATCC EVALUATION PROCEDURE 1, GRAY SCALE FOR

COLOR CHANGE AND AATCC EVALUATION PROCEDURE 2, GRAY SCALE FOR STAINING.

ADD FOOTNOTE 8/ RATED USING THE AATCC EVALUATION PROCEDURE 1, GRAY SCALE FOR

COLOR CHANGE.

ADD PARAGRAPH, 4.3.3.1 AFTER THE FOOTNOTES

4.3.3.1 VISUAL SHADE MATCHING EVALUATION. THE COLOR AND APPEARANCE OF THE TAPES

AND WEBBING SHALL MATCH THE STANDARD SAMPLE WHEN VIEWED USING THE AATCC

EVALUATION PROCEDURE 9, OPTION A OR C, WITH SOURCES SIMULATING ARTIFICIAL

DAYLIGHT D75 ILLUMINANT WITH A COLOR TEMPERATURE OF 7500 (+200)degrees K

ILLUMINATION OF 100 (± 20) FOOT CANDLES, AND SHALL BE A GOOD MATCH TO THE

STANDARD SAMPLE UNDER INCANDESCENT LAMPLIGHT AT 2856 (+200)degrees K.

P a g e | 17

CO/PD-06-05 - Patch and Brassard, Identification, Infrared Retroflective

ADDITIONAL INFORMATION FOR CO/PD-06-05:

Note recent revision to CO/PD-06-05A, dated 10 November 2011

10 November 2011 version supersedes 4 December 2007 version of document with same name.

MIL-DTL-32439

Rev A dated 12 June 2017 Type IV, Class 1, Style H (OCP)

ANSI/ASQC Z1.4 - American National Standard Sampling Procedures and Tables for Inspection by Attributes

ADDITIONAL INFORMATION FOR ANSI/ASQC Z1.4:

Updated version: ANSI/ASQ Z1.4-2008.

SAE-AMS-STD-595 - Colors Used in Government Procurement

ADDITIONAL INFORMATION FOR SAE-AMS-STD-595:

COPIES OF FED-STD-595 CAN BE OBTAINED FROM:

GENERAL SERVICES ADMINISTRATION - FEDERAL SUPPLY SERVICE BUREAU

SPECIFICATION SECTION, SUITE 8100

470 EAST L'ENFANT PLAZA, SW

WASHINGTON, DC 20407

PHONE (202) 619-8925.

Commercial sources are also available

GOVERNMENT LABORATORY TESTING OF CLOTH AND END ITEMS

This section last updated: 8.1.19

The use of electronic submission of DD form 1222 is authorized.

NOTE: AQAR Section 3.2 Government Acceptance Testing states that “Unless otherwise stated in the contract, testing performed at the DLA PTC for acceptance purposes will be completed in forty five (45) calendar days” – CURRENT contracts state 30 days and will remain applicable for all current and future BDU item contracts.

P a g e | 18

Physical testing of materials

Refer to DLA TROOP SUPPORT C&T AQAR for more information on the Source Sampling program (also see updates to this in the “Lot formation and testing for components” section of this document).

For physical (non-shade) testing, in accordance with DLA TROOP SUPPORT C&T AQAR, Part I, the contractor's approved qualified laboratory will be required to forward a completed test report for each lot of cloth to the address below. The QAR will forward the completed DD form 1222.

Samples for physical testing will only be forwarded upon request to:

DLA Product Testing Center Analytical 700 Robbins Avenue Philadelphia, PA 19111 Attn: Bldg 5D Email: paactlab@dla.mil

End item testing

In accordance with DLA TROOP SUPPORT C&T AQAR, Part 1, section 6. (7), all end item test reports shall be provided to the Government for review under the source sampling program.

For ACU Trouser end item testing requirements, GL/PD 15-05FA, Table XI and terms of contract.

For ACU Coat end item testing requirements, see GL/PD 15-04B, Table IX and terms of contract.

All contractor test reports for permethrin testing shall be sent electronically to:

amy.l.johnson2.civ@mail.mil bduteamlabs@dla.mil

All contractor test reports for other end item tests shall be sent electronically to:

Jessica.Raushel@dla.mil

SHADE EVALUATION REQUIREMENTS

This section last updated: 11/25/2019

Shade standards applicable to ACU items

The color of the test specimen shall match the standard sample viewed using AATCC Evaluation Procedure 9, Option A, with sources simulating artificial daylight D75 illuminant with a color temperature of 7500 (+/- 200)°K, with illumination of 100 (+/- 20) foot candles, and shall be a good match to the standard sample under incandescent lamplight at 2856 (+/- 200)°K.

mailto:paactlab@dla.mil mailto:amy.l.johnson2.civ@mail.mil

P a g e | 19

Operational Camouflage Pattern (OCP) Garments

Standard sample for Cloth, Operational Camouflage Pattern conforming to GL/PD 15-04F, paragraph 3.4.1 is available on roll no. 3963 and is applicable for Shade, Appearance, and IR Spectral Reflectance. This standard shall apply before and after permethrin treatment, when applicable.

Standard sample for Reinforcement and patch cloth, conforming to MIL-DTL-32439 Type IV, Class 1, Style H (OCP). shall be Standard Roll # 3937 and is applicable Shade, Appearance, Colorfastness and IR Spectral Reflectance. This standard shall apply before and after permethrin treatment, when applicable.

In order to properly assess shade on OCP material , the government will need 24” lengthwise x 30” widthwise shade swatches. This may deviate from current practices for other camouflage printed materials. Samples smaller than the required measurement of 24” x 30” will not be accepted for evaluation.

For fabrics printed with OCP, all color evaluations to include visual, spectral reflectance and colorfastness are to be performed on the solid color area and not the tonal area.

Shade evaluation of cloth

General

(a) SAMPLING: Notwithstanding any current provisions of the fabric specification, the following shade evaluation shall apply to this solicitation. Swatches will be cut by the Contractor from those pieces or rolls selected by the Government representative in accordance with the table below.

Swatches shall be 4 by 24 inches for single color cloth, 12 inches by full width for most multi-colored camouflage cloth, and 24 inches by full width for Operational Camouflage Pattern and Operation Enduring Freedom Camouflage Patter cloth.

Lot Size No. of Pieces to be Sampled

1 to 8 pieces Each piece

9 to 25 pieces 8 pieces

26 to 90 pieces 20 pieces

91 to 160 pieces 32 pieces over 160 pieces 1 of 5 pieces

The Government representative (QAR) shall ensure that each piece is cut in half and identify each half with the piece number from which it was cut. One set of swatches (one side of the roll from each of the full-width sampled rolls) and the tally list of piece numbers for each roll from the lot shall be forwarded to the DLA Product Testing Center for evaluation. The remaining swatches shall be retained at the plant for use by the Quality Assurance Representative (QAR).

P a g e | 20

If one or more of the shade swatches submitted are found unacceptable, the entire lot shall be rejected. A lot that was rejected for shade shall be screened and all pieces in the lot defective for shade shall be removed before such a lot is resubmitted. Resubmitted lots shall again be subjected to the sampling and shade evaluation prescribed herein. This requirement does not negate the Contractor's responsibility to perform shade evaluation prior to submittal of a lot to the Government.

Each roll of fabric acceptable for shade from which a shade piece has been removed shall be cut by the Contractor from selvage to selvage so that there will be no evidence of the shade piece cut-out. The portion removed shall not be included in the yardage indicated on the piece ticket. If the Contractor reworks and resubmits rolls originally rejected for shade or finish, it shall not combine the rejected rolls with other lots or with lots rejected for other causes. Such rejected rolls shall be combined to form one resubmitted lot. Each piece shall retain its original piece number, suffixed with an "X". The lot number shall also be suffixed with an "X".

(b) When Section 3 of the fabric specification contains a specific requirement for uniformity of shade and when the standard sample is referenced for uniformity of shade, the swatches submitted in accordance with (a) above shall also be evaluated for uniformity of shade.

(c) The Contractor shall transmit the swatches to:

DLA Product Testing Center Analytical 700 Robbins Avenue Philadelphia, PA 19111 Attn: Bldg 5D Email: Uraina.Gray-Scully@dla.mil

- When sending shade swatches to DLA do the following:

- Send a hard copy of the DD1222 with the swatches in the mail

The letter shall indicate "FOR GOVERNMENT SHADE APPROVAL" and contain the following information:

(1) Name of prime Contractor.

(2) Contract number.

(3) Nomenclature.

(4) Government inspection lot number.

(5) Number of swatches being submitted.

(6) QAR's name.

(7) Name and address of the QAR's base plant.

(8) Piece number of standard sample cited in contract.

(9) Tally list with piece numbers (not applicable to case swatching).

(d) If any swatches are rejected by the DLA Product Testing Center--Analytical for shade, those pieces from which the rejected swatches were cut will be removed from the lot. Each piece acceptable for shade from which a shade swatch has been removed shall be cut by the Contractor from selvage to mailto:Uraina.Gray-Scully@dla.mil

P a g e | 21 selvage so that there will be no evidence of the shade swatch cut-out. The portion removed shall not be included in the yardage indicated on the piece ticket.

(e) If the Contractor reworks and resubmits pieces originally rejected for shade or finish, it shall not combine the rejected pieces with normal production or with lots rejected for other causes. Such pieces shall be combined to form one resubmitted lot. Each piece shall retain its original piece number, suffixed with an "X". The lot number shall also be suffixed with an "X".

2-Stage Shade Evaluation program for Permethrin treated ACU material

Applicable for Class 2 ACU Coats and Trousers only

The following describes the staged process for shade evaluation of cloth to be permethrin treated after garment manufacture.

Samples and DD1222s shall be sent to DLA Product Testing Center at the address in section “C” above.

Stage I - OPTIONAL.

When the Contractor opts for Stage I shade evaluation is, the QAR at the Mill is responsible for ensuring that a 24 inch by full width for Operational Camouflage Pattern (OCP) and Operation Enduring Freedom Camouflage.

The QAR shall ensure that the header is cut in half and identify each half with the piece number from which it was cut. One set of swatches (one half header from each of the sampled rolls) and the tally list of piece numbers for each roll from the lot shall be forwarded to the DLA Product Testing Center for evaluation. The remaining swatches shall be retained at the plant for use by the Quality Assurance Representative (QAR). The QAR at the Mill shall complete a DD1222 in accordance with traditional procedures. If the given lot passes or fails Stage I, the fabric lot may move onto Stage II Evaluation at the Prime Contractor’s risk.

If Stage I evaluation pass or fails, the lot may proceed to Stage II. No DD3440 will be issued for a failing Stage I.

Stage II.

Prime Contractor shall notify the Mill which Permethrin Treatment Facility will perform final permethrin treatment. This is where the samples must be treated for Stage II.

The QAR at the Mill is responsible for ensuring that a 24 inch by full width (for OCP) header is cut from each of the appropriate number of rolls in accordance with the above sampling plan. This is in addition to the header cut for the optional Stage I, if Stage I applies. The QAR at the Mill shall arrange for a set of identifying tags for each roll to be forwarded to the applicable Permethrin Treatment Facility along with each header. Each header shall be cut in half and each piece shall be identified with the piece number from which it was cut.

P a g e | 22

After permethrin treatment, one set of swatches (one half header from each of the sampled rolls) and the tally list of piece numbers for each roll from the lot shall be forwarded to the DLA Product Testing Center for evaluation. The remaining swatches shall be retained at the plant for use by the Quality Assurance Representative (QAR). The QAR at the Mill shall complete a DD1222 in accordance with traditional procedures.

Pieces sent to the for evaluation shall be no smaller than 24 x 30 for OCP and shall have the identifier tags securely attached.

The QAR at the treatment facility shall complete a DD1222 using the same lot and sample numbers as originally used to represent the lot in Stage I; Blocks 2 and 4 shall be updated to reflect the contact information for the treatment facility and their QAR, Block 8 shall state “Stage II Shade,” and Block 13 shall contain the name of the Mill. If Stage I evaluation was done, the lab report number assigned by DLA Product Testing Center or Natick for the Stage I DD1222 must be clearly placed in block 16.

The Prime Contractor shall not cut the fabric until the Stage II has been approved via a DD 1222, or failed and accepted under a waiver via a DD 3440.

Before Contractor is permitted to cut cloth, passing/waived DD1222/DD3440 from Stage II evaluation is required.

Shade evaluation of components *Shade evaluation of components, for Tan 499, is hereby waived indefinitely. The contracting officer is able to require government shade evaluation at any point in time going forward on subject contract.

Initial purchase of the components below shall be submitted to DLA Product Testing Center for evaluation of shade. A "component" in this case means a specific size or type of material from a particular supplier; different sizes or types constitute different components and each size or type from each supplier should be separately sampled and evaluated, except as described in "Swatching for fastener tape" below. Upon receipt of a passing result for each component, there shall be no further requirement for government shade evaluation of that component for the duration of the contract, unless specifically requested by the contracting officer. In the case of failing results with waiver granted, additional testing shall be as directed by the contracting officer. Shade evaluation requirement for these listed components applies for all types and classes of ACU; material that is passed or waived may be used on any type or class of ACU under that contract, as permitted by specification. The Government reserves the right to require testing of individual components at any time. Shade evaluation of every lot of basic material is required for the life of the contract.

Trousers (GL/PD 15-05F):

Tape for FR Identification marker (only) – paragraph 3.5.1.2

Buttons - paragraph 3.5.4

P a g e | 23

Coats (GL/PD 15-04B):

Tape for IFF tab cover and FR Identification marker (Type III only) – paragraph 3.5.2 Buttons - paragraph 3.5.8

Loop fastener tape for sleeve pocket – paragraph 3.5.3

Components are subject to 1-stage shade evaluation only.

Component materials packaged as rolls (6 inch pieces cut from rolls) shall be sampled as follows:

Lot size Sample size 1 to 32 rolls 4 pieces 33 to160 rolls 8 pieces 161 to 320 rolls 10 pieces 321 to 500 rolls 12 pieces Over 500 rolls 12 pieces + 1 piece per 100 rolls

Component materials packaged as each shall be sampled as follows:

Lot size Sample size 1 to 5 pieces 1 piece 6 to100 pieces 5 pieces 101 to 1000 pieces 10 pieces 1001 to 10000 pieces 50 pieces Over 10000 pieces 100 pieces

Swatching for fastener tape:

Preference is for fastener tape to be sampled and submitted through the Supplier rather than the Prime Contractor. Any lot of fastener tape submitted for shade evaluation under a DD1222 must represent only one Prime Contractor. However, fastener tape may be sampled from the original master roll (before slitting) as long as traceability is maintained. Narrower widths of fastener tape cut from the master roll need not be re-submitted for shade testing, but a secondary DD1222 shall be prepared and attached to such cuts reflecting the original DD1222 information.

First Article Testing This section last updated: 10/02/2014

First Article Testing is required for Coats and Trousers of each Type of permethrin treated ACU item being made under each contract.

(a) The Contractor shall deliver 60 Coats or 60 Trousers (or 60 of each if both are on contract) within 135 calendar days from the date of this contract to the Government at the Permethrin Treatment Facility for first article tests. The shipping documentation shall contain this contract number and the Lot/Item identification. The characteristics that the first article must meet and the testing requirements are specified elsewhere in this contract.

P a g e | 24

60 coats or 60 trousers (or 60 of each if both are on contract) shall be made by the Contractor and sent to the Permethrin Treatment Facility. From this lot, samples shall be sent for testing as follows:

6 coats or 6 trousers (or 6 of each if both are on contract) size Medium-Regular or larger shall be sent for Government testing to:

USA NSRDEC, NATICK SOLDIER CENTER

15 Kansas Street, Building 5, Whittlesey Bldg ATTENTION: RDNS-WPW-T (Amy Johnson)

NATICK, MA 01760-5019

Samples sent to the Government shall be tested for Permethrin Application, Bite Protection and Shade conformance as described below.

3 coats or 3 trousers (or 3 of each if both are on contract) shall be tested by the Contractor’s Qualified Testing Facility for Permethrin Application at 0 and 20 launderings as described below.

Testing shall be done concurrently by both facilities, and Contractor’s Conditionally Qualified Testing Facility shall send results to Government for correlation. Government results shall determine final acceptability of First Article Test. In the event of disagreement between Contractor and Government test results, the Government shall investigate the cause of the disparity.

As described above, testing for the FAT shall consist of the following (paragraphs referenced from GL/PD 15-04B and GL/PD 15-05FD):

• Permethrin Application Test (Gas Chromatography test) o Requirement as stated in paragraph 3.4.1 o Method as stated in paragraph 4.5.1 o Samples will be tested after initial (treated unlaundered sample) and 20 launderings to correlate with Gas Chromatography test as in paragraph 4.5.1

• Bite Protection Test o Requirement as stated in paragraph 3.4.2 o Method as stated in paragraph 4.5.2 o Samples will be tested after initial (treated unlaundered sample) and after 20 and 50 launderings to correlate with Bite Protection test 4.5.2 and 4.5.2.1

• Shade conformance o Shade to match selected permethrin treated standard after treatment

(b) Within 90 calendar days after the Government receives the first article, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor.

A notice of disapproval shall cite reasons for the disapproval.

P a g e | 25

(c) If the first article is disapproved, the Contractor, upon Government request, shall submit an additional first article for testing. After each request, the Contractor shall make any necessary changes, modifications, or repairs to the first article or select another first article for testing. All costs related to these tests are to be borne by the Contractor, including any and all costs for additional tests following disapproval. The Contractor shall furnish any additional first article to the Government under the terms and conditions and within the time specified by the Government.

The Government shall act on this first article within the time limit specified in paragraph (b) of this clause. The Government reserves the right to require an equitable adjustment of the contract price for any extension of the delivery schedule or for any additional costs to the Government related to these tests.

(d) If the Contractor fails to deliver any first article on time, or the Contracting Officer disapproves any first article, the Contractor shall be deemed to have failed to make delivery within the meaning of the Default clause of this contract.

(e) Unless otherwise provided in the contract, the Contractor --

(1) May deliver the approved first article as a part of the contract quantity, provided it meets all contract requirements for acceptance and was not consumed or destroyed in testing; and

(2) Shall remove and dispose of any first article from the Government test facility at the Contractor’s expense.

(f) If the Government does not act within the time specified in paragraph (b) or (c) of this clause, the Contracting Officer shall, upon timely written request from the Contractor, equitably adjust under the Changes clause of this contract the delivery or performance dates and/or the contract price, and any other contractual term affected by the delay.

(g) The Contractor is responsible for providing operating and maintenance instructions, spare parts support, and repair of the first article during any first article test.

(h) Before first article approval, the acquisition of materials or components for, or the commencement of production of, the balance of the contract quantity is at the sole risk of the Contractor. Before first article approval, the costs thereof shall not be allocable to this contract for

(1) progress payments, or

(2) termination settlements if the contract is terminated for the convenience of the Government.

(i) The Government may waive the requirement for first article approval test where supplies identical or similar to those called for in the schedule have been previously furnished by the Offeror/Contractor and have been accepted by the Government.

The Offeror/Contractor may request a waiver.

(End of Clause)

P a g e | 26

Alternate I (Jan 1997). As prescribed in 9.308-2(a)(2) and (b)(2), add the following paragraph (j) to the basic clause:

(j) The Contractor shall produce both the first article and the production quantity at the same facility.

http://farsite.hill.af.mil/reghtml/regs/far2afmcfars/fardfars/far/09.htm#P274_49878

P a g e | 27

VERIFICATION PROGRAM FOR PERMETHRIN TREATMENT

This section last updated: 07/15/2016

*…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .