Attachment B - QASP.pdf
PDF 274 KB Posted
- Attached to
- Raven's Challenge Training Events Federal contract opportunity
- Solicitation number
- 15A00023R00000080
About this file
This document provides a Quality Assurance Surveillance Plan (QASP) for a federal contract to provide training events known as Raven's Challenge. The contractor will be responsible for exercise design and development, exercise execution, exercise documentation, improvement planning, and publishing a final after-action report. Performance will be monitored by a Contracting Officer's Representative (COR) according to a surveillance matrix that defines performance objectives, standards, and inspection methods. An annual performance assessment will be provided to the Contracting Officer. The contract valued at $15A00023R00000080 is a solicitation from the Department of Justice Bureau of Alcohol Tobacco Firearms and Explosives to provide Raven's Challenge Training Events.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 15A00023R00000080 Amendment 0001.pdf | ||
| Updated Attachment A - Labor Category Duties and Qualification.pdf | ||
| QUESTIONS AND ANSWERS.pdf | ||
| Attachment C - PAST AND PRESENT PERFORMANCE SURVEY.docx | DOCX document | |
| Attachment A - Labor Category Duties and Qualification.pdf | ||
| Solicitation 15A00023R00000080.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Quality Assurance Surveillance Plan (QASP)
1. Purpose
This Quality Assurance Surveillance Plan is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the detailed process for a continuous oversight process:
• What will be monitored
• How monitoring will take place
• Who will conduct the monitoring
• How monitoring efforts and results will be documented
The contractor is responsible for implementing and delivering performance that meets contract standards using its Quality Control Plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to assure that it meets contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.
The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.
The government may provide a copy of the QASP to the contractor to facilitate open communication. In addition, the QASP should recognize that unforeseen or uncontrollable circumstances might occur that are outside the control of the contractor.
Bottom line, the QASP should ensure early identification and resolution of performance issues to minimize impact on mission performance.
2. Authority
Authority for issuance of this QASP is provided under FAR part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provides for inspection, acceptance and documentation of the service called for in the contract or order. This acceptance is to be executed by the contracting officer or a duly authorized representative, such as the Contracting Officer’s Representative (COR).
3. Roles and Responsibilities
The following personnel shall oversee and coordinate surveillance activities.
Program/Project Manager (PM) – The PM provides primary program oversight, nominates the COR, ensures the COR is trained before performing any COR duties and supports the COR’s performance assessment activities. While the PM may serve as a direct conduit to provide Government guidance and feedback to the Contractor on technical matters, they are not empowered to make any contractual commitments or any contract changes on the government’s behalf.
Assigned PM:
Organization or Agency: Bureau of Alcohol, Tobacco, Firearms, and Explosives Telephone:
Email:
Contracting Officer (KO) – The KO shall ensure performance of all necessary actions for effective contracting, ensure compliance with the contract terms, and shall safeguard the interests of the United States in the contractual relationship. The KO shall also ensure that the contractor receives impartial, fair, and equitable treatment under this contract. Determine the final assessment of the contractor’s performance.
Assigned CO:
Organization or Agency: Bureau of Alcohol, Tobacco, Firearms, and Explosives Telephone:
Email:
Contracting Officer’s Representative (COR) The COR is responsible for providing continuous technical oversight of the contractor’s performance. The COR uses the QASP to conduct the oversight/surveillance process. The COR shall keep a Quality Assurance file that accurately documents the contractor’s actual performance. The purpose is to ensure that the contractor meets the performance standards contained in the contract. The COR is responsible for reporting early identification of performance problems to the KO. The COR is required to provide an annual performance assessment to the KO which will be used in documenting past performance.
The QASP is the primary tool for documenting contractor performance. The COR is not empowered to make any contractual commitments or to authorize any contractual change on the Government’s behalf.
Assigned COR:
Organization or Agency: Bureau of Alcohol, Tobacco, Firearms, and Explosives Telephone:
Email:
Other Key Government Personnel - Title:
Organization or Agency: Bureau of Alcohol, Tobacco, Firearms, and Explosives
Telephone:
Email:
Contractor Representatives
The following employees of the contractor serve as the contractor’s Program Manager and Task Manager for this contract. (Complete this section after the contract award)
Program Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Task Manager - <upon award, enter name> Telephone: <enter number> Email: <enter address>
Other Key Contract Personnel - <upon award, enter name or delete these lines if not applicable> Title: <enter title> Telephone: <enter number> Email: <enter address>
4. Performance Requirements and Method of Surveillance
4.1. Contract Surveillance
The goal of the QASP is to ensure that contractor performance is effectively monitored and documented. The COR’s contribution is their professional, non-adversarial relationships with the KO, PM and the contractor, which enables positive, open and timely communications. The foundation of this relationship is built upon objective, fair, and consistent COR evaluations of contractor performance against contract requirements. The COR uses the methods contained in this QASP to ensure the contractor is in compliance with contract requirements. The COR function is responsible for a wide range of surveillance requirements that effectively measure and evaluate the contractor’s performance. Additionally, this QASP is based on the premise that the contractor, not the government, is responsible for management and QC/QA actions to successfully meet the terms of the contract.
4.2. Surveillance Matrix
The Surveillance Matrix (Attachment 1) is the list of performance objectives and standards that must be performed by the contractor. This matrix details the method of surveillance the COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance objectives define the desired outcomes. Performance Standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines how, when, and what will be assessed in measuring performance. The Government performs surveillance, using this QASP, to determine the quality of the contractor’s performance as it relates to the performance element standards. The Performance Requirement Summary (PRS) should be used to form the foundation of the COR’s inspection checklist.
4.3. Performance Rating Definitions
The performance ratings below reflect definitions at FAR 42.1503 Table 42-1. The COR will use the following performance ratings to evaluate the quality of contractor’s performance:
Performance Rating
Criteria
Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.
Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.
Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.
Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.
Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
Appendix 1 - Surveillance Matrix
PWS Paragraph Performance Objective
Standards / Acceptable
Quality Limits
Inspection Calculation / Ratings What How/
Method When/ Freq
4.1 Exercise Design and Development Rollup assessment of Performance Elements, to develop an overall rating for this objective.
<< If there is weighting, or other risk issues that influence the overall assessment, document them here. >>
4.1 b Develop exercise scenarios for all training locations.
100 % Compliance with the intent of the Department of Homeland Security’s Homeland Security Exercise Evaluation Program (HSEEP)
The Government Technical Representativ e and COR will make sure exercises are designed in accordance with HSEEP.
Through observation and document review
During each exercise
4.1 i Secure lodging for all exercise participants
100% of lodging is secured for participants
The Government Technical Representativ e and COR will verify lodging is secured
Through observation and document review
4.1 j Ensure all supplies and equipment are delivered to
97% supplies and equipment
The Government Technical
Through observation and
PWS Paragraph Performance Objective
Standards / Acceptable
Quality Limits
Inspection Calculation / Ratings What How/
Method When/ Freq exercise site timely.
delivered timely to exercise site.
Representativ e and COR will verify equipment is delivered document review
4.1 k Ensure all supplies and equipment are managed in the warehouse.
98% of supplies and equipment are maintained through ATF inventory control.
The Government Technical Representativ e and COR will verify equipment is managed in warehouse during inventory.
Through
ATF
inventory.
Annually
4.1 r Development and maintenance of external web site to promote Raven’s Challenge exercises
Website must be operational 98% of the time. Any down time shall be scheduled during off hours.
The Government Technical Representativ e and COR will monitor website activity.
Through observation and document review
4.2 Exercise Execution
4.2 Support the
conduct of Raven’s Challenge as specified and
100% The Government Technical Representativ
Through observation and
At the end of each
Objective
Standards / Acceptable
Quality Limits
Inspection Calculation / Ratings What How/
Method When/ Freq codified in exercise design and development documents and plans.
e and COR will monitor support.
document review
4.3 Exercise Documentation
4.3 Facilitate the
documentation process to ensure effective assessment of performance against exercise objectives and assist in identification and documentation of strengths and areas for improvement relative to core capabilities
100% The Government Technical Representativ e and COR will monitor exercise documentatio n.
Through observation and document review
At the end
4.4 Improvement Planning
4.4 Facilitate
development of an Improvement Plan that shall track to completion all corrective actions identified during conduct of
Maintain 92% Satisfaction on participant reviews
Continual monitoring
Through observation and document review
At the end
Inspection Metrologies:
M1: Inspection of Reports. All reports shall be reviewed upon receipt. The reviewer will report any flaws in the document and categorize the flaws (Editorial, Format, and/or Substance).
Objective
Standards / Acceptable
Quality Limits
Inspection Calculation / Ratings What How/
Method When/ Freq
Raven’s Challenge, ensuring that the exercise yields tangible preparedness improvements
4.5 After-Action Review and Report (AAR)
4.5.3 Publish final AAR
in HSEEP format within 75 days of exercise completion
100% The Government Technical Representativ e and COR will review documents submitted
Through observation and document review
At the end
5.1 Customer Complaint Record
CUSTOMER COMPLAINT RECORD
DATE/TIME OF COMPLAINT
SOURCE OF COMPLAINT
ORGANIZATION
BUILDING NUMBER
INDIVIDUAL
PHONE NUMBER
NATURE OF COMPLAINT
CONTRACT REFERENCE
VALIDATION
DATE/TIME CONTRACTOR INFORMED OF COMPLAINT
ACTION TAKEN BY CONTRACTOR
RECEIVED/VALIDATED BY
5.2 Corrective Action Report
CORRECTIVE ACTION REPORT (CAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACTOR
2. CONTRACT NUMBER
3. TYPE OF SERVICES
4. FUNCTIONAL AREA
5. SUSPENSE DATE
6. CONTROL NUMBER
7. DEFICIENCY MAJOR MINOR
FINDING:
FINDING IMPACT:
Please respond with a written corrective action plan that details the corrective action of the cited deficiency, the cause of the deficiency, and actions taken to prevent recurrence by Suspense Date in Block 5. If date was not entered in Block 5, the contractor is not required to provide a response.
8. QUALITY ASSURANCE PERSONNEL (COR)
TYPED NAME AND GRADE
SIGNATURE AND DATE
9. ISSUING AUTHORITY
TYPED NAME AND GRADE
SIGNATURE AND DATE
10. COR RESPONSE TO CONTRACTOR CORRECTIVE ACTION AND ACTION TAKEN TO PREVENT RECURRENCE
11. COR DETERMINATION
ACCEPTED REJECTED
12. CLOSE DATE
PERFORMANCE ASSESSMENT REPORT (PAR)
(If more space is needed, use reverse and identify by number)
1. CONTRACT/TASK ORDER NUMBER 2. CONTRACTOR 3. TYPE OF SERVICES
4. QUALITY ASSURANCE PERSONNEL (COR) SIGNATURE AND DATE
5. COR PHONE 6. SUSPENSE DATE
I. PERFORMANCE
7. DEFICIENCY (CHECK ALL BOXES THAT APPLY)
NEW
REPEAT
NO DEFICIENCY NOTED
8. SERVICES SUMMARY or PWS PARAGRAPH ITEM REVIEWED
9. BRIEF DESCRIPTION OF DEFICIENCY (IF DEFICIENCY BOX WAS
CHECKED)
10. DETAILED PERFORMANCE ASSESSMENT
II. CONTRACTOR VALIDATION
11. CONTRACTOR REPRESENTATIVE CONCUR NON-CONCUR
12. CORRECTIVE ACTION ESTIMATED COMPLETION DATE
13. CONTRACTOR REPRESENTATIVE CORRECTIVE ACTION AND PREVENTION OF RECURRENCE OR REASON FOR NON-CONCURRENCE OF
COR CITED DEFICIENCY
III. ACTION CORRECTED
14. CONCUR NON-CONCUR COR SIGNATURE AND DATE
15. COR REMARKS (REQUIRED)
6. CONTRACTOR REPRESENTATIVE REMARKS
| 1. Purpose |
| 2. Authority |
| 3. Roles and Responsibilities |
| 4. Performance Requirements and Method of Surveillance |
| 4.1. Contract Surveillance |
| 4.2. Surveillance Matrix |
| 4.3. Performance Rating Definitions |
| Appendix 1 - Surveillance Matrix |
| 8. QUALITY ASSURANCE PERSONNEL (COR) |
| SIGNATURE AND DATE |
| TYPED NAME AND GRADE |
| 9. ISSUING AUTHORITY |
| SIGNATURE AND DATE |
| TYPED NAME AND GRADE |
| I. PERFORMANCE |
| II. CONTRACTOR VALIDATION |
| III. ACTION CORRECTED |