ATTACHMENT_B_DCWS_Hwy_178_Water_Line_Ext_05-12-2025_Plans.pdf

PDF 7 MB Posted

Attached to
Highway 178 Water Line Extension State and local contract opportunity
Solicitation number
2025-41
Issued by
Dorchester County, South Carolina

View the file

Other files for this state and local contract opportunity

Other files attached to Highway 178 Water Line Extension, newest first.
File Type Posted
Highway_178_Water_Line_Extension_(Addendum_#3_Revision).pdf PDF
ATTACHMENT_A_DCWS_Hwy_178_Water_Line_Extension.Specifications.pdf PDF
ATTACHMENT_C_Sample_Contract.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HIGHWAY 178 WATER LINE

EXTENSION

LOCATED NEAR HARLEYVILLE

DORCHESTER COUNTY, SOUTH CAROLINA

R

Know what's below.

before you dig.Call

DORCHESTER COUNTY

WATER AND SEWER DEPARTMENT

FO

R

A G

EN

C

Y R

EV

IE

W

SITE

HIGHWAY 178

US

H

IG

HW

AY

Misty Glen Road

I -

I-95 EXIT 82

HIGHWAY 178 CHARLESTON HWY (75' R/W)

M O

NA

RC

H

RD

DO

C

LN

Q

UAIL RUN RD

CA

RN

S D

AI

RY

R

D

BU

SH

Y

LN

DCWS WATER

TOWER

I-95 WILCO

GAMECOCK DR

CONNERS DR

SP

AR

RO

W

R D

KI

ZE

R

FA

RM

R

D

\\Itsfs1-2k12\pwdshr\Water and Sewer\Water and Sewer Projects\Hwy 178 Water Line Extension\Drawings\Survey\hwy 178 water line extension BASE.dwg4/25/2025 1:18 PM

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

VM

AutoCAD SHX Text

STA 94+27 1-12" 45° BEND

AutoCAD SHX Text

STA 94+61 1-12" 45° BEND

AutoCAD SHX Text

STA 96+79 1-12" 45° BEND

AutoCAD SHX Text

STA 96+95 1-12" 45° BEND

AutoCAD SHX Text

STA 93+10 BEGIN RJ PIPE

AutoCAD SHX Text

STA 94+81 END RJ PIPE

AutoCAD SHX Text

STA 96+59 BEGIN RJ PIPE

AutoCAD SHX Text

STA 97+27 END RJ PIPE

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

VM

AutoCAD SHX Text

VM

AutoCAD SHX Text

VM

AutoCAD SHX Text

VM

AutoCAD SHX Text

64 LF OF 20" STEEL CASING (MIN. THICKNESS 0.375") BY JACK & BORE

AutoCAD SHX Text

STA 93+30 1-12" 45° BEND

AutoCAD SHX Text

STA 93+50 1-12" 45° BEND (ROTATED 45° DOWN)

AutoCAD SHX Text

WV

AutoCAD SHX Text

ENTRY PIT

AutoCAD SHX Text

EXIT PIT

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text

STA 93+47 1-12" 45° BEND (ROTATED 45° DOWN)

AutoCAD SHX Text STA 93+41 1-12"x6" TEE 7 LF OF 6" RJ DIP 1-6" GATE VALVE WITH VALVE BOX 1-FIRE HYDRANT

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text CONTACTS: CARL RAGOS, P.E., MBA WATER AND SEWER PRINCIPAL ENGINEER (843) 832-0075 832-0075 OTIS WARD OPERATIONS AND MAINTENANCE MANAGER (843) 259-1373 STEVEN RICKER NEW CONSTRUCTION PROJECT MANAGER (843) 714-5721 LARRY HARPER DIRECTOR OF WATER AND SEWER (843) 832-0075

AutoCAD SHX Text

235 DEMING WAY SUMMERVILLE, SC 29483 PHONE: (843) 832-0075 FAX: (843) 832-0073

AutoCAD SHX Text

%%UVICINITY MAP

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

%%ULOCATION MAP

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

AUGUST 14, 2024

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text No. 29604

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text

AUGUST 14, 2024

AutoCAD SHX Text ENGINEER'S CERTIFICATION STATEMENT: : I HAVE PLACED MY SIGNATURE AND SEAL ON THE DESIGN DOCUMENTS SUBMITTED SIGNIFYING THAT I ACCEPT RESPONSIBILITY FOR THE DESIGN OF THE SYSTEM. FURTHER, I CERTIFY TO THE BEST OF MY KNOWLEDGE AND BELIEF THAT THE DESIGN IS CONSISTENT WITH THE REQUIREMENTS OF TITLE 48, CHAPTER 14 OF THE CODE OF LAWS OF SC, 1976 AS AMENDED, PURSUANT TO REGULATION 72-300 ET SEQ. (IF APPLICABLE), AND IN ACCORDANCE WITH THE TERMS AND CONDITIONS OF SCR100000. ANTONIO CARLOS RAGOS, P.E. #29604 DATEDATE

H

IG

H W

A Y

W A

T E

R

LI

N E

E X

T E

N S

IO

N

D O

R C

H E

S T

E R

C O

U N

T Y

W A

T E

R A

N D

S E

W E

R D

E P

A R

T M

E N

T

G-01

G E

N E

R A

L N

O T

E S

A N

D D

R A

W

IN

G I

N D

E X

DRAWING INDEX

DRAWING NUMBERDRAWING TITLE

GENERAL

- COVER SHEET

G01 GENERAL NOTES AND DRAWING INDEX

G02 EROSION AND CONTROL NOTES AND DETAILS

G03 EROSION AND CONTROL NOTES AND DETAILS

C01 PLAN AND PROFILE - STA 0+00 T0 STA 1+00

C02 PLAN AND PROFILE - STA 1+00 T0 STA 6+00

C03 PLAN AND PROFILE - STA 6+00 T0 STA 9+50

C04 PLAN AND PROFILE - STA 9+50 T0 STA 14+00

C05 PLAN AND PROFILE - STA 14+00 T0 STA 19+00

C06 PLAN AND PROFILE - STA 19+00 T0 STA 24+50

C07 PLAN AND PROFILE - STA 24+50 T0 STA 27+50

C08 PLAN AND PROFILE - STA 27+50 T0 STA 32+00

C09 PLAN AND PROFILE - STA 32+00 T0 STA 37+00

C10 PLAN AND PROFILE - STA 37+00 T0 STA 42+00

C11 PLAN AND PROFILE - STA 42+00 T0 STA 47+00

C12 PLAN AND PROFILE - STA 47+00 T0 STA 52+00

C13 PLAN AND PROFILE - STA 52+00 T0 STA 57+00

C14 PLAN AND PROFILE - STA 57+00 T0 STA 62+00

C15 PLAN AND PROFILE - STA 62+00 T0 STA 67+00

C16 PLAN AND PROFILE - STA 67+00 T0 STA 72+00

C17 PLAN AND PROFILE - STA 72+00 T0 STA 77+00

C18 PLAN AND PROFILE - STA 77+00 T0 STA 82+00

C19 PLAN AND PROFILE - STA 82+00 T0 STA 87+00

C20 PLAN AND PROFILE - STA 87+00 T0 STA 92+00

C21 PLAN AND PROFILE - STA 92+00 T0 STA 97+00

C22 PLAN AND PROFILE - STA 97+00 T0 STA 102+00

C23 PLAN AND PROFILE - STA 102+00 T0 STA 107+00

C24 PLAN AND PROFILE - STA 107+00 T0 STA 112+00

C25 PLAN AND PROFILE - STA 112+00 T0 STA 117+00

C26 PLAN AND PROFILE - STA 117+00 T0 STA 122+00

C27 PLAN AND PROFILE - STA 122+00 T0 STA 127+00

C28 PLAN AND PROFILE - STA 127+00 T0 STA 132+00

C29 PLAN AND PROFILE - STA 132+00 T0 STA 137+00

C30 PLAN AND PROFILE - STA 137+00 T0 STA 142+00

C31 PLAN AND PROFILE - STA 142+00 T0 STA 147+00

C32 PLAN AND PROFILE - STA 147+00 T0 STA 152+00

C33 PLAN AND PROFILE - STA 152+00 T0 STA 156+59

D01 STANDARD DETAILS

D02 STANDARD DETAILS

D03 STANDARD DETAILS

- RIGHT-OF-WAY

- SEWER MANHOLE

- CONTOUR LINE

- FENCE

- OVERHEAD POWER

- SEWER LINE

- WATER LINE

- SEWER VALVE

- GAS LINE

- FIBER OPTIC

- TELEPHONE LINE

- EDGE OF WOODS

- POWER POLE

- GUY WIRE

- TELEPHONE PEDESTAL

- MAILBOX

- STORM DRAIN MANHOLE

GENERAL NOTES:

1. ALL WORK SHALL BE DONE IN ACCORDANCE WITH THE TECHNICAL

SPECIFICATIONS AND ALL APPLICABLE PERMITS.

2. HORIZONTAL DATUM IS NAD 83, STATE PLANE COORDINATES. ALL

VERTICAL DATUM (ELEVATIONS) ARE NAVD88.

3. LOCATION SHOWN FOR UNDERGROUND UTILITIES AND STRUCTURES

ARE BASED ON FIELD SURVEYS, DORCHESTER COUNTY GIS, AND RECORD

DRAWINGS. THESE LOCATIONS SHALL BE FIELD VERIFIED BY THE

CONTRACTOR BOTH HORIZONTALLY AND VERTICALLY. CALL “PALMETTO

UTILITY PROTECTION SERVICE” (PUPS) (811 OR 888-721-7877) AT LEAST

72 HOURS PRIOR TO DIGGING FOR LOCATION ASSISTANCE.

CONTRACTOR IS RESPONSIBLE FOR CONTACTING ALL UTILITIES,

WHETHER THEY ARE A MEMBER OF PUPS OR NOT, PRIOR TO DIGGING.

4. CONTRACTOR TO LOCATE UTILITIES IN ADVANCE OF WORK TO

DETERMINE THE MATERIAL, EXACT SIZE, DEPTH, AND LOCATION.

5. LOCATE, EXCAVATE, AND EXPOSE ALL EXISTING UTILITY LINES. IF

ADDITIONAL PIPE IS REQUIRED TO WORK AROUND THE EXISTING

UTILITIES, THE CONTRACTOR WILL BE PAID ON THE UNIT PRICE BID FOR

THE ADDITIONAL WORK FOR THIS ITEM.

6. ALL AREAS DISTURBED BEYOND INDICATED LIMITS OF DISTURBANCE

SHALL BE RESTORED TO PRE-EXISTING CONDITIONS REGARDLESS OF

AREA AFFECTED AT NO ADDITIONAL COST TO DCWS.

7. WHEN FIELD CUTTING OF PIPE IS NECESSARY, THE CONTRACTOR SHALL

CUT PIPE WITH A PIPE SAW IN ACCORDANCE WITH APPLICABLE AWWA

AND ASTM REQUIREMENTS. FIELD WELDING OR TORCH-CUTTING ARE

PROHIBITED.

8. MAINTAIN ACCESS TO ALL RESIDENTS DURING CONSTRUCTION.

SEQUENCE OF CONSTRUCTION OPERATIONS:

1. NO WORK TO BE PERFORMED PRIOR TO RECEIPT OF NPDES COVERAGE FROM SOUTH

CAROLINA DEPARTMENT OF HEALTH AND ENVIRONMENTAL CONTROL (SCDHEC).

2. CONTRACTOR TO SCHEDULE A PRE-CONSTRUCTION MEETING PRIOR TO ANY

COMMENCEMENT OF WORK.

3. CONTRACTOR SHALL CONTACT THE SCDHEC REGIONAL EA OFFICE LISTED BELOW

PRIOR TO STARTING ANY LAND-DISTURBING ACTIVITIES. THE CONTRACTOR SHALL

ABIDE BY ALL REQUIREMENTS OF THE SOUTH CAROLINA NPDES GENERAL PERMIT FOR

STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES SCR100000.

LOWCOUNTRY EA CHARLESTON

1362 McMILLAN AVENUE, SUITE 300

CHARLESTON, SC 29405

(843) 953-0150

4. INSTALL EROSION AND SEDIMENTATION CONTROL MEASURES AS SHOWN ON THE

CONTRACT DRAWINGS. NO CONSTRUCTION OR LAND DISTURBANCE ACTIVITIES MAY

BEGIN UNTIL ALL EROSION AND SEDIMENTATION CONTROL MEASURES HAVE BEEN

INSTALLED AROUND CONSTRUCTION AREAS. IF CLEARING IS REQUIRED FOR

INSTALLATION OF A GIVEN MEASURE, ALL OTHER MEASURES SHOWN SHALL BE

INSTALLED FIRST. A DOUBLE ROW OF SILT FENCE IS TO BE INSTALLED IN ALL AREAS

BETWEEN THE DISTURBED AREA AND ALL WATERS OF THE STATE (WoS). A 10-FOOT

BUFFER SHALL BE MAINTAINED WHERE POSSIBLE BETWEEN THE SILT FENCE AND THE

WoS.

5. ONCE ALL MEASURES HAVE BEEN INSTALLED, THE SITE SHALL BE CLEARED AND

GRUBBED AS SHOWN ON THE CONTRACT DRAWINGS. CONTRACTOR

LAYDOWN/STOCKPILE/CONCRETE WASHOUT AREAS SHALL BE LOCATED AS SHOWN

ON THE CONTRACT DRAWINGS.

6. ALL PIPE WORK SHALL BE INSTALLED IN ACCORDANCE WITH STANDARD

CONSTRUCTION TECHNIQUES.ONLY THE LENGTH OF TRENCH IN WHICH PIPE CAN BE

INSTALLED IN ONE DAY'S TIME SHALL BE OPEN AT ANY TIME, WITH SPOIL MATERIAL

PLACED ON THE UPHILL SIDE OF THE TRENCH. PIPING SHALL BE CAPPED AT END OF

EACH WORK DAY TO PREVENT SEDIMENT FROM ENTERING. TRENCHES SHALL BE

BACKFILLED AT END OF EACH WORK DAY AND DISTURBED AREA SEEDED WITH

TEMPORARY SEEDING MEASURES AS NECESSARY.

7. EARTHWORK EXCAVATION AND FILL OPERATIONS SHALL BE PERFORMED IN

ACCORDANCE WITH STANDARD CONSTRUCTION TECHNIQUES. ALL EXCAVATION

DEWATERING FLOWS SHALL PASS THROUGH A SEDIMENT FILTERING DEVICE PRIOR

TO DISCHARGE. TOPSOIL SHALL BE STRIPPED AND STOCKPILED ON SITE. TOPSOIL

STOCKPILE SHALL HAVE PERIMETER EROSION CONTROL MEASURES INSTALLED AND

SEEDED WITH TEMPORARY SEEDING MEASURES DURING CONSTRUCTION ACTIVITIES.

8. STORM DRAINAGE DITCHES SHALL BE PROTECTED WITH APPROPRIATE EROSION

CONTROL MEASURES AT ALL TIMES. POSITIVE STORMWATER DRAINAGE AWAY FROM

CONSTRUCTION ACTIVITIES SHALL BE MAINTAINED AT ALL TIMES DURING

CONSTRUCTION.

9. TEMPORARY SEEDING MEASURES SHALL BE EMPLOYED AS SOON AS PRACTICABLE IN

PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY OR

PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS AFTER

WORK HAS CEASED, EXCEPT WHERE STABILIZATION MEASURES WOULD BE

PRECLUDED BY SNOW OR FROZEN GROUND CONDITIONS, OR WHERE CONSTRUCTION

ACTIVITY WILL BE RESUMED WITHIN 14 DAYS.

10. ONCE ALL EARTHWORK AND CONSTRUCTION ACTIVITIES ARE COMPLETE, FINAL

GRADING MAY BEGIN.

11. UPON COMPLETION OF FINAL GRADING, PERMANENT SEEDING, MULCHING, AND

FERTILIZING MEASURES SHALL BE EMPLOYED ON ALL DISTURBED AREAS AS SPECIFIED

IN THE CONTRACT DOCUMENTS. ALL EROSION CONTROL MEASURES SHALL REMAIN

IN PLACE UNTIL ENTIRE SITE HAS BEEN STABILIZED.

12. ONCE PERMANENT STABILIZATION HAS OCCURRED AND APPROVED BY LOCAL

AUTHORITIES, CONTRACTOR SHALL FILE A NOTICE OF TERMINATION (NOT) AS PER

THE REQUIREMENTS OF THE SOUTH CAROLINA NPDES GENERAL PERMIT FOR

STORMWATER DISCHARGES FROM CONSTRUCTION ACTIVITIES SCR100000. ANY

AREAS DISTURBED BY THE REMOVAL OF THESE MEASURES SHALL BE RETURNED AS

CLOSELY AS POSSIBLE TO ORIGINAL CONDITION AND SEEDED, MULCHED, AND

FERTILIZED AS SPECIFIED IN THE CONTRACT DOCUMENTS.

SEDIMENT AND EROSION CONTROL:

1. IF NECESSARY, SLOPES, WHICH EXCEED WIGHT (8) VERTICAL FEET SHOULD BE

STABILIZED WITH SYNTHETIC OR VEGETATIVE MATS, IN ADDITION TO

HYDROSEEDING IT MAY BE NECESSARY TO INSTALL TEMPORARY SLOPE DRAINS

DURING CONSTRUCTION. TEMPORARY BERMS MAY BE NEEDED UNTIL THE

SLOPE IS BROUGHT TO GRADE.

2. STABILIZATION MEASURES SHALL BE INITIATED AS SOON AS PRACTICABLE IN

PORTIONS OF THE SITE WHERE CONSTRUCTION ACTIVITIES HAVE TEMPORARILY

OR PERMANENTLY CEASED, BUT IN NO CASE MORE THAN FOURTEEN (14) DAYS

AFTER WORK HAS CEASED, EXCEPT AS STATED BELOW:

WHERE STABILZIATION BY THE 14TH DAY IS PRECLUDED BY SNOW

COVER OR FORZEN GROUND CONDITIONS STABILIZATION MEASURES

MUST BE INITIATED AS SOON AS PRACTICABLE.

WHERE CONSTRUCTION ACTIVITY ON A PORTION OF THE SITE IS

TEMPORARILY CEASED, AND EARTH-DISTURBING ACTIVITIES WILL BE

RESUMED WITHIN 14 DAYS, TEMPORARILY STABILIZATION MEASURES

DO NOT HAVE TO BE INITIATED ON THAT PORTION OF THE SITE.

3. ALL SEDIMENT AND EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE

EVERY CALENDAR WEEK. IF PERIODIC INSPECTION OR OTHER INFORMATION

INDICATES THAT A BMP HAS BEEN INAPPROPRIATELY OR INCORRECTLY

INSTALLED, THE PERMITTEE MUST ADDRESS THE NECESSARY REPLACEMENT OR

MODIFICATION REQUIRED TO CORRECT THE BMP WITHIN 48 HOURS OF

IDENTIFICATION.

4. PROVIDE SILT FENCE AND/OR OTHER CONTROL DEVICES, AS MAY BE REQUIRED,

TO CONTROL SOIL EROSION DURING UTILITY CONSTRUCTION. ALL DISTURBED

AREAS SHALL BE CLEANED, GRADED, AND STABILIZED WITH GRASSING

IMMEDIATELY AFTER THE UTILITY INSTALLATION. FILL, COVER, AND TEMPORARY

SEEDING AT THE END OF EACH DAY ARE RECOMMENDED. IF WATER IS

ENCOUNTERED WHILE TRENCHING, THE WATER SHOULD BE FILTERED TO

REMOVE SEDIMENT BEFORE BEING PUMPED BACK INTO ANY WATERS OF THE

STATE (WoS).

5. ALL EROSION CONTROL DEVICES SHALL BE PROPERLY MAINTAINED DURING ALL

PHASES OF CONSTRUCTION UNTIL THE COMPLETION OF ALL CONSTRUCTION

ACTIVITIES AND ALL DISTURBED AREAS HAVE BEEN STABILIZED. ADDITIONAL

CONTROL DEVICES MAY BE REQUIRED DURING CONSTRUCTION IN ORDER TO

CONTROL EROSION AND/OR OFFSITE SEDIMENTATION. ALL TEMPORARY

CONTROL DEVICES SHALL BE REMOVED ONCE CONSTRUCTION IS COMPLETE

AND THE SITE IS STABILIZED.

6. THE CONTRACTOR MUST TAKE NECESSARY ACTION TO MINIMIZE THE TRACKING

OF MUD ONTO PAVED ROADWAY(S) FROM CONSTRUCTION AREAS AND THE

GENERATION OF DUST. THE CONTRACTOR SHALL DAILY REMOVE MUD/SOIL

FROM PAVEMENT, AS MAY BE REQUIRED.

7. RESIDENTIAL SUBDIVISION REQUIRE EROSION CONTROL FEATURES FOR

INFRASTRUCTURE AS WELL AS FOR INDIVIDUAL LOT CONSTRUCTION.

INDIVIDUAL PROPERTY OWNERS SHALL FOLLOW THESE PLANS DURING

CONSTRUCTION OR OBTAIN APPROVAL OF AN INDIVIDUAL PLAN IN

ACCORDANCE WITH S.C. REG. 72-300 ET SEQ. AND SCR100000.

8. TEMPORARY DIVERSION BERMS AND/OR DITCHES WILL BE PROVIDED AS

NEEDED DURING CONSTRUCTION TO PROTECT WORK AREAS FROM UPSLOPE

RUNOFF AND/OR TO DIVERT SEDIMENT-LADEN WATER TO APPROPRIATE TRAPS

OR STABLE OUTLETS.

9. ALL WATERS OF THE STATE (WoS), INCLUDING WETLANDS, ARE TO BE FLAGGED

OR OTHERWISE CLEARLY MARKED IN THE FIELD. A DOUBLE ROW OF SILT FENCE

IS TO BE INSTALLED IN ALL AREAS WHERE A 50-FOOT BUFFER CAN'T BE

MAINTAINED BETWEEN THE DISTURBED AREA AND ALL WoS. A 10-FOOT BUFFER SHOULD BE MAINTAINED BETWEEN THE LAST ROW OF SILT FENCE AND ALL WoS.

10. LITTER, CONSTRUCTION DEBRIS, OILS, FUELS, AND BUILDING PRODUCTS WITH

SIGNIFICANT POTENTIAL FOR IMPACT (SUCH AS STOCKPILES OF FRESHLY

TREATED LUMBER) AND CONSTRUCTION CHEMICALS THAT COULD BE EXPOSED

TO STORMWATER MUST BE PREVENTED FROM BECOMING A POLLUTANT

SOURCE IN STORMWATER DISCHARGES.

11. A COPY OF THE SWPPP, INSPECTION RECORDS, AND RAINFALL DATA MUST BE

RETAINED AT THE CONSTRUCTION SITE OR A NEARBY LOCATION EASILY

ACCESSIBLE DURING NORMAL BUSINESS HOURS, FROM THE DATE OF

COMMENCEMENT OF CONSTRUCTION ACTIVITIES TO THE DATE THAT FINAL

STABILIZATION IS REACHED.

12. INITIATE STABILIZATION MEASURES ON ANY EXPOSED STEEP SLOPE (3H:1V OR

GREATER) WHERE LAND-DISTURBING ACTIVITIES HAVE PERMANENTLY OR

TEMPORARILY CEASED, AND WILL NOT RESUME FOR A PERIOD OF 7 CALENDAR

DAYS.

13. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM EQUIPMENT AND VEHICLE

WASHING, WHEEL WASH WATER, AND OTHER WASH WATERS. WASH WATERS

MUST BE TREATED IN A SEDIMENT BASIN OR ALTERNATIVE CONTROL THAT

PROVIDES EQUIVALENT OR BETTER TREATMENT PRIOR TO DISCHARGE.

14. MINIMIZE THE DISCHARGE OF POLLUTANTS FROM DEWATERING OF TRENCHES

AND EXCAVATED AREAS. THESE DISCHARGES ARE TO BE ROUTED THROUGH

APPROPRIATE BMPs (SEDIMENT BASIN, FILTER BAG, ETC.).

15. THE FOLLOWING DISCHARGES FROM SITES ARE PROHIBITED:

WASTEWATER FROM WASHOUT OF CONCRETE, UNLESS MANAGED

BY AN APPROPRIATE CONTROL;

WASTEWATER FROM WASHOUT AND CLEANOUT OF STUCCO, PAINT,

FORM RELEASE OILS, CURING COMPOUNDS AND OTHER

CONSTRUCTION MATERIALS;

FUELS OILS, OR OTHER POLLUTANTS USED IN VEHICLE AND

EQUIPMENT OPERATION AND MAINTENANCE; AND

SOAPS OR SOLVENTS USED IN VEHICLE AND EQUIPMENT WASHING.

16. AFTER CONSTRUCTION ACTIVITIES HAVE BEGUN, INSPECTIONS MUST BE

CONDUCTED AT A MINIMUM OF AT LEAST ONCE EVERY CALENDAR WEEK AND

MUST BE CONDUCTED UNTIL FINAL STABILIZATION IS REACHED ON ALL AREAS

OF THE CONSTRUCTION SITE.

17. IF EXISTING BMPs NEED TO BE MODIFIED OR IF ADDITIONAL BMPs ARE

NECESSARY TO COMPLY WITH THE REQUIREMENTS OF THIS PERMIT AND/OR

SC'S WATER QUALITY STANDARDS, IMPLEMENTATION MUST BE COMPLETED

BEFORE THE NEXT STORM EVENT WHENEVER PRACTICABLE. IF

IMPLEMENTATION BEFORE THE NEXT STORM EVENT IS IMPRACTICABLE, THE

SITUATION MUST BE DOCUMENTED IN THE SWPPP AND ALTERNATIVE BMPs

18. MUST BE IMPLEMENTED AS SOON AS REASONABLY POSSIBLE.

19. A PRE-CONSTRUCTION CONFERENCE MUST BE HELD FOR EACH CONSTRUCTION

SITE WITH AN APPROVED ON-SITE SWPPP INSPECTION PRIOR TO THE

IMPLEMENTATION OF CONSTRUCTION ACTIVITIES. FOR NON-LINEAR PROJECTS

THAT DISTURB 10 ACRES OR MORE, THIS CONFERENCE MUST BE HELD ON-SITE

UNLESS THE DEPARTMENT HAS APPROVED OTHERWISE.

SCDOT NOTES:

1. FLOWABLE FILL SHALL BE USED AS BACK FILL MATERIAL FOR ALL

ROADWY CROSSINGS AND FOR EXCAVATION WITHIN 5 FEET FROM EDGE

OF PAVEMENT FOR HIGH VOLUME ROADWAYS AND/OR WITHIN 3 FEET

OF EDGE OF PAVEMENT FOR LOW VOLUME ROADWAYS.

2. ALL UTILITY LINES CROSSING UNDER STATE ROADWAYS MUST BE A

MINIMUM DEPTH OF 48".

3. ALL WATER METERS, AIR VALVES, ELECTRICAL TRANSFORMERS, CATV

CONNECTION BOXES, TELEPHONE PEDESTALS, AND/OR OTHER

UTILITY/SPLICE BOXES SHALL BE PLACED AT THE RIGHT OF WAY LINE.

4. THE DEPTH OF THE UTILITY LINE MUST MEET THE MINIMUM

REQUIREMENTS PER THE UAM: 42" BELOW THE LOWEST POINT OF THE

ROADWAY CROSS SECTION. THE ROADWAY CROSS SECTION INCLUDES

ANY DRAINAGE STRUCTURE AND/OR DITCHES OR SWALES.

5. DRIVEWAYS THAT ARE IMPACTED BY OPEN CUT INSTALLATION METHOD,

SHALL BE OVERLAID FOR THE FULL WIDTH WITHIN THE RIGHT OF WAY

LIMITS WITH LIKE MATERIAL.

6. BORE PITS MUST BE LOCATED A MINIMUM OF 5 FEET FROM THE EDGE

OF PAVEMENT.

7. ANY AND ALL VENTS INSTALLED FOR CASING PIPE MUST BE LOCATED AT

THE RIGHT OF WAY LINE.

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text No. 29604

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text S

AutoCAD SHX Text

DORCHESTER COUNTY, SOUTH CAROLINA

AutoCAD SHX Text

235 DEMING WAY SUMMERVILLE, SC 29483 PHONE: (843) 832-0075 FAX: (843) 832-0073

AutoCAD SHX Text

DATE: PROJECT ENGINEER: DESIGN BY: DRAWN BY: CHECKED BY:

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

REV

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

JULY 2022 CR CR SL JC/OW

AutoCAD SHX Text

AUGUST 14, 2024

AutoCAD SHX Text

AutoCAD SHX Text S

AutoCAD SHX Text

LEGEND:

AutoCAD SHX Text T

AutoCAD SHX Text

MB

D

H W

A Y

W A

T E

R

LI

N E

E X

T E

N S

IO

N

D O

R C

H E

S T

E R

C O

U N

T Y

W A

T E

R A

N D

S E

W E

R D

E P

A R

T M

E N

T

G-02

S E

D

IM

E N

T A

N D

E R

O S

IO

N

C O

N T

R O

L N

O T

E S

A N

D D

E T

A

IL

S

FLAT-BOTTOM TRENCH DETAIL V-SHAPED TRENCH DETAIL

SILT FENCE INSTALLATION

MAX. SEDIMENT TUBE SPACINGSLOPE

4%

SEDIMENT TUBE SPACING

3% 2%

LESS THAN 2%

50-FEET

40-FEET

30-FEET

25-FEET

5% 6%

GREATER THAN 6%

150-FEET

100-FEET

75-FEET

SEDIMENT TUBE INSTALLATION

AutoCAD SHX Text

DORCHESTER COUNTY, SOUTH CAROLINA

AutoCAD SHX Text

235 DEMING WAY SUMMERVILLE, SC 29483 PHONE: (843) 832-0075 FAX: (843) 832-0073

AutoCAD SHX Text

DATE: PROJECT ENGINEER: DESIGN BY: DRAWN BY: CHECKED BY:

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

REV

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

JULY 2022 CR CR SL JC/OW

AutoCAD SHX Text

MAXIMUM SPACING = 6 FT.

AutoCAD SHX Text

FILTER FABRIC

AutoCAD SHX Text

BACKFILL TRENCH WITH COMPACTED EARTH

AutoCAD SHX Text

COMPACTED EARTH

AutoCAD SHX Text

COMPACTED EARTH

AutoCAD SHX Text

FILTER FABRIC

AutoCAD SHX Text

8-IN.

AutoCAD SHX Text

4-IN.

AutoCAD SHX Text

18-IN. (MINIMUM)

AutoCAD SHX Text

18-IN. (MINIMUM)

AutoCAD SHX Text

8-IN.

AutoCAD SHX Text

FILTER FABRIC

AutoCAD SHX Text

RUNOFF

AutoCAD SHX Text

RUNOFF

AutoCAD SHX Text

RUNOFF

AutoCAD SHX Text

18-IN. TO 24-IN.

AutoCAD SHX Text

BURY FABRIC

AutoCAD SHX Text

USE EITHER FLAT-BOTTOM OR V-BOTTOM TRENCH SHOWN BELOW

AutoCAD SHX Text

FILTER FABRIC

AutoCAD SHX Text

FILTER FABRIC

AutoCAD SHX Text

1.25 LB./LINEAR FT. STEEL POSTS

AutoCAD SHX Text

HEAVY DUTY PLASTIC TIE FOR STEEL POSTS

AutoCAD SHX Text

18-IN. TO 24-IN.

AutoCAD SHX Text 2" x 2" wood stakes or 1.25 #/ft Steel Post

AutoCAD SHX Text 2.0' Minimum

AutoCAD SHX Text 2.0' Spacing (Typical) Continuous Along Tube

AutoCAD SHX Text 48" Minimum Length

AutoCAD SHX Text

FLOW

AutoCAD SHX Text Stakes Placed at 2' Minimum Spacing

AutoCAD SHX Text

%%USEDIMENT TUBES - GENERAL NOTES

AutoCAD SHX Text

1. Sediment tubes may be installed along contours, in drainage Sediment tubes may be installed along contours, in drainage conveyance channels, and around inlets to help prevent off-site discharge of sediment-laden stormwater runoff. 2. Sediment tubes are elongated tubes of compacted geotextiles, Sediment tubes are elongated tubes of compacted geotextiles, curled excelsior wood, natural coconut fiber, or hardwood mulch. Straw, pine needle, and leaf mulch-filled sediment tubes are not permitted. 3. The outer netting of the sediment tube should consist of The outer netting of the sediment tube should consist of seamless, high-density polyethylene photodegradable materials treated with ultraviolet stabilizers or a seamless, high-density polyethylene non-degradable material. 4. Sediment tubes, when used as checks within channels, should Sediment tubes, when used as checks within channels, should range between 18-inches and 24-inches depending on channel dimensions. Diameters outside this range may be allowed where necessary when approved. 5. Curled excelsior wood, or natural coconut products that are Curled excelsior wood, or natural coconut products that are rolled up to create a sediment tube are not allowed. 6. Sediment tubes should be staked using wooden stakes (2-inch Sediment tubes should be staked using wooden stakes (2-inch X 2-inch) or steel posts (standard "U" or "T" sections with a minimum weight of 1.25 pounds per foot) at a minimum of 48-inches in length placed on 2-foot centers. 7. Install all sediment tubes to ensure that no gaps exist Install all sediment tubes to ensure that no gaps exist between the soil and the bottom of the tube. Manufacturer's recommendations should always be consulted before installation. 8. The ends of adjacent sediment tubes should be overlapped The ends of adjacent sediment tubes should be overlapped 6-inches to prevent flow and sediment from passing through the field joint. 9. Sediment tubes should not be stacked on top of one another, Sediment tubes should not be stacked on top of one another, unless recommended by manufacturer. 10. Each sediment tube should be installed in a trench with a Each sediment tube should be installed in a trench with a depth equal to 1/5 the diameter of the sediment tube. 11. Sediment tubes should continue up the side slopes a minimum Sediment tubes should continue up the side slopes a minimum of 1-foot above the design flow depth of the channel. 12. Install stakes at a diagonal facing incoming runoff.

AutoCAD SHX Text

1. The key to functional sediment tubes is weekly inspections, The key to functional sediment tubes is weekly inspections, routine maintenance, and regular sediment removal. 2. Regular inspections of sediment tubes shall be conducted Regular inspections of sediment tubes shall be conducted once every calendar week and, as recommended, within 24-hours after each rainfall even that produces 1/2-inch or more of precipitation. 3. Attention to sediment accumulations in front of the Attention to sediment accumulations in front of the sediment tube is extremely important. Accumulated sediment should be continually monitored and removed when necessary. 4. Remove accumulated sediment when it reaches 1/3 the Remove accumulated sediment when it reaches 1/3 the height of the sediment tube. 5. Removed sediment shall be placed in stockpile storage areas or spread thinly across disturbed area. Stabilize the removed sediment after it is relocated. 6. Large debris, trash, and leaves should be removed from in Large debris, trash, and leaves should be removed from in front of tubes when found. 7. If erosion causes the edges to fall to a height equal to If erosion causes the edges to fall to a height equal to or below the height of the sediment tube, repairs should be made immediately to prevent runoff from bypassing tube. 8. Sediment tubes should be removed after the contributing Sediment tubes should be removed after the contributing drainage area has been completely stabilized. Permanent vegetation should replace areas from which sediment tubes have been removed.

AutoCAD SHX Text

%%USEDIMENT TUBES - INSPECTION & MAINTENANCE

AutoCAD SHX Text 5.

AutoCAD SHX Text

AS NECESSARY TO PREVENT REOCCURRENCE OF DAMAGE.

AutoCAD SHX Text

DAMAGE AFTER DISCOVERY AND REINSTALL ADEQUATE CONTROL MEASURES

AutoCAD SHX Text

THE CONTRACTOR SHALL IMMEDIATELY CLEANUP AND REPAIR ALL EROSION

AutoCAD SHX Text 4.

AutoCAD SHX Text 3.

AutoCAD SHX Text 2.

AutoCAD SHX Text

%%U SEDIMENT AND EROSION CONTROL PROCEDURES

AutoCAD SHX Text 1.

AutoCAD SHX Text

DURING CLEARING AND EARTHWORK ACTIVITIES THE CONTRACTOR SHALL

AutoCAD SHX Text

INSTALL ALL EROSION CONTROL DEVICES SPECIFIED AND AS INDICATED

AutoCAD SHX Text

ON THE DRAWINGS. DURING EACH PHASE OF SITE CONSTRUCTION THE

AutoCAD SHX Text

CONTRACTOR SHALL ADJUST, RELOCATE AND/OR REINSTALL AS

AutoCAD SHX Text

APPLICABLE ALL EROSION CONTROL DEVICES AND MEASURES NECESSARY

AutoCAD SHX Text

TO PREVENT SOIL EROSION AND SEDIMENT DISCHARGE FROM THE SITE.

AutoCAD SHX Text

IN ADDITION TO SPECIFIED TEMPORARY GRASSING AND STANDARD

AutoCAD SHX Text

PROTECTION AS DETAILED. ALL DRAINAGE STRUCTURES SHALL HAVE

AutoCAD SHX Text

GEOTEXTILE FABRIC PLACED OVER ALL FRAMES AND GRATES TO PREVENT

AutoCAD SHX Text

SEDIMENT ENTRY INTO NEW STRUCTURES AND CONDUITS. ALL SEDIMENT

AutoCAD SHX Text

SHALL BE CLEANED OUT OF STRUCTURES AND CONDUITS REGULARLY.

AutoCAD SHX Text

TEMPORARY GRASSING AND SILT FENCE FILTER BARRIERS SHALL BE

AutoCAD SHX Text

INSTALLED AND MAINTAINED UNTIL CONSTRUCTION IS COMPLETE AND

AutoCAD SHX Text

LANDSCAPING IS INSTALLED.

AutoCAD SHX Text

SILT FENCE SHALL BE MAINTAINED AROUND THE DOWNSTREAM PERIMETER

AutoCAD SHX Text

OF ALL ACTIVE EARTHWORK AREAS TO PREVENT SEDIMENT TRANSPORT

AutoCAD SHX Text

ONTO ADJACENT PROPERTIES.

AutoCAD SHX Text

%%UDHEC-OCRM STANDARD EROSION CONTROL NOTES

AutoCAD SHX Text

1. SWPPP, inspection records, and rainfall data must be kept onsite or within thirty (30) minutes of the site at all times from the date of SWPPP, inspection records, and rainfall data must be kept onsite or within thirty (30) minutes of the site at all times from the date of commencement of construction activities to the date that final stabilization is achieved. These items should be in a designated area that is accessible to the inspectors. SWPPP inspections must be completed by a certified inspector. 2. If necessary, slopes, which exceed eight (8) vertical feet should be stabilized with synthetic or vegetative mats, in addition to hydroseeding. If necessary, slopes, which exceed eight (8) vertical feet should be stabilized with synthetic or vegetative mats, in addition to hydroseeding. It may be necessary to install temporary slope drains during construction. Temporary berms may be needed until the slope is brought to grade. 3. Stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or Stabilization measures shall be initiated as soon as practicable in portions of the site where construction activities have temporarily or permanently ceased, but in no case more than fourteen (14) days after work has ceased, except as stated below. a. Where stabilization by the 14th day is precluded buy snow cover or frozen ground conditions, stabilization measures must be initiated as soon as practicable. b. Where construction activity on a portion of the site is temporarily ceased, and earth-disturbing activities will be resumed within 14 days, Where construction activity on a portion of the site is temporarily ceased, and earth-disturbing activities will be resumed within 14 days, temporary stabilization measures do not have to be initiated on that portion of the site. 4. All sediment and erosion control devices shall be inspected once every calendar week. If periodic inspection or other information indicates All sediment and erosion control devices shall be inspected once every calendar week. If periodic inspection or other information indicates that a BMP has been inappropriately or incorrectly installed, the Permittee must address the necessary replacement or modification required to correct the BMP within 48 hours of identification. 5. Provide silt fence and/or other control devices, as may be required, to control soil erosion during utility construction. All disturbed areas Provide silt fence and/or other control devices, as may be required, to control soil erosion during utility construction. All disturbed areas shall be cleaned, graded, and stabilized with grassing immediately after the utility installation. Fill, cover, and temporary seeding at the end of each day are recommended. If water is encountered while trenching, the water should be filtered to remove sediment before being pumped back into any waters of the State. 6. All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities All erosion control devices shall be properly maintained during all phases of construction until the completion of all construction activities and all disturbed areas have been stabilized. Additional control devices may be required during construction in order to control erosion and/or offsite sedimentation. All temporary control devices shall be removed once construction is complete and the site is stabilized. 7. The contractor must take necessary action to minimize the tracking of mud onto paved roadway(s) from construction areas and the The contractor must take necessary action to minimize the tracking of mud onto paved roadway(s) from construction areas and the generation of dust. The contractor shall daily remove mud/soil from pavement, as may be required. 8. Residential subdivisions require erosion control features for infrastructure as well as for individual lot construction. Individual property owners Residential subdivisions require erosion control features for infrastructure as well as for individual lot construction. Individual property owners shall follow these plans during construction or obtain approval of an individual plan in accordance with S.C Reg. 72-300 et seq. and SCR100000. 9. Temporary diversion berms and/or ditches will be provided as needed during construction to protect work areas from upslope runoff Temporary diversion berms and/or ditches will be provided as needed during construction to protect work areas from upslope runoff and/or to divert sediment-laden water to appropriate traps or stable outlets. 10. All waters of the State (WoS), including wetlands, are to be flagged or otherwise clearly marked in the field. A double row of silt fence is All waters of the State (WoS), including wetlands, are to be flagged or otherwise clearly marked in the field. A double row of silt fence is to be installed in all areas where a 50-foot buffer can't be maintained between the disturbed area and all WoS. A 10-foot buffer should be maintained between the last row of silt fence and all WoS. 11. Litter, construction debris, oils, fuels, and building products with significant potential for impact (such as stockpiles of freshly treated Litter, construction debris, oils, fuels, and building products with significant potential for impact (such as stockpiles of freshly treated lumber) and construction chemicals that could be exposed to storm water must be prevented from becoming a pollutant source in storm water discharges. 12. Initiate stabilization measures on any exposed steep slope (3H:1V or greater) where land-disturbing activities have permanently or Initiate stabilization measures on any exposed steep slope (3H:1V or greater) where land-disturbing activities have permanently or temporarily ceased and will not resume for a period of 7 calendar days. 13. Minimize the topsoil compaction and, unless infeasible, preserve topsoil Minimize the topsoil compaction and, unless infeasible, preserve topsoil 14. Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be Minimize the discharge of pollutants from equipment and vehicle washing, wheel wash water, and other wash waters. Wash waters must be treated in a sediment basin or alternative control that provides equivalent or better treatment prior to discharge. 15. Minimize the discharge of pollutants from dewatering of trenches and excavated areas. These discharges are to be routed through Minimize the discharge of pollutants from dewatering of trenches and excavated areas. These discharges are to be routed through appropriate BMPs (sediment basin, filter bag, etc.). 16. The following discharges from sites are prohibited: a. Wastewater from washout of concrete, unless managed by an appropriate control The following discharges from sites are prohibited: a. Wastewater from washout of concrete, unless managed by an appropriate control b. Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; Wastewater from washout and cleanout of stucco, paint, form release oils, curing compounds, and other construction materials; c. Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and Fuels, oils, or other pollutants used in vehicle and equipment operation and maintenance; and d. Soaps or solvents used in vehicle cleaning and equipment washing. Soaps or solvents used in vehicle cleaning and equipment washing. 17. After construction activities begin, inspections must be conducted at a minimum of at least once every calendar week and must be After construction activities begin, inspections must be conducted at a minimum of at least once every calendar week and must be conducted until final stabilization is reached on all areas of the construction sites 18. If existing BMPs need to be modified or if additional BMPs are necessary to comply with the requirements of this permit and/or SC's If existing BMPs need to be modified or if additional BMPs are necessary to comply with the requirements of this permit and/or SC's Water Quality Standards, implementation must be completed before the next storm event whenever practicable. If implementation before the next storm event is impracticable, the situation must be documented in the SWPPP and alternative BMPs must be implemented as soon as reasonably possible. 19. A Pre-Construction Conference must be held for each construction site with an approved On-Site SWPPP prior to the implementation of A Pre-Construction Conference must be held for each construction site with an approved On-Site SWPPP prior to the implementation of construction activities. For non-linear projects that disturb 10 acres or more this conference must be held on-site unless the Department has approved otherwise.

AutoCAD SHX Text 6.

AutoCAD SHX Text

CONTRACTOR.

AutoCAD SHX Text

PERMANENT GRASSING OF ALL DISTURBED AREAS TO BE PERFORMED BY

AutoCAD SHX Text 7.

AutoCAD SHX Text

ALL SILT FENCE IS TO BE REMOVED UPON COMPLETION OF THIS PROJECT.

AutoCAD SHX Text

AUGUST 14, 2024

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text No. 29604

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text A

S

H W

A Y

W A

T E

R

LI

N E

E X

T E

N S

IO

N

D O

R C

H E

S T

E R

C O

U N

T Y

W A

T E

R A

N D

S E

W E

R D

E P

A R

T M

E N

T

G-03

S E

D

IM

E N

T A

N D

E R

O S

IO

N

C O

N T

R O

L D

E T

A

IL

S

South Carolina Department of Health and Environmental Control

PLAN SYMBOL

DATE

TEMPORARY STOCKPILE

South Carolina Department of Health and Environmental Control

DATE

TEMPORARY STOCKPILE AREA

AutoCAD SHX Text

DORCHESTER COUNTY, SOUTH CAROLINA

AutoCAD SHX Text

235 DEMING WAY SUMMERVILLE, SC 29483 PHONE: (843) 832-0075 FAX: (843) 832-0073

AutoCAD SHX Text

DATE: PROJECT ENGINEER: DESIGN BY: DRAWN BY: CHECKED BY:

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

REV

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

JULY 2022 CR CR SL JC/OW

AutoCAD SHX Text

CONSTRUCTION ENTRANCE

AutoCAD SHX Text SC-06 PAGE 1 of 2

AutoCAD SHX Text

STANDARD DRAWING NO.

AutoCAD SHX Text

FEBRUARY 2014

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text

MIN.

AutoCAD SHX Text

6-INCH

AutoCAD SHX Text

100-FT. MIN.

AutoCAD SHX Text

24-FT. MIN.

AutoCAD SHX Text

AVERAGE STONE DIAMETER

AutoCAD SHX Text

PUBLIC ROAD

AutoCAD SHX Text

OF 2 TO 3-INCHES

AutoCAD SHX Text

WITH A 6-INCH MINIMUM DEPTH

AutoCAD SHX Text

UNDERLYING NON-WOVEN GEOTEXTILE FABRIC

AutoCAD SHX Text

EDGES SHALL BE TAPERED OUT

AutoCAD SHX Text

TOWARDS ROAD TO PREVENT

AutoCAD SHX Text

TRACKING OF MUD ON THE EDGES

AutoCAD SHX Text

SIZE

AutoCAD SHX Text

SPECIFICATION

AutoCAD SHX Text

ROCK PAD THICKNESS

AutoCAD SHX Text

ROCK PAD WIDTH

AutoCAD SHX Text

ROCK PAD LENGTH

AutoCAD SHX Text

ROCK PAD STONE SIZE

AutoCAD SHX Text

6 INCHES

AutoCAD SHX Text

24 FEET

AutoCAD SHX Text

D = 2-3 INCHES

AutoCAD SHX Text

100 FEET

AutoCAD SHX Text SC-15 PAGE 1 of 1

AutoCAD SHX Text

STANDARD DRAWING NO.

AutoCAD SHX Text

FEBRUARY 2014

AutoCAD SHX Text

NOT TO SCALE

AutoCAD SHX Text NOTES: 1. SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF SILT FENCE TO EXTEND AROUND ENTIRE PERIMETER OF STOCKPILE, OR IF STOCKPILE AREA IS LOCATED ON/NEAR A SLOP THE SILT FENCE IS TO EXTEND ALONG CONTOURS OF THE DOWN-GRADIENT AREA. 2. IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY IF STOCKPILE IS TO REMAIN FOR MORE THAN 14 DAYS, TEMPORARY STABILIZATION MEASURES MUST BE IMPLEMENTED. 3. SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN SILT FENCE SHALL BE MAINTAINED UNTIL STOCKPILE AREA HAS EITHER BEEN REMOVED OR PERMANENTLY STABILIZED. 4. THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS WEEKLY THE KEY TO FUNCTIONAL TEMPORARY STOCKPILE AREAS IS WEEKLY INSPECTIONS, ROUTINE MAINTENANCE, AND REGULAR SEDIMENT REMOVAL.

AutoCAD SHX Text 3:1

AutoCAD SHX Text 3:1

AutoCAD SHX Text

SILT FENCE (SEE DETAIL)

AutoCAD SHX Text

SOIL/SEDIMENT STOCKPILE AREA

AutoCAD SHX Text

ORIGINAL GROUND SURFACE

AutoCAD SHX Text

10" (TYP.)

AutoCAD SHX Text

AUGUST 14, 2024

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text No. 29604

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text A

TM

S # 013-00-00-137

236 M

ISTY GLEN

RO

AD

DCW

S W

ELL/TO

W

ER

M

ATCH LIN

E SHEET C-2

M

ATCH LIN

E SHEET C-1

GRID NORTH

NAD 83

RIP RAP

4" DI PIPE

CONCRETE

PIER (TYP)

ACCESS

HATCH

100'

D O

R C

H E

S T

E R

C O

U N

T Y

W A

T E

R A

N D

S E

W E

R D

E P

A R

T M

E N

T

C-01

H

IG

H W

A Y

W A

T E

R

LI

N E

E X

T E

N S

IO

N

P

LA

N A

N D

P R

O

FI

LE

S

T A

+0

T

O S

T A

+0

AutoCAD SHX Text STA 0+00 REMOVE 10"X8" REDUCER TIE-IN TO 10W BEGIN N12W BEGIN RJ PIPE 1-12"X10" REDUCER 1-12" 45° BEND

AutoCAD SHX Text

STA 0+04 1-12" 45° BEND

AutoCAD SHX Text STA 0+17 1-12" TEE 1-12"x8" REDUCER 3 LF OF 8" RJ PIPE 1-8" SOLID SLEEVE TIE-IN TO 8W

AutoCAD SHX Text

STA 1+00 END RJ PIPE

AutoCAD SHX Text

NOTE 1

AutoCAD SHX Text

SILT FENCE (TYP)

AutoCAD SHX Text

EXISTING GRADE

AutoCAD SHX Text

12" C900 DR18 PVC

AutoCAD SHX Text

3.5' (MIN.)

AutoCAD SHX Text

100 LF OF RJ PIPE

AutoCAD SHX Text

235 DEMING WAY SUMMERVILLE, SC 29483 PHONE: (843) 832-0075 FAX: (843) 832-0073

AutoCAD SHX Text

DATE: PROJECT ENGINEER: DESIGN BY: DRAWN BY: CHECKED BY:

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

REV

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

OCT 2023 ACR ACR ACR ACR

AutoCAD SHX Text

DORCHESTER COUNTY, SOUTH CAROLINA

AutoCAD SHX Text 4'

AutoCAD SHX Text 0'

AutoCAD SHX Text 2'

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 40'

AutoCAD SHX Text 0'

AutoCAD SHX Text 20'

AutoCAD SHX Text

HORIZ.

AutoCAD SHX Text

VERT.

AutoCAD SHX Text NOTE: 1. THE WATER MAIN SHALL BE IN SERVICE ALL THE WATER MAIN SHALL BE IN SERVICE ALL THROUGHOUT CONSTRUCTION. 2. ONCE PTO HAS BEEN OBTAINED FROM SCDES, ONCE PTO HAS BEEN OBTAINED FROM SCDES, CUT & CAP 8"W AND ABANDON IN PLACE.

AutoCAD SHX Text

AUGUST 14, 2024

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text No. 29604

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text A

TMS # 013-00-00-007

202 MISTY GLEN

M

ATCH LIN

E SHEET C-3

M

ATCH LIN

E SHEET C-2

M

ATCH LIN

E SHEET C-2

M

ATCH LIN

E SHEET C-1

GRID NORTH

NAD 83

D O

R C

H E

S T

E R

C O

U N

T Y

W A

T E

R A

N D

S E

W E

R D

E P

A R

T M

E N

T

C-02

H

IG

H W

A Y

W A

T E

R

LI

N E

E X

T E

N S

IO

N

P

LA

N A

N D

P R

O

FI

LE

S

T A

+0

T

O S

T A

+0

AutoCAD SHX Text

STA 1+00 END RJ PIPE

AutoCAD SHX Text

STA 5+64 BEGIN RJ PIPE

AutoCAD SHX Text

3.5' (MIN.)

AutoCAD SHX Text

3.5' (MIN.)

AutoCAD SHX Text

EXISTING GRADE

AutoCAD SHX Text

12" C900 DR18 PVC

AutoCAD SHX Text

36 LF OF RJ PIPE

AutoCAD SHX Text

235 DEMING WAY SUMMERVILLE, SC 29483 PHONE: (843) 832-0075 FAX: (843) 832-0073

AutoCAD SHX Text

DATE: PROJECT ENGINEER: DESIGN BY: DRAWN BY: CHECKED BY:

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

REV

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

OCT 2023 ACR ACR ACR ACR

AutoCAD SHX Text

DORCHESTER COUNTY, SOUTH CAROLINA

AutoCAD SHX Text 4'

AutoCAD SHX Text 0'

AutoCAD SHX Text 2'

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 40'

AutoCAD SHX Text 0'

AutoCAD SHX Text 20'

AutoCAD SHX Text

HORIZ.

AutoCAD SHX Text

VERT.

AutoCAD SHX Text

AUGUST 14, 2024

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text H

AutoCAD SHX Text T

AutoCAD SHX Text U

AutoCAD SHX Text O

AutoCAD SHX Text S

AutoCAD SHX Text No. 29604

AutoCAD SHX Text S

AutoCAD SHX Text T

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text I

AutoCAD SHX Text G

AutoCAD SHX Text O

AutoCAD SHX Text O

AutoCAD SHX Text C

AutoCAD SHX Text R

AutoCAD SHX Text O

AutoCAD SHX Text L

AutoCAD SHX Text A

15" RCP

IE: 100.17'

15" RCP

IE: 100.81'

TM

S # 013-00-00-041

105 GAM

ECO

CK DRIVE

MISTY GLEN ROAD 66' R/W (S-18-371)

MATCH LINE SHEET C-3

MATCH LINE SHEET C-2

GR

ID

N O

RT

H

N

AD

MATCH LINE SHEET C-4

MATCH LINE SHEET C-3

D O

R C

H E

S T

E R

C O

U N

T Y

W A

T E

R A

N D

S E

W E

R D

E P

A R

T M

E N

T

C-03

H

IG

H W

A Y

W A

T E

R

LI

N E

E X

T E

N S

IO

N

P

LA

N A

N D

P R

O

FI

LE

S

T A

+0

T

O S

T A

+5

AutoCAD SHX Text

MB

AutoCAD SHX Text

MB

AutoCAD SHX Text

MB

AutoCAD SHX Text

IPF FLAT BAR

AutoCAD SHX Text

IPF FLAT BAR

AutoCAD SHX Text

IPF 1/2" RBR

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text D

AutoCAD SHX Text Y

AutoCAD SHX Text H

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

GRAVEL

AutoCAD SHX Text

WV

AutoCAD SHX Text

WV

AutoCAD SHX Text 33' R/W

AutoCAD SHX Text 33' R/W

AutoCAD SHX Text 33' R/W

AutoCAD SHX Text 33' R/W

AutoCAD SHX Text 33' R/W

AutoCAD SHX Text STA 6+87 1-12" TEE 3 LF OF 12" RJ PIPE (EAST) 1-12" GATE VALVE W/ VALVE BOX & MARKER (EAST) 20 LF OF 12" RJ PIPE (EAST) 1-12"x6" TEE (EAST) 5 LF OF 6" RJ DIP (EAST) 1-6" GATE VALVE W/ VALVE BOX (EAST) 1-FIRE HYDRANT (EAST) 1-12" RJ PLUG (EAST)

AutoCAD SHX Text

WV

AutoCAD SHX Text

STA 6+84 1-12" GATE VALVE W/ VALVE BOX & MARKER

AutoCAD SHX Text

STA 6+90 1-12" GATE VALVE W/ VALVE BOX & MARKER

AutoCAD SHX Text

STA 6+82 1-12" 22.5° BEND

AutoCAD SHX Text

STA 9+04 1-12" 90° BEND 1-12" 11.25° BEND

AutoCAD SHX Text

STA 9+64 END RJ PIPE

AutoCAD SHX Text 16'

AutoCAD SHX Text

5' TYP.

AutoCAD SHX Text

VM

AutoCAD SHX Text H

AutoCAD SHX Text Y

AutoCAD SHX Text D

AutoCAD SHX Text

WV

AutoCAD SHX Text

NOTE 1

AutoCAD SHX Text

NOTE 2

AutoCAD SHX Text

NOTE 2

AutoCAD SHX Text

CUT & REPLACE GRAVEL

AutoCAD SHX Text

STA 8+45 1-2" COMBINATION AIR RELEASE VALVE

AutoCAD SHX Text

3.5' (MIN.)

AutoCAD SHX Text

EXISTING GRADE

AutoCAD SHX Text

12" C900 DR18 PVC

AutoCAD SHX Text

350 LF RJ PIPE

AutoCAD SHX Text

STA 8+45 1-2" COMBINATION AIR RELEASE VALVE

AutoCAD SHX Text

235 DEMING WAY SUMMERVILLE, SC 29483 PHONE: (843) 832-0075 FAX: (843) 832-0073

AutoCAD SHX Text

DATE: PROJECT ENGINEER: DESIGN BY: DRAWN BY: CHECKED BY:

AutoCAD SHX Text

DRAWING NUMBER

AutoCAD SHX Text

REV

AutoCAD SHX Text

DATE

AutoCAD SHX Text

ISSUED FOR

AutoCAD SHX Text

OCT 2023 ACR ACR ACR ACR

AutoCAD SHX Text

DORCHESTER COUNTY, SOUTH CAROLINA

AutoCAD SHX Text 4'

AutoCAD SHX Text 0'

AutoCAD SHX Text 2'

AutoCAD SHX Text

SCALE

AutoCAD SHX Text 40'

AutoCAD SHX Text 0'

AutoCAD SHX Text 20'

AutoCAD SHX Text

HORIZ.

AutoCAD SHX Text

VERT.

AutoCAD SHX Text NOTES: 1. THE EXISTING WATER MAIN SHALL BE IN THE EXISTING WATER MAIN SHALL BE IN SERVICE THROUGHOUT CONSTRUCTION. 2. ONCE PTO HAS BEEN OBTAINED FROM SCDES, ONCE PTO HAS BEEN OBTAINED FROM SCDES, CUT & CAP 8"W AND ABANDON IN PLACE. REMOVE FIRE HYDRANT, CLOSE 8"/6" GATE VALVES, REMOVE VALVE BOXES & FILL IN WITH SAND.

AutoCAD SHX Text

AUGUST 14, 2024

AutoCAD SHX Text S

AutoCAD SHX Text A

AutoCAD SHX Text R

AutoCAD SHX Text N

AutoCAD SHX Text E

AutoCAD SHX Text C

AutoCAD SHX Text I

AutoCAD SHX Text L

AutoCAD SHX Text G

AutoCAD SHX Text R

AutoCAD SHX Text I

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text A

AutoCAD SHX Text N

AutoCAD SHX Text O

AutoCAD SHX Text I

AutoCAD SHX Text S

AutoCAD SHX Text S

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text O

AutoCAD SHX Text R

AutoCAD SHX Text P

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text N

AutoCAD SHX Text A

AutoCAD SHX Text L

AutoCAD SHX Text O

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .