Attachment A - Specifications.pdf

PDF 231 KB Posted

Attached to
4 Kelvin Cryocooler Components Federal contract opportunity
Solicitation number
NB672060-24-01590
Issued by
Department of Commerce National Institute of Standards and Technology

About this file

This document is an attachment containing requirements and specifications for a federal contract opportunity. The solicitation is for the replacement of a Sumitomo Model RDK-415DP cryocooler cold head, including the matching Sumitomo Model F-70L compressor, helium lines, and associated hardware. The total requirement is for 1 each of the cold head and compressor. The solicitation is a combined synopsis/solicitation conducted under FAR Part 12.6 and 13.106, with a NAICS code of 334516 and a small business size standard of 1000 employees. It is a 100% small business set-aside. The solicitation closes on the date specified, with quotes to be delivered electronically to the listed Contracting Officers. Offerors must provide firm fixed price quotes for the specified line items. No used, refurbished, prototype, or remanufactured items will be considered.

View the file

Other files for this federal contract opportunity

Other files attached to 4 Kelvin Cryocooler Components, newest first.
File Type Posted
RFQ NB672060-24-01590 4 Kelvin Cryo Comp.pdf PDF
Attachment B - Sumitomo BN Justification.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Requirements / Specification Document

TITLE: 4 Kelvin Cryocooler Components

Requesting Laboratory / Division / Group:

Communications Technology Laboratory RF Technology Division Superconductive Electronics Group (672.06)

General Statement of Need:

We need to replace a Sumitomo Model RDK-415DP Cryocooler Cold Head including its integrated helium pot, and the matching Sumitomo Model F-70L compressor, helium lines, and requisite hardware.

Item Specifications and Quantities:

Item 1: Cryocooler Cold Head - Sumitomo Model RDK-415DP Quantity: 1 EACH Specifications: 1.1 Original Equipment Manufacturer component for

Formfactor/HPD Model 125 Cryogenic 4K Probe Station

1.2 -DP helium pot for reduction of thermal fluctuations

1.3 -DP helium expansion pot is internal / integrated with the cold head cylinder

1.4 2nd stage cooling capacity of 1.5 W at 4.2 K

1.5 1st stage cooling capacity of 45 W at 50 K

Item 2: Cryocooler Compressor - Sumitomo Model F-70L Quantity: 1 EACH Specifications: 2.1 Model F-70L compressor, 208 VAC version

2.2 Power Cord, F-70L

2.3 Flexline Pair (1 Supply and 1 Return), 3/4" x 65' (Superflex)

2.4 CH Cable, 66' (F-series to 4K CH)

2.5 Install Kit (F Series), Wrench Kit, Charge/Vent, Water Fittings

Procurement Support Information and Ancillary Services:

[Provide input for each section Below or Mark Not Applicable (N/A)]

Section Requirements/Specifications

Planning Considerations ☒ N/A

☐ List any visits required to allow potential vendors to see site specific constraints.

[Explain Requirements.] ☐ US citizen required on-site (foreign nationals require pre-registration 30 days prior to visit.)

☐ Vendor Representative On-Site more than three (3) days.

☐ Other Considerations:

[List other considerations to ensure an accurate quote.]

Shipping & Delivery ☐ N/A

Shipping Address:

☒ NIST-Boulder

ATTN: TBA

Mail Stop: TBA 325 Broadway Boulder, CO 80305

☐ NIST-Gaithersburg

ATTN:

Mail Stop:

100 Bureau Dr Gaithersburg MD 20899

☐ [Alternate Shipping Address] Shipping Criteria:

☐ Partial Delivery Acceptable

☐ [Enter Shipping and Delivery information by item.] ☐ Direct Delivery to OU Building Required [Explain Need for Requirement]

Building /Room Number: [Enter Building/Room Number] ☐ Building has Loading Dock

Containerization Preference: [Enter Container Type] Other Requirements:

[List Any Other Requirement] Delivery Date Criteria:

☒ Delivery Shall Be Competed No Later Than:

20 Wks ARO ☐ Delivery Shall Be Made No Earlier Than:

Click or tap to enter a date.

☐ Scheduled Deliveries:

Item Number Due Date

☐ Other:

[List Other Shipping, Delivery or Special Requirements.]

Electronic Media ☒ N/A

[Enter Electronic Media Requirements by Item.]

☐ Software ☐ Electronic Manuals ☐ License Key ☐ Other:

[List Any Other Electronic Media Requirements] ☐ US Government Email Address for Software Delivery:

[Enter Address]

Installation ☒ N/A

[Enter Installation Requirements by Item]

☐ Vendor Technician on Site ☐ Rigging ☐ Uncrating / Unpackaging ☐ Removal of Packaging Material ☐ Equipment Set Up ☐ Start-Up Services ☐ Turnkey Installation ☐ Other:

[Enter Details] NOTE: SME shall be the coordination POC.

Facility / Utility Considerations ☒ N/A

[List Site Specific Utility Considerations by Item] ☐ OFPM Work Order Numbers

[List Work Order Numbers]

☐ Power Available

Voltage: [Enter voltage] (V) Maximum Current: [Enter max current draw] (A) Phase: [Choose Phase]

Frequency: [Typically 60Hz] (Hz) NEMA Plug Type: [Enter Plug Type] (i.e.: NEMA L5-20P) Environment: [Choose Environment] Other Power Considerations:

[List Any Other Power Considerations.]

☐ Utility Connections:

[List Relevant Available Utilities, Pressure(s) and Flowrate(s).]

☐ Other Considerations:

[List Other Considerations to Ensure an Accurate Quote.]

Inspection and Acceptance ☐ N/A

[Inspection Requirements Per Item (Who, When, What, Where)] ☐ On-Site

☐ Acceptance Not Expected to Exceed 7 Business Days

☒ Acceptance Expected to Exceed 7 Business Days:

30 days

☐ Inspection and Acceptance Plan:

[Explanation]

[Enter Other Requirements]

Training

Training Requirements (Who, When, What, Where)

☐ Number of Trainees: [Enter Number of Trainees] ☐ On-Site

☐ Off-Site Location: [Enter Location(s)] Is Trainee Travel Required: [Choose Answer] Scope of Training ☐ Operation ☐ Maintenance ☐ Troubleshooting

☐ Safety ☐ Other [Enter Other Scope of Training Requirements] ☐ Training Materials to be Provided by Government:

[Describe Materials] ☐ Training Materials to be Provided by Vendor:

[Describe Materials]

☐ Other [Enter Other Training Requirements] NOTE: SME shall be coordination POC.

Warranty ☐ N/A

Base Manufacturer Warranty is acceptable Warranty Length: [i.e. 3 - Years] What is included?

☒ Labor ☒ Parts ☐ Travel ☐ Cost and Liability for Returns

☐ Other [Enter Other Requirements]

☐ 1 Option Period ☐ 2 Option Periods ☐ 3 Option Periods ☐ 4 Option Periods (Maximum)

Calibration

[Describe Calibration Requirements Per Item] Calibration Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period Length: [i.e. 1 – Year / 6 - Months]

☐ 2 Option Periods

Maintenance

[Describe Maintenance Requirements Per Item] Maintenance Plan Length: [i.e. 3 - Years] What is Included?

☐ Labor ☐ Spare Parts ☐ Consumables

☐ Travel ☐ Cost and Liability for Shipment ☐ Software Updates ☐ Manuals

☐ Other [Enter Other Requirements] ☐ Requirements:

[Enter Requirements] (i.e.: On-Site Within 72 hours, etc.)

☐ 1 Option Period

Length: [i.e. 1 – Year / 6 - Months] ☐ 2 Option Periods

Government Furnished Material / Equipment ☒ N/A

List Any Government Furnished Material / Equipment Per Item] ☐ Samples for Testing

☐ Equipment which will leave Government Site

Description:

Serial Number:

NIST Property Number:

[Enter Description] [Enter Serial Number] [Enter NIST Property Number]

☐ Other: [Enter Other Details]

Travel

[Describe any Travel Requirements Per Item] ☐ Explain:

[Enter Justification / Requirement]

[Enter Other Requirements]

NOTE TO VENDOR: To the maximum extent possible, include travel requirement estimates as part of pertinent sections above (Installation, Maintenance, Repair, etc.). Otherwise, Travel will be a separate line item, reimbursable per the Federal Travel Regulation.

File details come from the government source that posted it. Updated .