ATTACHMENT A - Sample VA Installing Contractor Verification Report.docx
DOCX document 67 KB Posted
- Attached to
- J063--Maintenance & Repair-Building Security System Federal contract opportunity
- Solicitation number
- 36C25223Q0283
About this file
This document contains a sample verification report for installing contractors working on a VA building security system project. The report details guidelines for system wiring installation and validation, including requirements to install all devices according to approved drawings and instructions, follow NEC and local codes, set controller addresses and jumpers correctly, perform ground fault, circuit continuity, resistance, and stray voltage tests, and be on site for initial commissioning. Installers must sign and date the report upon validation of the installation.
The related federal contract opportunity is a solicitation to provide maintenance and repair services for the Milwaukee VAMC's building security systems under Solicitation Number 36C25223Q0283. The opportunity is posted by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 12.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| WD 2015-4899 RV20 dtd 12-27-22 Milw.pdf | ||
| WD 2015-4887 RV20 dtd 12-27-22 Appleton.pdf | ||
| WD 2015-4893 RV20 dtd 12-27-22 GB.pdf | ||
| WD 2015-4903 RV 20 dtd 12-27-22 Union Grove.pdf | ||
| 36C25223Q0283.docx | DOCX document | |
| ATTACHMENT B - Sample VA Sequence Verification Report.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Installing Contractor Verification Report
| Inst Key: |
| 2KI50WIKE8YQSIJTWOBYNY |
| Reg Key: |
| TYYEASSXOQ8KBIIKYIYQWWQEITXIEVXRT |
Type:
| Panel: | PNL 57 84TH ST HR | Cmpl | ||
| OMr | Addr | Date | NIA/nit | Comments |
| Terminal: HR BLDG-5701 MAIN ENTRANCE | 1 | [ | ] | [ ] |
| Door: | Reader | [ | ] | [] |
| Keypad | [ | ] | [ ] | |
| Locking Hardware | [ | ] [] | ||
| Aux. Access Device | [ | ] | [] | |
| Other: | [ | ] | [] |
| Terminal: HR BLDG-5702 LOBBY EAST | 2 | [ ] | ||
| Door: | Reader | [ | ] | [ ] |
| Keypad | [ | ] | [] | |
| Locking Hardware | [ | ] | [] | |
| Aux. Access Device | [ | ] | [] | |
| Other: | [ | ] | [ ] |
| Terminal: HR BLDG-5703 LOBBY SOUTH | 3 | [ | ] | [ ] |
| Door: | Reader | [ | ] [ ] | |
| Keypad | [ | ] | [] | |
| Locking Hardware | [ | ] | [ ] | |
| Aux. Access Device | [ | ] | [ ] | |
| Other: | [ | ] | [] |
| Terminal: HR BLDG-5704 SOUTH EAST BACKDOOR | 4 | [ | ] [] |
| Door: | Reader | [ | ] [] |
| Keypad | [ | ] | [ ] |
| Locking Hardware | [ | ] | [] |
| Aux. Access Device | [ | ] | [ ] |
| Other: | [ | ] [ ] |
| Terminal: HR BLDG-5705 SOUTH WEST BACKDOOR | 5 | [ | [] | |
| Door: | Reader | [ | ] | [] |
| Keypad | [ | ] | [ ] | |
| Locking Hardware | [ | ] [] | ||
| Aux. Access Device | [ | ] | [ ] |
Other: [ ] t=IRE and/orSECURITY SYSTEM WIRING -INSTALLING CONTRACTOR VERIFICATION
| JOB NAME: | ABC Project |
| CONTRACT NO: | XX.XX-XX.XX |
| SYSTEM NAME: | XYZ System |
SYSTEM WIRING & CHECKOUT GUIDELINES
(1) Ensure all system devices have been installed in accordance with the approved submittal drawings, equipment installation instructions and JCI Code of Practice.
(2) Installation Validation is not to commission or calibrate devices but rather to provide a means for the installing contractor to certify the installation is complete.
(3) Verification is required to provide a 100% certification of installed work. At a minimum a complete end-to-end check of all wiring installed. Termination Start point through all Termination Junction Points to the Final Termination Point.
(4) Follow all NEC and local code restrictions
(5) Follow project contract specifications for allowed cable installation requirement
(6) For more information regarding proper installation review specific details for the system being installed provided by System Manufacturer.
(7) Installing Contractor is required to be on site for each system during initial commissioning mobilization.
(8) Verify all Tagging is complete
(9) Verify all Controller Addresses and Jumpers are set
GROUNDFAULTTEST.
(1) Verify there are no ground faults on any circuit conductors except required grounding conductors.
(2) Verify shields are insulated from ground at all points along the circuit except as recommended by the manufacturer. Shields are typically terminated only at the point of origin.
(3) Verify that there are no devices installed on the conductors being tested if a 'Megger' or other high voltage test equipment is used to test for ground faults.
CIRCUIT CONTINUITY & RESISTANCE TEST ···
(1) Verify the correct value of end of line resistor is installed on circuits that require them.
(2) Verify no end of line resistor is installed on circuits that do not require them.
(3) Verify shields are continuous.
(4) Verify there are no open circuits.
(5) Verify there are no wire-to-wire short circuits.
STRAYVOLTAGE TEST .
(1) Check for stray voltages each circuit conductor to ground and across each circuit pair.
NOTES; ...
SIGNATURES OF INSTALLERS:
DATE OF VALIDATION:
File details come from the government source that posted it. Updated .