Attachment 5. Zoombug Stewardship IRSC Fire Plan.docx
DOCX document 595 KB Posted
- Attached to
- Zoombug Stewardship IRSC Federal contract opportunity
- Solicitation number
- 12363N22Q4100
- Issued by
- Department of Agriculture Forest Service
About this file
This solicitation is for a stewardship integrated resource service contract (IRSC) to perform hazardous fuels reduction and forest health treatments on the Lassen National Forest. Work will include removing decked and piled materials from recreation sites and units, falling 11 acres of timber, chipping slash piles, and mechanically treating fire-killed and injured trees within 150 feet of roads in burned areas. The contract aims to improve forest health and safety in the wildland urban interface by reducing fuels in watersheds and around recreation facilities and roads. The Department of Agriculture Forest Service will award the contract to achieve land management goals that meet local community needs under stewardship authority.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5 - Zoombug Stewardship IRSC Lassen National Forest Page 2 of 2 Almanor Ranger District
FIRE PLAN FOR MECHANIZED SERVICE CONTRACTS
Zoombug Stewardship IRSC
1. SCOPE:
The provisions set forth below outline the responsibility for fire prevention and suppression activities and establish a suppression plan for fires within the contract area. The contract area is delineated by map in the contract. The provisions set forth below also specify conditions under which contract activities will be curtailed or shut down.
2. RESPONSIBILITIES:
A. Contractor
(1) Shall abide by the requirements of this Fire Plan.
(2) Shall take all steps necessary to prevent his/her employees, subcontractors and their employees from setting fires not required in completion of the contract, shall be responsible for preventing the escape of fires set directly or indirectly as a result of contract operations, and shall extinguish all such fires which may escape.
(3) Shall permit and assist in periodic testing and inspection of required fire equipment. Contractor shall certify compliance with specific fire precautionary measures in the fire plan, before beginning operations during Fire Precautionary Period and shall update such certification when operations change.
(4) Shall designate in the Fire Plan and furnish on Contract Area, during operating hours, a qualified fire supervisor authorized to act on behalf of Contractor in fire prevention and suppression matters.
B. Forest Service The Forest Service may conduct one or more inspections for compliance with the Fire Plan. The number, timing, and scope of such inspections will be at the discretion of agency employees responsible for contract administration. Such inspections do not relieve the Contractor of responsibility for correcting violations of the fire plan or for fire safety in general, as outlined in paragraph A. (2) above.
3. TOOLS AND EQUIPMENT:
The Contractor shall comply with the following requirements during the fire precautionary period, as defined by unit administering contracts: The Fire Precautionary Period is set by the State of California which is April 1 through December 1 of any year.
A. Fire Tools and Equipment:
This contract DOES require a Fire Box, but at minimum requires Fire Tools associated with working with chainsaws under the California Public Resource Code (CPRC) Section 4428. Fire tools kept at each operation landing shall be sufficient to equip all employees in the felling, yarding, loading, chipping, and material processing operations associated with each landing. Fire equipment shall include two tractor headlights for each tractor dozer used in Contractor’s Operations. Tractor headlights shall be attachable to each tractor and served by an adequate power source. All required fire tools shall be maintained in suitable and serviceable condition for fire fighting purposes.
Trucks, tractors, skidders, pickups and other similar mobile equipment shall be equipped with and carry at all times a size 0 or larger shovel with an overall length of not less than 46 inches and a 2 ½ pound axe or larger with an overall length of not less than 28.
Where cable yarding is used, Contractor shall provide a size 0 or larger shovel with an overall length of not less than 46 inches and a filled backpack can (4 or 5 gallon) with hand pump within 25 feet of each tail and corner block.
B. Fire Extinguishers:
Contractor shall equip each internal combustion yarder, fuel truck, and loader with a fire extinguisher for oil and grease fires (4-A:60-B:C).
Skidders and tractors shall be equipped with a minimum 5-BC fire extinguisher.
All Fire Extinguishers shall be mounted, readily accessible, properly maintained and fully charged.
Contractor shall equip each mechanized harvesting machine with hydraulic systems, powered by an internal combustion engine (chipper, feller/buncher, harvester, forwarder, hot saws, stroke delimber, etc.), except tractors and skidders, with at least two 4-A:60-B:C fire extinguishers or equivalent.
C. Spark Arresters and Mufflers:
Contractor shall equip each operating tractor and any other internal combustion engine with a spark arrester, except for motor vehicles equipped with a maintained muffler as defined in C.P.R.C Section 4442 or tractors with exhaust-operated turbochargers. Spark Arresters shall be a model tested and approved under forest Service Standard 5100-1a as shown in the national Wildfire Coordinating Group Spark Arrester Guide, Volumes 1 and 2, and shall be maintained in good operating condition. Every motor vehicle subject to registration shall at all times be equipped with an adequate exhaust system meeting the requirements of the California Vehicle Code.
D. Power Saws:
Each power saw shall be equipped with a spark arrester approved according to C.P.R.C. Section 4442 or 4443 and shall be maintained in effective working order. An Underwriters laboratories (UL) approved fire extinguisher containing a minimum 14 ounces of fire retardant shall be kept with each operating power saw. In addition, a size 0 or larger shovel with an overall length of not less than 38 inches shall be kept with each gas can but not more than 300 feet from each power saw when used off cleared landing areas.
This contract REQUIRES, Section 3 (A), of this Fire Plan.
E. Tank Truck or Trailer:
Contractor shall provide a water tank truck or trailer on or in proximity to Contract Area during Contractor’s Operations hereunder during Fire Precautionary Period. When Project Activity Level B or higher is in effect, a tank truck or trailer shall be on or immediately adjacent to each active landing, unless otherwise excepted when Hot Saw or Masticators are being used.
The tank shall contain at least 300 gallons of water available for fire suppression. Ample power and hitch shall be readily available for promptly and safely moving tank over roads serving Contract Area. Tank truck or trailer shall be equipped with the following:
(1) Pump, which at sea level, can deliver 23 gallons per minute at 175 pounds per square inch measured at the pump outlet. Pumps shall be tested on Contact Area using 5/16 inch orifice in the Forester One Inch In-Line Gauge test kit. Pump shall meet or exceed the pressure value in the following table for nearest temperature and elevation:
The pump outlet shall be equipped with 1 ½ inch National Standard Fire Hose thread. A bypass or pressure relief valve shall be provided for other than centrifugal pumps.
(2) 300 feet of ¾ inch inside diameter rubber-covered high-pressure hose mounted on live reel attached to pump with no segments longer than approximately 50 feet, when measured to the extreme ends of the couplings. Hose shall have reusable compression wedge type 1 inch brass or lightweight couplings (aluminum or plastic). One end of hose shall be equipped with a coupling female section and the other end with a coupling male section. The hose shall, with the nozzle closed, be capable of withstanding 200 PSI pump pressure without leaking, distortions, slipping of couplings, or other failures.
(3) A shut off combination nozzle that meets the following minimum performance standards when measured at 100 P.S. I. at the nozzle:
(4) Sufficient fuel to run the pump at least 2 hours and necessary service accessories to facilitate efficient operation of the pump.
The Contractor is using Hot Saws or Masticators, an additional 250 feet of light weight hose, approved by the Forest Service, shall be immediately available for use and be capable of connection to the 300 feet of hose and appurtenances in (2) and (3) above.
This equipment and accessories shall be deliverable to a fire in the area of operations and is subject to the requirements for each specific activity level identified in Section 5.
F. Compressed Air Foam System:
A Compressed Air Foam System (CAFS) is a fire suppression system where compressed air is added to water and a foaming agent. By agreement, Contractor may substitute a CAFS or functional equivalent in lieu of the tank truck, trailer or fire extinguishers, provided it meets or exceeds the following specifications and requirements:
(1) Variable foam expansion ratio: 10:1 to 20:1.
(2) Units shall be kept fully charged with air; water and foam concentrate as recommended by the manufacturer and have the appropriate tools to service the system.
(3) The unit shall contain enough energy to empty tank and clear hose prior to exhausting propellent.
(4) The unit shall be capable of being completely recharged within 10 minutes.
(5) When used on cable yarding landings, the unit shall be outfitted for immediate attachment to carriage and transported without damage to the unit.
Fire extinguishers required for Hot Saws, Masticators and similar equipment identified in Section 3 (B), may be substituted with a 3 gallon CAFS.
Tank trailer, trailer or equivalent may be substituted with a 30 Gallon CASFS with at least 550 feet of one inch hose and an adjustable nozzle with enough water, air and foam concentrate for at least one recharge.
This equipment and accessories shall also be deliverable to a fire in the area of operations and subject to the requirements for each specific activity level identified in Section 5.
4. GENERAL
A. State Law:
In addition to the requirements in this Fire Plan, the Contractor shall comply with all applicable laws of the State of California. See California Public Resource Codes.
B. Permits Required:
The Contractor must secure a special written permit from the District Ranger or designated representative before camping, burning, welding, cutting metal or starting any warming fires.
C. Smoking:
Smoking shall not be permitted during fire season, except in a barren area or in an area cleared to mineral soil at least three feet in diameter. In areas closed to smoking, the CO may approve special areas to be used for smoking. The Contractor shall sign designated smoking areas. Contractor shall post signs regarding smoking and fire rules in conspicuous places for all employees to see. Contractor's supervisory personnel shall require compliance with these rules. Under no circumstances shall smoking be permitted during fire season while employees are operating light or heavy equipment or walking or working in grass and woodlands.
E. Storage and Parking Areas.
Equipment service areas, parking areas, and gas and oil storage areas shall be cleared of all flammable material for a radius of at least 10 feet unless otherwise specified by local administrative unit. Small mobile or stationary internal combustion engine sites shall be cleared of flammable material for a slope distance of at least 10 feet from such engine. The COR shall approve such sites in writing.
F. Reporting Fires:
As soon as feasible but no later than 15 minutes after initial discovery, Contractor shall notify Forest Service of any fires on Contract Area or along roads used by Contractor. Contractor's employees shall report all fires as soon as possible to any of the following Forest Service facilities and/or personnel listed below, but not necessarily in the order shown:
| Name |
| Office Address |
| Office telephone |
| Dispatch Center |
| SIFC |
| 1491 5th Street Susanville, CA |
| (530) 257-5575 |
| Nearest FS Station |
| Chester |
| 900 HWY 36 Chester, CA |
| (530) 258-2141 |
| Inspector |
| Fred Ngotel/ Ryan Wellings |
| 900 HWY 36 Chester, CA |
| (530) 310-4253/ (530) 250-7151 |
| Inspector/COR |
| John Outland/Matt Cerney |
| 900 HWY 36 Chester, CA |
| (530) 310-3529 |
| District Ranger |
| Russel Nickerson |
| 900 HWY 36 Chester, CA |
| (530) 258-2141 |
When reporting a fire, provide the following information:
· Your Name
· Call back telephone number
· Project Name
· Location: Legal description (Township, Range, Section); and Descriptive location (Reference point)
· Fire Information: Including Acres, Rate of Spread and Wind Conditions.
G. Communications:
Contractor shall furnish a serviceable telephone, radio-telephone or radio system connecting each operating side with Contractor's headquarters. When such headquarters is at a location which makes communication to it clearly impractical, Forest Service may accept a reasonable alternative location. The communication system shall provide prompt and reliable communications between Contractor's headquarters (or agreed to alternative) and Forest Service via commercial or Forest Service telephone.
The Contractor shall, prior to commencing work furnish the following information relating to key personnel:
| Title |
| Name |
| Telephone Number |
Field Supervisor
Crew Leader
5. EMERGENCY PRECAUTIONS
Contractor's Operations shall conform to the limitations or requirements in the Project Activity Level (PAL) table below. Project Activity Levels applicable to this project shall be the predicted activity levels for the Fire Danger Rating Area(s), or fire weather station(s) stated in the Contract Area Map Legend on Integrated Resource Service Contracts (IRSC’s), and other contracts where applicable.
| Fire Danger Rating Area/Fire Weather Station for Project |
| Chester RAWS |
The Forest Service, in its sole discretion, may change the predicted activity level if the current fire suppression situation, weather and vegetation conditions warrant an adjustment. If practicable, Forest Service will determine the following day’s activity level by 6:00 PM. Contractor shall obtain the predicted Project Activity Level from the appropriate Ranger District Office before starting work each day.
| Phone Number or Website to obtain Predicted Activity Levels: |
| (530) 257-9553 |
Forest Service may change the Project Activity Level Table to other values upon revision of the National Fire Danger Rating System. When Contractor is notified, the revised Project Activity Levels will supersede the levels in the Project Activity Level Table below.
PROJECT ACTIVITY LEVEL
| Level |
| Project Activity Minimum Requirements and Restrictions. Restrictions at each level are cumulative. |
| A |
| Minimum requirements noted above in Sections 4 and 5. |
| B |
| 1. Tank truck, trailer, or approved CAFS substitute shall be on or adjacent to the Active Landing. |
| C | |
| 1. | When Hot Saws or Masticators are operating, a tank truck, trailer, or approved CAFS substitute shall be within ¼ mile of these operations. Effective communications shall exist between the operator and the Active Landing. |
2. Immediately after Mechanical Operations cease, Fire patrol is required for two hours.
| D | ||
| 1. | Immediately after Hot Saw or Masticator operations cease, Fire patrol is required for three hours. | |
| 2. | No Dead Tree felling after 1:00 PM, except recently dead. | |
| 3 | No burning, blasting, welding or cutting of metal after 1:00 PM, except by special permit. |
| Ev |
| 1. The following activities may operate all day: |
a) Loading and hauling logs decked at approved landings.
b) Loading and hauling chips stockpiled at approved landings.
c) Servicing equipment at approved sites.
d) Dust abatement, road maintenance (Chainsaw use prohibited), culvert installation within cleared area, chip sealing, paving, earth moving or rock aggregate stock pile loading and installation (does not include pit or quarry development).
e) Chainsaw and log processing operations associated with loading logs or other forest products at approved landings.
2. Hot Saws or Masticators may operate until 1:00 PM; provided that:
a) A tractor with a blade or other equipment capable of constructing fireline is on or adjacent to the active landing or within ¼ mile of the operating equipment. This piece of equipment shall have effective communication with the Hot Saw or Masticator.
b) Any additional restrictions specified by the Forest.
3. All other conventional Mechanical Operations are permitted until 1:00 PM.
4. Some operations may be permitted after 1:00 PM, on a case-by-case basis, under the terms of a PAL Ev Variance Agreement. Activities for which a Variance may be issued are:
· Rubber Tire Skidding
· Chipping on Landings
· Helicopter Yarding
· Fire Salvage When approved by a Line Officer, a Variance Agreement can be implemented when the criteria specified in the agreement are met and mitigation measures are in place. This approval is good for ten (10) days unless cancelled sooner or extended by the Contracting Officer for an additional ten (10) days. Variance approval can be withdrawn at the sole discretion of the Forest Service. Variance approval is contingent on the 7-day fire weather forecast, fuel conditions, site characteristics, current fire situation, state of Contractor’s equipment for prevention and suppression readiness, type of operation and social and community considerations etc. (See attached Project Activity Level Variance Agreement).
| E | |
| The following activities may operate all day: | |
| 1. | Loading and hauling logs decked at approved landings. |
| 2. | Loading and hauling chips stockpiled at approved landings. |
| 3. | Servicing Equipment at approved sites. |
| 4. | Dust abatement, road maintenance (chainsaw use prohibited) or loading stock piles and rock aggregate installation (does not include pit or quarry development). |
| 5. | Chainsaw operation associated with loading at approved landings. |
All other activities are prohibited.
Climatology Chart that indicates the historic activity levels for the project fire danger rating is shown below. The data below should only be used as a reference. For current in formation call (530) 257-9553. The weather station used for developing daily PAL modeling (Chester RAWS).
Region 5 Project Activity Level (PAL) Ev Variance Application/Agreement
Project Name: __________________________________________ Contract Number: _______________________________________ Contractor Name: _______________________________ Request #__, for period: __________________________________ Units/Subdivisions Affected: _______________________________
Location of operation:
Slope
Aspect
Elevation
Fuels on site
Fuels in surrounding area
7 Day PAL Outlook
Short range predictions (Red Flags)
Fuel Moistures
Response time of suppression resources
Potential for ignition
RAWS location
Current Fire Situation:
Draw down information
National Readiness Level
Contractual considerations:
Normal Operating Season
Frequency of recent contract fires in area
Type of operation
Contractors past/current performance & equipment readiness
Other site specific mitigation or precaution (i.e. Contractors proposals)
Social & Community Considerations:
Proximity of high value resources
Sensitivity of location
Proposed Actions:
Description of Mitigation Measures:
Remarks:
Fire Management Officer Concurrence
Date
Line Officer Approval
Date
I have considered the above request and determined the specified mitigation measures or actions must be implemented to continue operations in Project Activity Level Ev. Unless extended, the approval remains in effect for ten (10) calendar days unless cancelled sooner or extended by the Forest Service for an additional ten (10) days. At the sole discretion of the Forest Service, this variance can be modified and/or cancelled at no cost to the government.
Contracting Officer
Date
Contractor Representative
Date image3.png image4.png image1.png image2.png
File details come from the government source that posted it. Updated .