This document outlines the requirements for a federal stewardship contract solicitation on the Lassen National Forest. The solicitation will result in an agreement to improve forest health and reduce hazardous fuels in areas impacted by the 2021 Dixie Fire. Work will include removing hazard trees and debris from recreation sites, roads, and a campground in the Almanor area. Additional treatments in the Zoombug area will reduce high fuel loads along roads by mechanically treating fire-killed and damaged trees within 150 feet of routes. Eighteen-inch diameter trees and larger will be cut, skidded, processed, and decked to designated landings. The selected contractor will be responsible for all road maintenance associated with their operations on routes including PL307 and FS Road 26N27. The solicitation is issued by the USDA Forest Service and work will enhance safety and restore areas affected by the Dixie Fire within the Lassen National Forest.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 3: APPENDIX C
C(T)5.31# – ROAD MAINTENANCE REQUIREMENTS. (9/04) Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
PRE HAUL
| ROAD |
| TERMINI |
| MILES |
| ROAD MAINTENACE T-SPECIFICATIONS |
| FROM |
| TO |
| T-800 |
| T-803 |
| T-806 |
| T-8## |
| T-8## |
| T-8## |
| T-8## |
| T-8## |
| PL308 |
| JCT w/ HWY 89 |
| JCT w/ PL309 |
| 0.6 |
| PL309 |
| JCT w/ PL308 |
| JCT w/ PL307 |
| 1.2 |
| PL307 |
| JCT w/ PL309 |
| JCT w/ BU92523 |
| 26 |
| 26N27 |
| JCT w/ PL307 |
| JCT w/ BU91422 |
| 4.8 |
DURING HAUL
| ROAD |
| TERMINI |
| MILES |
| ROAD MAINTENACE T-SPECIFICATIONS |
| FROM |
| TO |
| T-800 |
| T-803 |
| T-806 |
| T-8## |
| T-8## |
| T-8## |
| T-8## |
| T-8## |
| PL308 |
| JCT w/ HWY 89 |
| JCT w/ PL309 |
| 0.6 |
| C |
| C |
| PL309 |
| JCT w/ PL308 |
| JCT w/ PL307 |
| 1.2 |
| C |
| C |
| PL307 |
| JCT w/ PL309 |
| JCT w/ BU92523 |
| 26 |
| C |
| C |
| 26N27 |
| JCT w/ PL307 |
| JCT w/ BU91422 |
| 4.8 |
| C |
| C |
POST HAUL
| ROAD |
| TERMINI |
| MILES |
| ROAD MAINTENACE T-SPECIFICATIONS |
| FROM |
| TO |
| T-800 |
| T-803 |
| T-806 |
| T-8## |
| T-8## |
| T-8## |
| T-8## |
| T-8## |
| PL308 |
| JCT w/ HWY 89 |
| JCT w/ PL309 |
| 0.6 |
C
| PL309 |
| JCT w/ PL308 |
| JCT w/ PL307 |
| 1.2 |
C
| PL307 |
| JCT w/ PL309 |
| JCT w/ BU92523 |
| 26 |
C
| 26N27 |
| JCT w/ PL307 |
| JCT w/ BU91422 |
| 4.8 |
C
Notes:
C = Contractor Performance Item The maximum volume of Contractor responsibility for Slide and Slump repair is 20 cubic yards O = Optional Contract Line Item NFSR = National Forest Service Road CR = County Road JCT = Junction
Dust Abatement Plan (B5.3, C5.31, T-806)
| Contract Name: |
| Zoombug Stewardship IRSC |
| Sale Volume |
| 32336 |
| GT |
Material Type or Grade
| Application Rate |
| Frequency |
of Subsequent Application
Wt.-Vol.
Preparation Method Conversion Method
Road No.
| Initial |
| Subsequent |
| PL308 |
| Water |
| n/a |
| n/a |
| Watering shall be |
performed once each day for haul up to 10 loads/day.
T-806 as needed N/A
| PL309 |
| Water |
| n/a |
| n/a |
| PL307 |
| Water |
| n/a |
| n/a |
| 26N27 |
| Water |
| n/a |
| n/a |
For haul over 10 loads/day watering shall be performed as needed to abate dust.
ROAD MAINTENANCE T-SPECIFICATIONS FOR STEWARDSHIP CONTRACTS
Contractor shall maintain roads in accordance with the following Contract Road Maintenance Requirements Summary:
Contractor will be responsible for doing all pre, during and post haul road maintenance with no compensation from the Forest Service.
T-SPECIFICATIONS
| T-SPEC NUMBER |
| SPECIFICATION TITLE |
| T-800 |
| Definitions |
| T-801 |
| Slide and Slump Repair |
| T-802 |
| Ditch Cleaning |
| T-803 |
| Surfacing Blading |
| T-804 |
| Surfacing Repair |
| T-805 |
| Drainage Structures |
| T-806 |
| Dust Abatement |
| T-807 |
| Roadway Vegetation |
| T-808 |
| Miscellaneous Structures |
| T-809 |
| Waterbars |
| T-810 |
| Barriers |
| T-811 |
| Surface Treatment |
T-812
T-813
| T-814 |
| Drainage Excavation |
| T-815 |
| Culvert Installation |
| Zoombug Stewardship IRSC | Lassen National Forest |
| Page 2 of 35 | Almanor Ranger District |
SPECIFICATION T-800 DEFINITIONS
Wherever the following terms or pronouns are used, the intent and meaning shall be interpreted as follows:
800-1.1—Agreement—Maintenance projects require a mutually acceptable method to resolve the problems which arise when incompatible situations arise between drawings and specifications and actual conditions on the ground to allow orderly and satisfactory progress of the maintenance.
These specifications have been developed in anticipation of those problem areas and have provided that such changes will be by Agreement.
It is intended that drawings and specifications will govern unless "on-the-ground" conditions warrant otherwise, when specifications call for "Agreement", "agreed", or "approval" such Agreement or approval shall be promptly confirmed in writing.
800-1.2—Annual Road Maintenance Plan—A plan prepared by various users of one or several roads. The plan is an Agreement on maintenance responsibilities to be performed for the coming year.
800-1.3—Base Course—Material used to reinforce Subgrade or, as shown on drawings, placed on Subgrade to distribute wheel loads.
800-1.4—Berm—Curb or dike constructed to prevent Roadway runoff water from discharging onto embankment slope.
800-1.5—Borrow—Select Material taken from designated borrow sites.
800-1.6—Clearing Limits—The limits of clearing as designated on the ground or on the drawings.
800-1.7—Crown, Inslope, and Outslope—The cross slope of the Traveled Way to aid in drainage and traffic maneuverability.
800-1.8—Culverts—A conduit or passageway under a road, trail, or other obstruction. A culvert differs from a bridge in that it is usually entirely below the elevation of the Traveled Way.
800-1.9—Drainage Dip—A dip in the Traveled Way which intercepts surface runoff and diverts the water off the Traveled Way. A Drainage Dip does not block the movement of traffic.
800-1.10—Drainage Structures—Manufactured structures which control the runoff of water from the Roadway including Inslope, overside drains, aprons, flumes, downdrains, downpipes, culverts and the like.
800-1.11—Dust Abatement Plan—A table which lists the road, dust palliative, application rates, and estimated number of subsequent applications.
800-1.12—Lead-off Ditches—A ditch used to transmit water from a Drainage Structure or Drainage Dip outlet to the natural drainage area.
800-1.13 —Material—Any substances specified for use in the performance of the work.
800-1.14—Prehaul Maintenance—Road maintenance work which must be accomplished to maintain the roads to a satisfactory condition commensurate with the Contractor's use, provided Contractor's operations do not damage improvements in Section H.21 of the contract/solicitation or National Forest resources and hauling can be done safely. This work will be shown in the above Road Maintenance Requirements.
Prehaul Maintenance work the Contractor elects to perform will be in compliance with the Road Maintenance T-Specifications.
800-1.15—Right-of-Way—A general term denoting:
(1) The privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or
(2) Land, appurtenances thereto, or interest therein, usually in a strip, acquired for public or private passageway.
800-1.16—Roadbed—The portion of a road between the intersection of Subgrade and sideslopes, excluding that portion of the ditch below Subgrade.
800-1.17—Road Maintenance Requirements—A table which shows applicable road maintenance specifications to be performed by Contractor on specific roads.
800-1.18—Roadside—A general term denoting the area adjoining the outer edge of the Roadway.
800-1.19—Roadway—The portion of a road within the limits of excavation and embankment.
800-1.20—Shoulder—That portion of Roadway contiguous with Traveled Way for accommodation of stopped vehicles, for emergency use, and lateral support of base and Surface Course, if any.
800-1.21—Slide—A concentrated deposit of Materials from above or on backslope extending onto the Traveled Way or Shoulders, whether caused by mass land movements or accumulated raveling.
800-1.22—Slough—Material eroded from the backslope which partially or completely blocks the ditch, but does not encroach on the Traveled Way so as to block passage of traffic.
800-1.23—Slump—A localized portion of the Roadbed which has slipped or otherwise become lower than that of the adjacent Roadbed and constitutes a hazard to traffic.
800-1.24—Special Project Specifications—Specifications which detail conditions and requirements peculiar to the individual project.
800-1.25—Subgrade—Top surface of Roadbed upon which Base Course or Surface Course is constructed. For roads without Base Course or Surface Course, that portion of Roadbed prepared as the finished wearing surface.
800-1.26—Surface Course—The Material placed on Base Course or Subgrade primarily to resist abrasion and the effects of climate. Surface Course may be referred to as surfacing.
800-1.27—Surface Treatment Plan—A table which lists the roads and surface treatments to be applied.
800-1.28—Traveled Way—That portion of Roadway, excluding Shoulders, used for the movement of vehicles.
800-1.29—Turnouts—That portion of the Traveled Way constructed as additional width on single lane roads to allow for safe passing of vehicles.
800-1.30—Water Source—A place designated on the Road Maintenance Map for acquiring water for road maintenance purposes.
800-1.31—Waterbar—A dip in the Roadbed which intercepts surface runoff and diverts the water off the Roadway. A Waterbar is not designed to be traversable by logging trucks.
ILLUSTRATION OF ROAD STRUCTURE TERMS
SPECIFICATION T-803 SURFACE BLADING
DESCRIPTION:
1.1—Surface blading is keeping a native or aggregate Roadbed in a condition to facilitate traffic and provide proper drainage. It includes maintaining the Crown, Inslope or Outslope of the Traveled Way, Turnouts, and Shoulder; repairing Berms; blending approach road intersections; and cleaning bridge decks, Drainage Dips, and Lead-off Ditches.
REQUIREMENTS:
3.1—Surface blading shall be performed before, during, and after Contractor's use as often as necessary to facilitate traffic and proper drainage.
3.2—The surface blading shall preserve the existing cross-section. Surface irregularities shall be eliminated and the surface left in a free-draining state and to a smoothness needed to facilitate traffic. Surface Material which has been displaced to the Shoulders or Turnouts shall be returned to the Traveled Way. The blading operation shall be conducted to prevent the loss of surface Material and to provide for a thorough mixing of the Material being worked.
3.3—Water, taken from Water Sources designated on Contract Area Map shall be applied during blading if sufficient moisture is not present to cut, mix, or compact the surface Material.
3.4—On native surfaced roads, Material generated from backslope sloughing, and ditch cleaning may be blended with the surface Material being worked. On aggregate surfaced roads, this Material shall not be blended with Surface or Base Course Material unless agreed otherwise.
3.5—Roadway backslopes or Berms shall not be undercut, nor shall new Berms be established unless agreed otherwise.
Berms shall be repaired by placing Material, as needed to restore the Berm, to reasonably blend with existing line, grade, and cross-section.
3.6—Drainage Dips and Lead-off Ditches shall be cleaned and maintained to reasonably blend with existing line, grade, and cross-section.
3.7—Intersecting roads shall be bladed for a distance of 50 feet to assure proper blending of the two riding surfaces.
3.8 —Rocks or other Material remaining on the Traveled Way after the final pass that are larger than 4 inches in diameter or are larger than the maximum size of imported surfacing shall be removed from the Traveled Way. Unless otherwise designated by the Forest Service, the oversized Material shall be disposed of by sidecasting. Sidecasting into streams, lakes, or water courses will not be permitted.
3.9—Material resulting from work under this specification shall not remain on or in structures, such as Culverts, overside drains, cattleguards, ditches, Drainage Dips, and the like.
3.10—Material resulting from work under this specification, plus any other accumulated debris, shall be removed from bridge decks and the deck drains opened. This includes existing debris under pre haul maintenance.
MEASUREMENT:
4.1—Surface blading will be measured to the nearest one-tenth (0.1) mile as measured by calibrated vehicle odometer along the road centerline.
SPECIFICATION T-806 DUST ABATEMENT
DESCRIPTION:
1.1—This work consists of preparing Traveled Way and furnishing and applying Materials to abate dust.
MATERIALS:
2.1—The roads requiring dust abatement, type of dust abatement Material to be used, the rates of application, and frequency of applications will be shown on Dust Abatement Plan. The Dust Abatement Plan may be changed by written Agreement.
2.2—Water. The locations of Water Sources are shown on Contract Area Map.
2.3—Dust abatement Materials shall meet the requirements of the following subsections of FP-14 Standard Specifications for Construction of Roads and Bridges on Federal Highway Projects.
| Emulsified Asphalt | 702.03 | |||
| Blotter Material | 703.13 | |||
| Magnesium or Calcium Chloride Brine | 725.02 | |||
| Calcium Chloride Flake | 725.02 | |||
| Lignin Sulfonate | 725.20 |
2.4—Testing of Materials. Certification of magnesium chloride, calcium chloride brine, calcium chloride flake, blotter material and lignin sulfonate will be provided by the manufacturer and approved by the Forest Service.
REQUIREMENTS:
3.1—General. Dust abatement Materials shall be applied to the road surface as necessary to control road surface loss, provide for road user safely, and minimize damage to adjacent resources.
3.2—Compaction. When the methods listed below specify compaction, Traveled Way shall be compacted by an 8 to 10 ton pneumatic, steel-wheeled or equivalent vibrating roller making 2 passes over the full Traveled Way and Shoulder width, unless compaction is not required on the Dust Abatement Plan.
3.3—Preparation to Dust Abatement Materials Other Than Water. The following applies to all methods of preparation.
Bituminous residue shall be scarified and pulverized to produce loosened Material not exceeding 4 inches in greatest dimension.
Traveled Way shall be bladed in accordance with T-803.
Prior to applying DO-6BA, DO-6PA, or DO-8, the top 2 inches of Traveled Way shall contain not less than 80 percent nor more than 120 percent of optimum moisture as determined by AASHTO T-99, Method C. Prior to applying other bituminous Material, Traveled Way shall have a moisture content between 1 and 3 percent. If surface dusting prevents the bituminous Material from penetrating, a light application of water shall be applied just prior to applying the bituminous Material.
Lignin Sulfonate and magnesium chloride shall be applied when the top 1 inch of Traveled Way contains not less than 3 percent moisture, nor more than 120 percent of optimum moisture as determined by AASHTO T-99, Method C.
Moisture content will be determined in accordance with AASHTO T-217 OR T-239.
One or more of the following methods shall be used, as specified in the Dust Abatement Plan.
Method 1: Compact Traveled Way and apply the dust abatement Material.
Method 2: Develop a layer of loose Material approximately 1 inch in depth for the full width of Traveled Way. Apply the dust abatement Material to this loose Material and compact after penetration. If traffic makes maintenance of the loose Material difficult, 1 inch of the Material may be bladed into a windrow along the Shoulder. The specified moisture content shall be maintained in the windrow and the top 1 inch of Traveled Way. The windrow shall be bladed to a uniform Material. When the dust abatement Material has penetrated, Traveled Way shall be compacted.
Method 3: Blade 1 inch of Material from Traveled Way into a windrow along the Shoulder. Maintain the specified moisture content in the windrow and the top inch of Traveled Way. Apply half the dust abatement Material. When the dust abatement Material has penetrated, the windrow shall be bladed to a uniform depth across dust abatement Traveled Way, and the remaining dust abatement Material shall be applied. Traveled Way shall be compacted.
Method 4: Develop a layer of loose Material approximately 2 inches in depth for the full width of Traveled Way. Apply half the dust abatement Material to the loose Material. Blade the top 2 inches into a windrow along the Shoulder. Apply the remaining dust abatement Material to Traveled Way and the Berm. Spread the Berm evenly across Traveled Way and compact.
3.4—Preparation for Dust Abatement with Water. Traveled Way shall be prepared in accordance with Specification T-803 Surface Blading when required.
3.5—Application Tolerance. Dust abatement Materials other than water shall be applied within 0.05 gallons per square yard of the rate specified.
3.6—Mixing Requirements. DO-6BA, DO-6PA, and DO-8 shall be thoroughly circulated in the distributor within 1 hour of application.
3.7—Weather Limitations. Dust abatement Materials shall not be applied when it is raining.
Bituminous Material shall be applied when the surface temperature of Traveled Way is 50 degrees Fahrenheit or higher.
Lignin sulfonate and magnesium chloride shall be applied when the atmospheric temperature is 40 degrees Fahrenheit or higher.
3.8—Blotter Material. Blotter Material shall be spread in a sufficient quantity to prevent tire pickup.