Attachment 5 Asbestos and Lead Based Paint Report.pdf
PDF 8 MB Posted
- Attached to
- GAOA Hogback Lookout Restoration Federal contract opportunity
- Solicitation number
- 127EAW22Q0031
- Issued by
- Department of Agriculture Forest Service
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 1 127EAW22Q0031 1442 Revised.pdf | ||
| Amendment 1 Attachment 1 SOW Revised.pdf | ||
| Attachment 7 WD CA20220007.pdf | ||
| Attachment 3 Plans 1-6_05-06-2021 signed Kari.pdf | ||
| Attachment 4 Maps.pdf | ||
| Attachment 1 SOW.pdf | ||
| Attachment 8 RFI Form.docx | DOCX document | |
| Attachment 2 Fire Plan.pdf | ||
| 127EAW22Q0031 Solicitation.pdf | ||
| Attachment 6 NEPA_HogbackRestorationLTFMay2021 signed.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ASBESTOS & LEAD-BASED PAINT SURVEY REPORT
Hogback Lookout Shasta-Trinity National Forest
Prepared for:
Kelly Nolan, P.E.
Facilities Engineer
Prepared by:
Clay Guzi and Steve West
CAC – 05-3900
IAS – 11153
April 22, 2021
2021-194 Hogback Lookout Page i
TABLE OF CONTENTS
Page
PURPOSE
EXECUTIVE SUMMARY
SURVEY METHODOLOGY
CONCLUSIONS AND RECOMMENDATIONS
APPENDICES
Appendix A Site Maps Appendix B Asbestos Laboratory Data and Chain-of-Custody Appendix C Lead Laboratory Data and Chain-of-Custody
Hogback Lookout Page 1
Asbestos & Lead-Based Paint Survey Report
PURPOSE
Guzi-West personnel submitted asbestos and lead paint samples from the subject structure for analysis in order to determine the presence or absence of these materials at the Shasta Trinity National Forest’s Hogback Lookout, located on Fenders Ferry Rd in
East Shasta County, California. Site vicinity and sample location maps are depicted on the provided in Appendix A; asbestos laboratory data is provided in Appendix B; lead laboratory data is provided in Appendix C.
EXECUTIVE SUMMARY
According to the National Emission Standard for Hazardous Air Pollutants (NESHAP), asbestos-containing building materials (>1% asbestos) must be removed prior to demolition or renovation activities, if the material is considered to be a Regulated
Asbestos-Containing Material (RACM). RACM is generally defined as all friable asbestos containing material and non-friable material, which contains >1% asbestos, and that will become friable during demolition or renovation. A NESHAP notification is required in two circumstances: 1. For any demolition regardless of the presence or absence of asbestos;
NESHAP regulations define a demolition as ‘removing a load-bearing structural member,’ or 2. A renovation that disturbs greater than 160 square feet or 260 linear feet of RACM.
Building materials containing asbestos were identified and will likely be affected by proposed renovation actions; Table 1 at the end of this section provides the asbestos-containing materials identified, their respective concentrations, and approximate quantities. We recommend the asbestos abatement contractor submit a NESHAP notification a minimum of 10 working days prior to conducting any site disturbance activities due to the presence of RACM. Certified asbestos abatement workers must remove the asbestos-containing materials if they will be disturbed as part of the subject project. Alternatively, the flooring and mastic could be left in place and new flooring installed over the existing flooring which would
Hogback Lookout Page 2 prevent disturbance of the asbestos-containing materials. Regardless of the applicability of NESHAP, Cal-OSHA regulations require certified asbestos abatement workers be utilized to abate the materials containing any concentration of asbestos.
Table 1 Asbestos-Containing Materials
Material/Location Asbestos Concentrations (Chrysotile only type detected)
Approximate Quantity
Tan Sheet Vinyl Flooring located throughout
18.0% 160 SF (RACM)
Black Mastic beneath sheet flooring located throughout
3.0% 160 SF
Three federal agencies have regulations that cover renovation work in regards to the presence of painted surfaces containing lead. HUD’s Lead Safe Housing Rule requires specific lead evaluation and hazard control activities for renovations in HUD-assisted target housing; the EPA’s Renovation, Repair, and Painting (RRP) Rule requires that firms performing renovation, repair and painting activities in target housing (which is most pre-1978 housing) or in pre-1978 child-occupied facilities be certified, use trained and certified renovators, and use lead-safe work practices; and, the Federal Occupational
Safety and Health Administration’s (OSHA’s) Lead in Construction standard (29 CFR
1926.62) requires certain procedures for construction work that may expose a worker to lead. Both HUD and the EPA define lead-based paint as paint containing equal to or greater than 5,000 parts per million, ppm, lead. However, the state of California has more stringent standards via the California Code of Regulations, Title 8, Section 1532.1 and maintains their own training and certification program under the California Department of
Public Health. California Code of Regulations, Title 8, Section 1532.1 defines a lead-containing surface coating as a surface coating containing equal to or greater than 600 parts per million lead. The applicability of each agency and regulation depends upon the concentrations of lead identified in painted surfaces, the proposed work, and the condition of painted surfaces and the structure in general at the time of the survey. No lead-based paint was identified in the material samples collected; however, the two paint
Hogback Lookout Page 3 samples collected both contain concentrations of lead greater than 600 ppm and thus are classified as lead-containing surface coatings. Table 2 at the end of this section provides the lead-containing materials identified and their respective concentrations, and EPA classification. Guzi-West recommends all painted surfaces be treated as lead-containing surface coatings due to both samples collected from the proposed renovation area being classified as lead-containing surface coatings. Prospective contractors should have training in accordance with the requirements of Title 8, California Code of Regulations, Section 1532.1 and ensure proper worker protection is utilized during any disturbance of paint containing lead.
Table 2 Painted Surfaces Containing Lead
Material/Location Lead-containing surface coating (ppm)
EPA Classification
Paint on Interior Window Sill and Sash
966.5 ppm Lead-containing surface coating
Paint on ceiling backer board
726.4 ppm Lead-containing surface coating
ASBESTOS & LEAD—SURVEY METHODOLOGY
Guzi-West personnel submitted suspected asbestos-containing building materials collected from the subject structure on April 8, 2021. Following collection of the samples, the samples were double bagged and then sent via overnight delivery to PEL Laboratory, LLC, under chain-of-custody, for identification of asbestos content. Each suspect asbestos-containing material (ACM) identified, was bulk sampled in general accordance with sampling guidelines established by the Environmental Protection Agency and 29
CFR 1926.1101. The following summarizes the sampling procedures utilized.
• Bulk samples were collected by qualified personnel using appropriate sampling tools and leak-tight containers.
Hogback Lookout Page 4
• Decontamination of bulk sampling tools was used to prevent the spread of secondary contamination to subsequent bulk samples.
• Each bulk sample was individually numbered, recorded on a Sample Log, and submitted under chain-of-custody to PEL Laboratory, LLC.
• The locations of all samples were marked on a site map for the project, please see Appendix A.
• The samples were analyzed by Polarized Light Microscopy (PLM) following National Institute of Occupational Safety and Health (NIOSH) Method 9002.
Guzi-West personnel submitted paint chip samples collected from the subject structure on March 2, 2021. The goal for submittal of the paint chip samples is determining the concentrations of lead levels in paint coating samples, comparison of the levels to State and/or Federal standards, and identification of whether levels exceed specified requirements. Paint samples were sent to EPA-certified laboratories for analysis to determine lead percentages by weight, parts per million, or milligrams per sq. centimeters.
All samples for the subject project were sent via overnight registered delivery to SanAir
Technologies Laboratory, Inc. for analysis by test method SW846/M3050B/7000B.
CONCLUSIONS AND RECOMMENDATIONS FOR ASBESTOS & LEAD
As stated above, asbestos-containing materials were identified that will be impacted by proposed renovation activities. Asbestos was identified in the structure’s flooring and the mastic beneath the flooring, please see Appendix B. We recommend the asbestos abatement contractor submit a NESHAP notification a minimum of 10 working days prior to conducting any site disturbance activities that will impact the asbestos-containing sheet vinyl, which is classified as RACM. Certified asbestos abatement workers must remove the asbestos-containing materials if they will be disturbed as part of the subject project.
Alternatively, the flooring and mastic could be left in place and new flooring installed over the existing flooring which would prevent disturbance of the asbestos-containing materials.
No lead-based paint was identified in the two samples at the subject project; but the two samples were identified as lead-containing surface coatings. Please see the lead
Hogback Lookout Page 5 laboratory report provided in Appendix C. Guzi-West recommends all painted surfaces be treated as lead-containing surface coatings due to the samples containing a concentration of lead that classifies them as lead-containing surface coatings.
Prospective contractors should have training in accordance with the requirements of Title
8, California Code of Regulations, Section 1532.1 and ensure proper worker protection is utilized during any disturbance of paint containing lead.
Asbestos and lead regulations are complicated and are subject to change. The intent of the above information is to advise you of some of the regulations that may affect you, but is not intended to be an all-encompassing discussion of asbestos and lead regulations.
The sole purpose of this investigation and of this report is to assess the site with respect to asbestos-containing materials and painted surfaces containing regulated levels of lead.
Guzi-West is not responsible for locating asbestos-containing building materials in inaccessible areas such as behind walls, above hard ceilings, beneath flooring, or underground. This report has been prepared on behalf of and for the exclusive use of
The United States Forest Service, and is subject to and issued in connection with the agreement and the provisions thereof.
APPENDIX A
Site Maps
Vicinity Map
Shasta-Trinity National Forest Created On: Created On: 4/21/2021
Project Number: 2021-194
Pit River
Fenders Ferry Rd
NOT TO SCALE - FOR APPROXIMATION ONLY
Datum: North American Datum 1983 Projection: UTM Zone 10N Cartographer: Seamus Begley Credit: USAD NAIP, US Forest Service, Shasta County
Map (1 of 2)
North
Turn Right for 35N93B - Hogback MTN
Stay Right for 35N93 - Hogback MTN
Turn Right onto 35N46 - Reynolds Basin
Hogback Lookout Lat: 40.8834 deg
Long: -121.9984 deg
Turn onto Fenders Ferry Road
Lat: 40.8234 Long: -121.9315
Round Mountain
CA
Datum: North American Datum 1983 Projection: UTM Zone 10N Cartographer: Seamus Begley Credit: Map Content made by US Forest Service
Hogback Lookout Shasta-Trinity National Forest
Lead Samples Asbestos Samples
Created On: Created On: 4/22/2021 Project Number: 2021-194
Map (2/2)
(-) No Asbestos Detected
NOT TO SCALE - FOR APPROXIMATION ONLY
(+) Contains Asbestos
North
LCSC - Lead Containing Surface Coating
APPENDIX B
Asbestos Laboratory Data and Chain-of-Custody
Client:
Project Name:
Project Address:
Project No.:
Methodology:
T/A Time:
PEL Sample No.
Client
Sample No.:
Composition Color Description
Asbestos
Presence/Absence
& Type (if present)
Non‐Asbestos
Fiber Type
1 101 Layered Tan Flooring Chrysotile 18.00 Cellulose 20
Calcium
Carbonate Binder
1a Layered Black Mastic Chrysotile 3.00 Tar
2 102 Homogeneous White Ceiling Tile No Asbestos Detected Cellulose 55 Binder
Glass Fibers 50
3 103 Homogeneous Brown
Ceiling Tile
Adhesive No Asbestos Detected
Calcium
Carbonate
Analyst
Signature: Date of Report:
Reviewer
Signature: Date of Report:
PEL Laboratories is accredited under the National Voluntary Laboratory Accreditation Program (NVLAP) for performing polarized light microscopy (PLM) analyses under methods known as App. E to Sub. E of 40 CFR Part 762 and EPA/600/R‐93/116. This report must not be used to claim product endorsement by NVLAP or any other agency of the U.S. Government. These results relate only to the samples tested and must not be reproduced, except in full, without the approval of the laboratory. Although PLM analysis is commonly performed to determine the presence or absence of asvestos in building materials, the EPA methods acknowledge that analysis by PLM is subject to limitations and for certain materials, such as vermiculite, a more sophisticated methodology may be necessary.
4/14/2021
4/14/2021
East Shasta County Date Received: 4/12/2021
2 Date Analyzed: 4/15/2021
Guzi‐West PEL Client No.: 2
Hogback Lookout/USFS PEL Work Order No.: 4/14/21‐2
Non‐Fibrous Matrix Types
App. E to Sub. E of 40 CFR Part 763 and EPA/600/R‐93/116 Received By: Chelsea Beattie
3‐day Analyzed By: Chelsea Beattie
333 Jackson Plaza | Ann Arbor, MI 48103 | 877.220.3528
I P
E lloborotorles
A sbesto• C h•I~ o f C ustody 333 Jackson pi,is Ann A rbor, M l 48103 sn-220-3628 ~ P ellabs,com
C ontact Inform ation
C ontact:
ProJect_!nform atlon
ProJ.otHame:H O u, 1,~c.,t:::... I L o o k.ou-r /u s J:...S Phone:
een Phone:
Projeelt l.O(:IIIOn, (;,r;,<
$ IJ~...5, -r--A
C
.,o U N
-r
A ccount#:
E-M ail: 1
Projeet_ 10:
S am plelN am e:
D ate:
t..(
P.O. Num ber:
VIA
R eceived By
R eque1ted Servlce1JPlease Check the A:pproprii!~eEloxes)
PLM
P
LM
TE
M
TEM
Lab. No.
Em ail:
-Other:
Pa_g_e 1 of For Lab U se O n
R eport R esults (C heckO neB o,()
R eiect
Turnaround Tim e
---I.
IV
em
,lr:uite Altig
I ,A#'-AHeRA
I I 1-•-Al>Mnr.a EPA llOO/R.93/11 ruah e C
F R
Piil 7113 (EPA 6001 flQ,1/004)
A#'-NIOIH
7"°2
BIAk-OuontJtativo ( f s~m e-O ay
~ao "°"" C ount (PLM
EPA)
I
(llpeolfy In Cl'fflmt11111) I
,, · ,, IDrtnldnQ W Iii«• EPA 100,2 'f, I IOtnor (Rpoofy in Comm&ntal
2-4-Hour
1000 POO'II Count (PLM
EPA)
I
PC
I '°"'-
PN
parllliO n
I I
I
I
INI09H7.00
I
S am ple ID
Volum l/ArN arl M afl
N o.
(Ton Charactol'I M ax)
D eacrlotlon
I~ I
Location (u,ppllcalle)
TvDe C ond.
Friable i lo I
F Ll'x,it, IN
T H
/toU
6 HD
u T ll,t, s,;
N\.111\ P t:} IJ.c
"1
C .~ I LI -\I Gi
T I L..
17-1-flo u b I-{ o v r I G
,o S
MAA.
P.D f=.
\ O c:.6
' l,1 ,J'
A-0 H
6.S W
17+ l'u u 6 fl 'bu T ,2.. s f:"
N
\.M fD
F 3 .. B e 7 8 g
Dam age Catoaorle1: ND•Not D_1m aged d po=Potentlal Dam age PSD=Potentlally Significant Dam age Frlablllty: F•Frlable NF•Not Friable
•Slgnlflcantly t arn a
I tlon SM
=Surfaclng M aterial M
M =M lsc.M aterial aterlal Type: TSl•Thennal System lnsu a
SanAir ID#: 21018410
Project Name: Hogback Lookout/US
Report Date: 4/19/2021
Analysis Report prepared for Guzi-West Inspection & Consulting, LLC
Dear Clay Guzi, We at SanAir would like to thank you for the work you recently submitted. The 2 sample(s) were received on Monday, April 19, 2021 via Fax or Email request. The final report(s) is enclosed for the following sample(s): 201, 202.
These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.
Sincerely, Sandra Sobrino Asbestos & Materials Laboratory Manager SanAir Technologies Laboratory
Final Report Includes:
- Cover Letter
- Analysis Pages
- Disclaimers and Additional Information
Sample conditions:
- 2 samples in Good condition.
1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com
Project Number:
P.O. Number:
Project Name: Hogback Lookout/US
3/2/2021Collected Date:
4/19/2021 9:23:00 AMReceived Date:
4/19/2021 4:51:48 PM
21018410 SanAir ID Number
FINAL REPORT
Guzi-West Inspection & Consulting, LLCName:
Address: PO Box 492770
Redding, CA 96049
530-515-0922Phone:
Analyst: King, Kristina
Asbestos Bulk PLM EPA 600/R-93/116 Stereoscopic Components
SanAir ID / Description Appearance % Fibrous % Non-fibrous Asbestos Fibers
202 / 21018410-002 Ceiling Backer Board
Green Fibrous
Heterogeneous
80% Cellulose 20% Other None Detected
Analyst:
Analysis Date: 4/19/2021 Date: 4/19/2021
Approved Signatory:
Project Number:
P.O. Number:
Project Name: Hogback Lookout/US
3/2/2021Collected Date:
4/19/2021 9:23:00 AMReceived Date:
4/19/2021 4:51:48 PM
21018410 SanAir ID Number
FINAL REPORT
Guzi-West Inspection & Consulting, LLCName:
Address: PO Box 492770
Redding, CA 96049
Disclaimer
This report is the sole property of the client named on the SanAir Technologies Laboratory chain-of-custody (COC). Results in the report are confidential information intended only for the use by the customer listed on the COC. Neither results nor reports will be discussed with or released to any third party without our client's written permission. The final report shall not be reproduced except in full without written approval of the laboratory to assure that parts of the report are not taken out of context. The information provided in this report applies only to the samples submitted and is relevant only for the date, time, and location of sampling. The accuracy of the results is dependent upon the client’s sampling procedure and information provided to the laboratory by the client. SanAir assumes no responsibility for the sampling procedure and will provide evaluation reports based solely on the sample(s) in the condition in which they arrived at the laboratory and information provided by the client on the COC, such as: project number, project name, collection dates, po number, special instructions, samples collected by, sample numbers, sample identifications, sample type, selected analysis type, flow rate, total volume or area, and start stop times that may affect the validity of the results in this report. Samples were received in good condition unless otherwise noted on the report. SanAir assumes no responsibility or liability for the manner in which the results are used or interpreted. This report does not constitute and shall not be used to claim product certification, approval, or endorsement by NVLAP, NIST, or any other U.S. governmental agencies and may not be certified by every local, state, and federal regulatory agencies.
Samples are held for a period of 60 days. Fibers smaller than 5 microns cannot be seen with this method due to scope limitations.
For NY state samples, method EPA 600/M4-82-020 is performed.
NYELAP Disclaimer:
Polarized- light microscopy is not consistently reliable in detecting asbestos in floor covering and similar non-friable organically bound materials. Quantitative transmission electron microscopy is currently the only method that can be used to determine if this material can be considered or treated as non-asbestos containing.
Asbestos Certifications NVLAP lab code 200870-0 City of Philadelphia: ALL-460 PA Department of Environmental Protection Number: 68-05397 California License Number: 2915 Colorado License Number: AL-23143 Connecticut License Number: PH-0105 Massachusetts License Number: AA000222 Maine License Number: LB-0075, LA-0084 New York ELAP lab ID: 11983 Rhode Island License Number: PCM00126, PLM00126, TEM00126 Texas Department of State Health Services License Number: 300440 Commonwealth of Virginia 3333000323 Washington State License Number: C989 West Virginia License Number: LT000616 Vermont License: AL166318 Louisiana Department of Environmental Quality: 212253, Cert 05088
Revision Date: 8/14/2020
Page 1 of 1Page 4 of 8
APPENDIX C
Lead Laboratory Data and Chain-of-Custody
SanAir ID#: 21017053
Project Name: Hogback Lookout/USFS
Report Date: 4/15/2021
Analysis Report prepared for Guzi-West Inspection & Consulting, LLC
Dear K. Nolan, We at SanAir would like to thank you for the work you recently submitted. The 2 sample(s) were received on Monday, April 12, 2021 via FedEx. The final report(s) is enclosed for the following sample(s): 201, 202.
These results only pertain to this job and should not be used in the interpretation of any other job. This report is only complete in its entirety. Refer to the listing below of the pages included in a complete final report.
Sincerely, Abisola Kasali Metals Laboratory Director SanAir Technologies Laboratory
Final Report Includes:
- Cover Letter
- Analysis on Test Family AA
- Disclaimers and Additional Information
Sample conditions:
- 2 samples in Good condition.
1551 Oakbridge Dr. Suite B, Powhatan, VA 23139 | 804.897.1177 | Fax: 804.897.0070 | www.SanAir.com | IAQ@SanAir.com
Project Number:
P.O. Number:
Project Name: Hogback Lookout/USFS
3/2/2021Collected Date:
4/12/2021 9:00:00 AMReceived Date:
4/15/2021 9:11:41 AM
21017053 SanAir ID Number
FINAL REPORT
Guzi-West Inspection & Consulting, LLCName:
Address: PO Box 492770
Redding, CA 96049
Analyst: Oliver, Hannah
Test Method: SW846/M3050B/7000B
Lead Paint Analysis PAINT µg Pb Sample Size Calculated Sample Sample
Sample Description In Sample (grams) RL Results Results
21017053 - 1 201 108 0.1115 89.7 966.5 0.097 % Int Window Sill & Sash µg/g (ppm) By Weight
21017053 - 2 202 75 0.1032 96.9 726.4 0.073 % Ceiling Backer Board µg/g (ppm) By Weight
Method Reporting Limit <10 µg/0.1 g paint
Signature:
Date: 4/13/2021 Date: 4/14/2021
Sample 202 Contained Substrate.
Reviewed:
Project Number:
P.O. Number:
Project Name: Hogback Lookout/USFS
3/2/2021Collected Date:
4/12/2021 9:00:00 AMReceived Date:
4/15/2021 9:11:41 AM
21017053 SanAir ID Number
FINAL REPORT
Guzi-West Inspection & Consulting, LLCName:
Address: PO Box 492770
Redding, CA 96049
Revision Date 10/20/2020
Disclaimer
SanAir Technologies Laboratory, Inc. participates in the Environmental Lead Accreditation Program (ELAP) administered by AIHA-LAP, LLC (Lab ID162952). Refer to our accreditation certificate or www.aihaaccreditedlabs.org for an up to date list of the Fields of Testing for which we are accredited. SanAir also participates in the State of New York’s DOH-ELAP (Lab Id 11983), and has met the EPA's NLLAP program standards. This report does not constitute endorsement by AIHA-LAP, LLC and/or any other U.S. governmental agencies; and may not be accredited by every local, state or federal regulatory agency.
This report is the sole property of the client named on the SanAir Technologies Laboratory chain-of-custody (COC).
Neither results nor reports will be discussed with or released to any third party without our client’s written permission. Final reports cannot be reproduced, except in full, without written authorization from SanAir
Technologies Laboratory, Inc. The information provided in this report applies only to the samples submitted and is relevant only for the date, time, and location of sampling. SanAir is not responsible for sample collection or interpretation made by others. SanAir assumes no responsibility for information provided by the client on the COC such as project number, project name, collection dates, po number, special instructions, samples collected by, sample numbers, sample identifications, sample type, selected analysis type, flow rate, total volume or area, and start stop times that may affect the validity of the results in this report. SanAir Technologies Laboratory, Inc only assures the precision and accuracy of the data it generates and assumes no responsibility for errors or biasing that occur during collection prior to SanAir’s receipt of the sample(s). SanAir’s Method Detection Limits (MDL) and Reporting Limits
(RL) have been derived using various materials meeting each accrediting agencies’ standards. All quality control results are acceptable unless otherwise noted. Results are not corrected for blanks. For Lead Exposure Limits in
Paint, refer to HUD Guidelines for the Evaluation and Control of Lead-Based Paint Hazards and State and Federal
Regulations, where applicable.
http://www.aihaaccreditedlabs.org/
| ASBESTOS & LEAD-BASED PAINT SURVEY REPORT |
| Asbestos & Lead-Based Paint Survey Report |
| ASBESTOS & LEAD—SURVEY METHODOLOGY |
| CONCLUSIONS AND RECOMMENDATIONS FOR ASBESTOS & LEAD |
| Appendices.pdf |
| ASBESTOS & LEAD-BASED PAINT SURVEY REPORT |
| Asbestos & Lead-Based Paint Survey Report |
| ASBESTOS & LEAD—SURVEY METHODOLOGY |
| CONCLUSIONS AND RECOMMENDATIONS FOR ASBESTOS & LEAD |
{"type":"Document","isBackSide":false,"languages":["en-us"],"usedOnDeviceOCR":true}
File details come from the government source that posted it. Updated .