Attachment_4_Submittals.pdf
PDF 18 KB Posted
- Attached to
- CO - RMA - DEMOLISH BUILDING 121 Federal contract opportunity
- Solicitation number
- 140F0122R0052
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_5_Questions_and_Answers_0001.docx | DOCX document | |
| Sol_140F0122R0052_Amd_0001.pdf | ||
| Attachment_1_Statement_of_Work_Updated_22Mar22_0001.pdf | ||
| Attachment_3_WDOL_Davis_Bacon_Wages.pdf | ||
| Sol_140F0122R0052.pdf | ||
| Attachment_2_Specs.pdf | ||
| Attachment_1_Statement_of_Work.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SHEET 1 OF 1
PROJECT NAME: Building 121 Demolition ENGR. PROJECT NO.: 22-016
LOCATION: ROCKY MOUNTAIN ARSENAL NWR CONTRACT NO.:
CONTRACTOR:
Spec.
Section
Number NO.
Description of item and submittal type (i.e. shop drawings, manufacture cut sheets, tests required, certifications, samples, operating and maintenance manuals, etc.)
Contractor's
Submittal
Number
Date
Submitted
Action
Taken
Date
Resubmitted
Action
Taken Comments
1 Contractor Asbestos Certifications
2 Contractor Licenses
3 Waste and Recycle Mainifests
4 Demolition Forms
5 Regulatory Acceptance Documents
6 Subcontractor Information / Licenses
7 Fill Material
8 Photos
9 Grout Mix Design
NOTE: The list may not included all required items.
PROJECT SUBMITTAL LIST
A - Approved as Submitted.
B - Approved, Except as Noted. No Resubmission Required.
C - Approved, Except as Noted. Resubmission Required.
D - No Action Taken. See Comments. Resubmission Required.
E - disapproved. See Comments. Resubmission Required.
File details come from the government source that posted it. Updated .