Attachment_1_Statement_of_Work_Updated_22Mar22_0001.pdf
PDF 12 MB Posted
- Attached to
- CO - RMA - DEMOLISH BUILDING 121 Federal contract opportunity
- Solicitation number
- 140F0122R0052
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment_5_Questions_and_Answers_0001.docx | DOCX document | |
| Sol_140F0122R0052_Amd_0001.pdf | ||
| Attachment_3_WDOL_Davis_Bacon_Wages.pdf | ||
| Sol_140F0122R0052.pdf | ||
| Attachment_4_Submittals.pdf | ||
| Attachment_1_Statement_of_Work.pdf | ||
| Attachment_2_Specs.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
DEMOLITION
OF
BUILDING 121
ROCKY MOUNTAIN ARESENAL NATIONAL WILDLIFE REFUGE
I. General Project Scope and Background
A. General
Work under this contract consists of the demolition of one structure at the Rocky Mountain
Arsenal National Wildlife Refuge (RMA NWR). Demolition shall include removal of the structure, all foundation systems and some surrounding concrete walkways. All utilities (water, electric, septic, etc.) shall be capped and / or demolished as detailed below.
B. Work Site and Job Conditions
Building 121 is located approximately 4 miles northeast of Commerce City, Colorado on the Rocky
Mountain Arsenal National Wildlife Refuge. Building 121 is a one-story, prefabricated, pre-engineered metal structure with plan dimensions of approximately 40 feet by 125 feet for a total of about 5,000 square feet. The building is a steel frame structure bearing on isolated pads with grade beams between pads and slab on grade construction. The building has a metal exterior and roof. Demolition shall include utilities and other appurtenant features as detailed below.
Prospective bidders are encouraged to visit the work area in order to examine the existing site conditions.
Site visits may be arranged by contacting the Refuge’s project manager, Tom Ronning at 719-729-2275 or email at Tom_Ronning@fws.gov.
Work performed under the Contract shall not commence prior to 7:00 a.m. and will not continue past 5:00 p.m. daily and will cease on Saturdays, Sundays, and holidays unless prior permission of the Refuge
Manager is given.
mailto:Tom_Ronning@fws.gov
Contractor shall be required to coordinate all work with the Refuge Manager to prevent disruption of
Refuge activities.
C. Background
The Government is providing the Contractor, access to informational documents listed below:
• Location Map and Site Plan
• Building 121 Construction Schematics
• Building Photos
• FWS Condition Report
• Colorado Department of Public Health and Environment “Asbestos – Renovation and
Demolition” information paper
Available construction drawings indicate the structure was erected in the early 1990s. As noted above the construction drawings for the facility are included with this scope of work.
Utilities requiring termination and removal include: 1) High Voltage Electrical Service 2) Secondary
Electrical Service 3) Natural Gas Service 4) Water Service 5) Sanitary Sewer Service, and
5) Communication Service. Utility locates required to facilitate the demolition will be coordinated through the Refuge Manager or their designated project manager.
There are no known Asbestos Containing Materials (ACM) within the structure. The Contractor shall hire a State of Colorado Certified Asbestos Building Inspector (CABI) for on-site evaluation of building components and sampling in accordance with Colorado Department of Public Health and Environment
Regulation 8, Part B. A report detailing the results of the asbestos survey shall be provided to the
Contracting Officer two weeks prior to mobilization for demolition.
D. Temporary Facilities and Controls
1. Temporary Utilities
Contractor shall be responsible for providing temporary electrical service required to perform the work. The Contractor shall provide and maintain temporary lighting as may be required for demolition work and safety purposes.
Contractor shall provide telephone service to the job site at all times during working hours.
Contactor is responsible for providing toilet facilities for use by Contractor's employees and
Subcontractors on the jobsite. The toilet facilities shall be kept in a clean and orderly condition and removed at the completion of the work.
Contractor shall provide potable drinking water for all workers. Site water is available for demolition work.
2. Access Roads and Storage Areas
All operations of Contractor (including storage of materials) upon Government premises shall be confined to areas authorized or approved by the Contracting Officer or their on-site agent.
Restore all storage areas and any other areas disturbed by demolition activities to their original, or better, condition, or as approved by the Contracting Officer or approved on-site agent upon completion of the work.
Observe all laws and regulations of the local, County, State, and Federal authorities in the use of all public roads and highways for transportation of materials and equipment used in connection with work on the project. Observe all overhead construction, bridges, cables, and the like. Repair damage to roads, highways, overhead construction and similar items, resulting from operations in connection with this project at Contractor’s expense.
3. Protection and Restoration
Contractor shall protect all structures and vegetation during the progress of the work not approved for removal. The Contractor shall remove from the site all debris and unused materials and shall, upon completion of the work, restore the site as nearly as possible to its original condition, including the replacement, at the Contractor's expense, of any facility or landscaping which has been damaged. The Contractor shall limit removal of any vegetation to that which interferes with the demolition work. Removal of landscaping and vegetation shall be coordinated with the on-site representative.
Contractor shall be liable for repair of damages to roads, utilities, structures, or property, due to any act, omission, neglect, or misconduct during the period of performance of the services of this contract.
4. Safety
Compliance: Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site, including the provisions of 29CFR1910 and 29CFR1926 of the Code of Federal Regulations. The Contractor shall hold harmless the
Government for failure to comply with any applicable safety or health regulations on the part of himself, his employees, or his subcontractors.
Every employee is responsible for complying with applicable safety requirements, wearing prescribed safety equipment, and preventing avoidable accidents and property damage.
Contractor shall provide and maintain a basic first aid kit for use of workers. First aid supplies shall be commensurate with size of workforce, with items necessary for first aid treatment of all injuries. All workers shall be advised of the location of first aid supplies.
Contractor shall post telephone numbers of the nearest hospital or ambulance service and fire station in conspicuous locations. All workers shall be advised of the location of telephone numbers.
The job site will be equipped with at least one non-freezing type fire extinguisher in each field office, workshop, and storage shed at the work site. Fire extinguishers shall be placed in locations readily accessible to workers.
5. Traffic Regulations
Contractor shall provide, erect and maintain all necessary barricades, suitable and sufficient flasher lights, flagmen, danger signals and signs, and shall take all necessary precautions for the protection of the work and the safety of the public. Roads closed to traffic shall be protected by effective barricades on which shall be placed acceptable warning signs. All barricades and obstructions shall be illuminated at night and all lights shall be kept burning from sunset until sunrise. Install appropriate traffic signs at crossroads and approaches to site as needed to direct all affected traffic. Specific sign and barricade requirements are detailed in Department of
Transportation, "Manual on Uniform Traffic Control Devices."
II. Demolition and Removal
A. Building Demolition and Removal
The Work shall consist of demolition, removal, and disposal of the structure and utilities’ components detailed below. The Contractor shall provide and pay for all labor, materials, equipment, tools, temporary heat, transportation, disposal and other facilities and services necessary for proper execution and completion of the project, whether temporary or permanent.
Building 121:
• See attached “Lunch Room / Change Building” construction drawings.
• Demolition and removal of entire structure including foundations and underground components.
• Utilities to be cut and capped as detailed below.
Staging areas required for Contractor supplies, equipment and refuse handling shall be coordinated with the Refuge Manager or their designated project manager. Staging areas and laydown yards will be restored to pre-demolition conditions at the conclusion of work.
Multiple utility services are conveyed across or near to the demolition site. These include data and telecom lines running to and from the communications vault on the east side of the structure and electric service and communications lines to a pole mounted siren on the west side of the structure. The
Contractor shall maintain these utilities for the duration of the project. Locate services required for the project shall be coordinated with the Refuge Manager or their designated project manager. Required utility outages impacting multiple structures and associated utility services must be coordinated with the
Refuge Manager or his designated Project Leader a minimum of two weeks in advance of the proposed outage.
All depressions resulting from demolition including foundation systems, sidewalks, transformers and utility conveyances shall receive contractor sourced fill soils similar to existing soils. The fill shall be compacted to avoid settlement. Grading of demolition areas shall have topsoil mounded to create a gentle positive slope away from the demolished areas. In the event of settling, the contractor shall remove all topsoil of the area effected, place additional fill, compact fill, and place topsoil back to original location.
Reseeding of contractor placed topsoil will be the responsibility of RMA NWR personnel.
Excavations in asphalt will be saw cut prior to removal of the asphalt section. Make straight saw cuts to the full depth of the asphalt section. Saw so the surface remaining is generally vertical over its full depth.
Saw cut changes in direction to a 90-degree angle. Asphalt patches shall be full depth Hot Mix Asphalt
(HMA).
The Contractor shall demolish and dispose of approximately 200 lineal feet of 5-foot wide, 6-inch deep concrete sidewalk. Sidewalks requiring demolition will be identified by the Refuge Manager or their designated project manager at the initial site walk through.
Fencing north of the subject building is not part of this demolition contract. If partial removal is required to facilitate demolition the Contractor must coordinate with the Refuge Manager or their designated representative two weeks in advance of the proposed action. The extent of modification to the fence line will be limited to the minimum required to execute demolition. The fence line shall be reestablished at conclusion of the project. Acceptance of the reestablished fence line shall be coordinated with the Refuge
Manager or their designated representative.
A warning siren / public announcement (PA) system is mounted on a utility pole approximately 40 feet west of the northwest corner of the structure. The PA system is not part of this demolition contract and shall be maintained in a fully functioning capacity for the duration of the contract. Utilities supporting the asset shall be protected by the Contractor for the duration of the contract.
A communications vault is located on the east side of the structure providing service to multiple buildings. This communications vault is not part of this demolition contract and shall be maintained in a fully functioning capacity for the duration of the contract. Communications and data lines conveyed to and from the communications vault shall be protected by the Contractor for the duration of the project.
The structure is used by US Fish and Wildlife Service for cold storage. Prior to demolition activities the
Contractor shall coordinate with the Refuge Manager or their designated project manager to verify all US
Fish and Wildlife property has been removed from the facility.
The Contractor shall abate and control environmental pollution arising from demolition activities by complying with all applicable Federal, State, and local laws and regulations concerning environmental pollution control and abatement, as well as the specified requirements in this contract. Compliance with this requirement by Subcontractors will be the responsibility of the Contractor.
Compliance: The Contractor shall assume full responsibility and liability for compliance with all applicable Federal, State, and local regulations pertaining to the protection of workers, visitors to the site, and persons occupying areas adjacent to the site, including the provisions of 29CFR1910 and 29CFR1926 of the Code of Federal Regulations. The Contractor shall hold harmless the Government for failure to comply with any applicable safety or health regulations on the part of himself, his employees, or his subcontractors.
The Contractor shall determine current salvage and waste handling, transportation, and regulations for the work site and for each recycling facility and waste disposal landfill. The Contractor must comply fully with these regulations and all U.S. Department of Transportation, EPA, state and local requirements.
B. Temporary Facilities and Utilities
• The Contractor will be responsible for water and temporary restroom facilities.
• The Contractor shall provide temporary utilities required to execute demolition.
• Water for demolition activities is available on site. Cross connection control is required when drawing water to portable containers or water trucks.
C. Utilities Termination / Demolition/ Removal
Sewer Service:
• Construction drawings indicate the sanitary sewer service is conveyed from the north side of building 121 by a 4-inch service line to a manhole approximately 70 feet north of the subject structure.
• Confined Space entry, if required, shall be conducted in accordance with 29CFR1910.146.
• The Contractor shall conduct flow tests from the existing structure to the manhole to verify service line positioning within the manhole.
• The Contractor shall plug the service line connection to the manhole with a non-shrink, cementitious material and abandon the sanitary sewer service line in place.
• Photographic documentation of finished work is required.
Electric Service:
• Construction drawings indicate high voltage electric service is conveyed underground from an electric vault located northeast of the structure to a pad mounted transformer located at the northeast corner of the structure.
• The Contractor shall coordinate with the Refuge Manager or his designated project leader for any electrical outages required for work performed on electrical distribution systems.
• The Contractor shall have a high voltage electrical crew verify electrical service is disconnected and deenergized at the service connection to the primary distribution system before commencing demolition activities.
• Primary electrical service shall be disconnected at the point of origination at the electrical distribution system.
• Conductor shall be removed from any below grade conduit and the raceways abandoned in place.
This includes conductors from the electrical distribution system to the transformer and from the transformer to the structure.
Water Service:
• Construction drawings indicate a 4-inch, fire water service line is conveyed from the northwest corner of the structure to the water main located approximately 70 feet north of building 121. An additional 2-inch water service line provides water for interior shower and bathroom facilities.
Each water service will require a separate excavation to access the connection to the water main.
The service line connection to the main is located beneath asphalt paving.
• The Contractor shall coordinate with the Refuge Manager or his designated project leader for any water outages required for work performed on water conveyance systems.
• The Contractor shall excavate the fire water service line and potable water service line at the point of the service connection to the main and cut and cap the service line as close to the water main as possible.
• Photographic documentation of process and finished work is required.
HVAC Units:
• Construction drawings indicate two HVAC units are positioned on the northeast and southeast corner of the structure.
• Prior to demolition of both HVAC units the Contractor shall perform recovery of refrigerant from the units. Both liquid and vapor recovery are required by a qualified HVAC technician.
• The Contractor shall attach recovery tags to the subject units indicating the date of recovery, type of refrigerant and the quantity recovered.
Natural Gas:
• Construction drawings indicate a natural gas service line is conveyed from the northwest corner of the structure to the gas main located approximately 70 feet north of building 121. The service line connection to the main is located beneath asphalt pavement.
• The Contractor shall coordinate with the Refuge Manager or his designated project leader for any natural gas outages required for work performed on conveyance systems.
• The Contractor shall notify Xcel of pending work. Work shall be performed by a contractor qualified and licensed to work on natural gas distribution systems.
• The existing service valve is not fully functioning and shall be removed prior to terminating and capping service at the main. Purging of the service line is required.
D. Final Acceptance
• Work will be considered complete after the Contractor has certified that all items have been removed and area and the project has been inspected.
• Contractor or the project supervisor shall coordinate with the Refuge Manager to perform the final inspection at least five (5) working days prior to the anticipated date of contract completion.
• Submit any regulatory acceptance documents, forms, licenses, and certifications to the personnel listed below.
III. Submittals
Provide all documents listed in the attached Submittals document to the following:
Distribution:
Deliverable Recipient Deliverables
Eddie Dunn, Project Manager edward_dunn@fws.gov 1 Electronic Copy of All Deliverables
Xxxxxxxxxxxx, Contracting Officer xxxxxxxx@fws.gov 1 Electronic Copy of All Deliverables
David Lucas, Refuge Manager
David_C_Lucas@fws.gov 1 Electronic Copy of All Deliverables
IV. Permits and Notifications
A. Contractor shall secure all necessary permits and licenses, pay all fees and taxes, and give notices necessary to perform the services of this contract.
B. Contractor shall secure all necessary permits and licenses required in conjunction with hauling and disposal, and provide timely notification of such actions, as may be required by federal, state, regional, and local authorities.
C. Government has NOT provided a thorough determination of all required permitting related to this contract. Contractor is solely responsible for the final determination of all required permitting associated with the work to be completed under this contract.
Page
Figure 1: Site Location
Figure 2: Site Plan
Comm Vault (Do Not Disturb)
PA Siren (Do Not Disturb)
Tree cover surrounding structure to remain
Figure 3: South Side of Building 121
Figure 4: North Side of Building 121
PA Siren (Do Not Disturb)
Natural Gas Regulator
Figure 6: East Side of Building 121
Figure 5: South Side of Building 121
Tree cover surrounding structure to remain
HVAC Units
Figure 7: Sanitary Sewer Manhole (North of Building 121)
T E V
-A'A I
TENTHR AVE w_
G' 6
2 u236 309 20 c
NIT C AVE. A
LOTILE SHE
w I-w
ARE A*(*! A
I' AD IKTR ' N
TOClKC.CT_ EIGHTH AVE. -,- A F'IFORPA
T2S 44 w 36 3$3A2SKEF4 RSSCIN
4 QUARTER, A"
S IL Ix T. H
STRUI CTUA
.1i .EAE I) m
OD
AVA
a2 OF 3 HVCPLNAD-IL
L-56th AVE. (FIFTH) ELE
CITI Of Dl ýAEA S'TRET R 67 W E 6~- EAL
AIRPORT G'
CT IW.0L%'. APSISSAL - ftI( , CC .jfADC MfPAUTW I ., I.( ANN, A,'" GENERAL SITE w'TAPPROVAL
IPOJC OR EXTEN97
EnierCrciet-lanr1iN4FTI
0 -- 7
OD m.- -C
EK 2,17,80 LO3 - -
E *~--t- - . - ..jaia
IL00
1,1Z-
-7O-) c- c)7 .C
- .7 T)
I L'C E,&J I Su i IN GCNE
S o -- { A-/ U E1ýA-\ssmArL T
AKI N MOO P00NGCHN218 [ h
IL L XSIGNW />
L3 -JJ
PULIG\ ARIGPRIGF
rv'~~B~ ING /ti [RN ri -~ J GG v ---- -/--
F_ 4"I I N
2., 18070 /V /TIMBER
13LD -H2 PEA.O SUGel -1 -ý A Ii i BUIL~~~~U~DING -FIHWLLF)I7I
Q - B"Sn6.
7~~ A <ofVessionTT
~1-- / I'AW
C, C)/
C ) C ~ L .- - -- --------
77-
Tut-r /ll r a i> x 7/ >>
-- ý4 --- --~ ~/
-4 0
~ N. >N~ -7 .7
F47
7L 7
AV
2 , 8 0 10 R A [04 A 4Ž ZU
4 14 1 1
D F45 5 44 5
L L
V I. ~EXISTINGNE
ii ASPHALT ASrtPH I A',.'/ T
PARKINGf I - NEW TP -
:17 HO 1 Ut Ill',' ' /BLDG I / ICLTE
H. Q ERING11
F / 44r'f [1Y (1 [ L' N /) BULDN
F z / P/PV
8 U I DI
.1F ,F F 44 Q
E 2,180,400 f L (~L y ~I-
I /-'4</ ~ T : f - --.- .1,0 e
P POLE 1NK C4-< 4- -. 7- (<c \//3 ~ IS I .. ~. 7 t N ~ . // IOWE
III~~ DOCUMENT tIl/A''
H J I IN
I L rV ---
HEAVY
'*4RRUN CON S N 'A
Ii~~ -. AB.-..'.--GW 44.
-- a SPn~
-- - -- - - ---. --I- ý-
94973
I q _wu' 30'? 7"___1-r 3'-t'1'-
IREFER TO SH. Aq FOR ENLARGED PLAN r2
I£ ELEVATIONS
Al A-
FQ~~~A AQlIRý0
[F. KE.Y). [i 102 j2~ 105]
10 0110, -t
Al AR Al4A
F-
~i 2'-02
Al_ __ I- llA
Al 2A2; AI -- A-- Al AI I
25 -(w2'
OFSHE METAL LOKES
PTEAB BE CURTEHE 2m c- w 1HE
DOWNLLE SPOU METli WAL PAEL-PEFN
DOORT &RME-PANL 2 EA
SHEE MEA/RFBICTD2(01
DOW SPOU
111-1I11-'
- -- 4 ALUMINUM FRAMTED -
WINDOW & INFILL PANEL SOUTH ELEVATION ES LVTO
W/GLASS 'A' SCALE 1/8"-! '-(1"
Al A3
____________ ~ELEV. _ _ _ _ _ _
F-111 '-8
- - - I- - -10
4 4
NORTH ELEVATION WS LVTO
ScALE:181SCL:/3' -'
A Profes n oprto HSDAIGI
THARPRYO
ROO 0M F IN I SH SCHEDULE _______ __ ____DOO & HADW R
RM NM OT ALEAST WALL SOUJTH WALL WEST WALL F LOOR B A SE T RI M CE ILING CE I LING DOOKSR 000R DAT R
NOýIMTFINMTF IN MAT F IN MAT F iN MAT F IN MAT FIN MAT F IN MAT F IN F T I N ~ 0RE N 'TP R Y
SEALER & 411 100 1 307001PIT----------
100 MECHANICAL GWB-1 PAINT GWB-2 PAINT GWB-2 PAINT GWB-1 PAINT CONC. {HRENE RESIL. CLEAN METAL PAINT EXPOSED - - - VA IES101113070D- PAN-------Fi
SEALER & 4" 102 1 3 - AN---------
11VSIUE GWB-i PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT CONC. ýHARDENER RESIL. CLEAN METAL PAINT GWB PAINT 8 01 101 103 130700- PAN-------F-
WOMENS tSEALER & RESIL. CLEAN METAL TOILET PARTITIONS 10'4 1307003PAN --- F2 102 RETOMGWB-1 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT CONC. HRER 6"METAL PAINT GWB PAINT 8 0 -PREFIN.; ACCESSORIES- 102 1523 - AN B -
RES106O 2HREE 3 0RFN 70 0--2AIT-' - -
12SEALER & RE06L CLA
L2 OCKERN. GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT CONC. HARDENE 6"A --- GWB PAINT 8 0 WOOD BENCHES-PREFIN. 102A 10 - AN--------- WOMENS * * * * SEALE & RESIL. LEAN * PREORMED SHOWER BASE 107A 2 3J 70D- PAN-------F-
10 SO SSAE EI.CEN ------ GWB PAINT 8 c &ECOUEPREFIN. 028- 10 - AN--------- ERGWB-2 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT CONC. HARDENER 6"1 *ECOSR 102B._ 108__ 1__
WOESSEALER & RESIL. CLEAN METAL TOILETCPARTITI ONS 109 2070D- PAN'B -- Fi 13RESTROOM GWB-1 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT CONC. HARDENER 6"1 METAL PAINT GWB PAINT 8 0_ -PREFIN..; ACCESSURIES 103 10230700- PAN'B --- F2
UISXSHEET RESIL. CLEAN 111 1I~ -IPIT---------
14HANDICAP GWB-2 PA INT GWB-2 PAINT GWB 2 PAINT GWB-2 PAINT VINYL CLEAN 6"1 METAL PAINT GWB PAINT 8 0 ACCESSORIES-PREFIN. 104 112 1 307003PIT --- fl -RESTROOM n111 3 7D- PAN-------F-
15VSIUE GWB-1 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT VCT CLEAN REI.CLEAN METAL PAINT ACST-1 PREFIN. 9 0 105 i13 13F2 GLASS'A' CLEAN RES___ I__ _ _ L.__ __ 1__ _ 1___ 114___ 1__ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - A N
106 COAT ROOM GWB-1 PAINT GWB-2 PAINT - - - - - - GWB-2 PAINT VCT CLEAN RES1L CLEAN---------ACST-1 PREFIN. 8 0 106 -1 01 - -
RESIL.__ __ __ 116 -
107 STORAGE GWB-1 PAINT GWB-1 PAINT GWB-1 PAINT GWB-2 PAINT CONC. HEARDEER RESIL CLEAN METAL PAINT ACST-1 PREFIN. 8 0 107 16
GB1 PITGWB-1 PAINT 411 METAL PAINT GWB PAINT 9 7
108 LUNCH ROOM GWB-i'A PAINT GWB-2 PAINT GLASS'A' CLEAN GWB-2 PAINT VCT CLEAN RESIL. CLEAN ALUM. CLEAN ACST-1 PREFIN. VARIEJ CASEWORK-L.P.M. 108 DOO 0R TYE
411 ACST-1 PREFIN. 8 0o0 109 CONCESSIONS -- -- -- ------ GWB-2 PAINT VCT CLEAN RESIL. LEAN -------------- GWB PAINT 9 7100
109A KITCHEN - - - - - - GWB-2 PAINT GWB-1 PAINT GWB-2 PAINT VCT CLEAN RESIL. CLEAN -------------- ACST-1 PREFIN. 8 0 109A I 9j 7
GLASS'A' CLEAN 41 CLA EA-AIT4S- REI. 901
110~ VESTIBULE GWB-2 PAINT GWB-2 PAINT GWB-1 PAINT GWB-2 PAINT VCT CLEAN RE4L CLEAN METAL PAINT ACST-1 PREFIN. 9 0 110A D 1/'t -
GWB-1 PAINT GWB-1 PAINT 4"IL 1 -/4
11A CORRIDORM GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT VCT CLEAN RE sIL. CLEAN METAL PAINT ACST- PREFIN. 8 0 ]1]O 7-
ISSUENITRS. GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT VCT CLEAN R4IL CLEAN_ MEA AN-1:PRFN O EVIEBSN1214Q ROOM_ RESI L 2'-0" MOPSTRIP-PREFIN. 12q c
112 JANRITORS GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT VOCT CLREANE RESIL . CLEAN METAL PAINT ACST- PREIN. 8 0 MO1ERIEBAI3
SEALER &113113 CORRIDORE GWB-2 PAINT GWB-2 PAINT GWB-1 PAINT GWB-2 PAINT CONC. SEALER &LA 6"A AN GBPIT8 1
____HADEE REIL CLA METALT PAINTINS GW PAINTID
11 M ENSTBLGW 2PANGW-PANGW-PIT GWB-2 PAINT CN.SEALER & 6qLA lMT
115 RESTROOM GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT CONC. SAREALER & 6" LEA METAL PAINT GWB PAINT 8 CMETALOILETPARTITIONS, *1 sou coH UHOLO MTA
116_ RESTRO GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT GWB-2 PAINT CONC. SEALER & RESI IL- CLEAN METAL PAINT GWB PAINT 8 0 ACCESSORIES-PREFIN. 116HOLWMTLFAELVTINCED
N ENS * SEALER £ RESI IL. CLA*------GBPIT8 *PREFORMED SHOWER BASEINULP
117 SHWRGWB-2 PAINT * GWB-2 PAINT * GWB-2 PAINT * GWB-2 PAINT *CONC. HADNR 6' CLA*--------W PAN& ENCLOSURE-PREFIN. 1
SHOWER__ HARDENER_____ ___ ACCESSORIES-PREFN.
i&FESGB- AN WB2 PIT GB- AN Wr1PITHRDEE CLEAN -------------- GWB PAINT 9 0 WOOD BENCHES-PREFIN. 18 .
LOCKER RN. GB2 PITGM2 PIT GW- AN W- AN OC.RHRE ER 6"
GWB-2
TRIM W/SEALANT 2"VRE " " 6-"2
GWB-1 I-
BATT INSULATION
PREFABRICATED
METAL WALL PANELS
(I> TYPICAL GWB-2
A1IA2 TO GWB-1 JOINT D5ETAIL
A Professo
THS [AWNG I
94973
SHOWER CURTAIN
11 K5 T]IFO9
- RESIL. BASE (6") RESIL. BASE ('4")
~-- -4METAL TOILET PARTITIONI
4 ~~-PREFIN. Al 1A3SCL 1/tli0T
PREFABRICATED SHOWER A3
BASE & ENCLOSURE
-PREFIN.
PREFABRICATED IDCTSLMT
METAL FASCIA - F INDIATE LICKITS
GUTTER-PREFIN. TO BE FURNISHED &
PREFABRICATED ISALDB M
METAL ROOF -WOOD BENCHES 10
PANEL-PREF IN. -PREFIN.
10 7/8'BATT
ELEV.
ELEV.
1 1O-'4"SUSPENDED
SHEET METAL 812SA NTSHEET METAL
DRIP GUTTER-~
-PREFIN.PRE IN
SEALANT--- SUSSEALANT
TL A TC ZBOTH SIDES _ ____
BATI
PREFPREFABRICATED
- PREABRIATEDMETAL WALL
MEA ALPANEL-PREF IN.
_____PANEL-PREFIN. 0
~C)HO LLOWL.PM
/ I IMETAL FRAME
/ALUMINUM FRAMED \0~ 00DOOR AJ
HOLLOW iMETAL--/ WINDOW & INFILL SHLE
FRAME &DOOR PANEL W/GLASS 'A'
- PA INT EI.BS
ALUMIMUM
SILL TRIMI
/-SEALANT
RESIL. ALUMINUM BOTH SIDESj BASE THRES:iOLD 1
8'X8'X 6" Cqý)CRETE STOOP AljAICL: /~t1'o co-- -AO #4l CONT.
ELEV. ____ELEVI . - -..
Lfl
AC
6"' CAPILLAR - - - #6 SMOOFH DOWELS -
WATER BARRIER 4"1 CONCRETE p@1 101 O.C 8 ________
3/8" EX 'PANSiON _________
21'2 01VAPOR JOINT i'-S'g BASE-Irj~8~i~6 T PRMTRBARRIER 21"X2'O j -011'
INUAINPERIMETER B<CSWR
6" CAPILLARY INSULATIONA? R.N.0A
WATER BARRIER _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
IAPA
Aý Profe siona Corporatio THI DRAWING
/_7
949;.
A4 A3 DW PU
100-1 103ý0 0 108 107 /WCN.SLS
BLOC
_170---I I
L
A41_ _ _ A3_ F U
L8
T- -IA
AROO LINE7
k I
113- l::
LEGEND
REFLECTED CEILING PLANN
SUSPENDED 'I
GOW
2X'4 SUSPENDED
ACOUSTICAL TILE (ACST-1)
ROOM NUMBER R B O K- _ _ _
RECESSED PREFORMED SOE
F~1 FLUORESCENT ENCLOSURE,BAE7
LIGHTFIXTURE CURTAIN & RO
SURFACE OR PENDANT
LYITZ~iMOUNTED FLUORESCENT
LIGHT FIXTURE
~ RETURN AIR GRILLE
OR EXHAUST GRILLE
18''X011 MIRROElj SUPPLY GRILLE W/SHELF
WALL EXTENDINGSOPDSEER
___18''X30'' MIRROR_ q" ABOVE FINISH CEILING LINEW/SHELF UNDERSIDER OFLL ROOF DEC
SOAP DISPENSER UDRIEO OFDC
___METAL TOILET 18''X30O MIRROR EETIPARTIT IONS W/SHELF HAND DRYER __
--- ROBE HOOK SOAP DISPENSER - - -ýI8'3'
PREFORMED MRO
SHOWER ENCLOSURE, BASE
/ffz CURTAIN & ROD -- SADIPNE
- / / ~GRAB BAR E L R E
KELECT. F(DJ. TOILET PAPER
IHHAND DI. HOLDERDRYERL/
HOLDER\ -- 6''RESI-
2o B Zs - A Pro'zx Zt C A 47 Hý A ý I -- ,J
Rm. I1O I Iit 2(T~l10 B ry O I I k lý' 'JO 1 1 -ý
H ý '0
BASE
125'-O"'
40 25'-0" 25'-0" 25*-0" 259-0" 251-06
Ls-
06 I*IRPIN, TYP.
4'
C44 ok7
,- 3FYGS 3'-rl'x3'-0"xlr' 3 cuss0"3-0X~l!
W/3-4 EA. MYv FTG-S '.'-ollX4'-r'IxlrWs5-#5E.VVW/4sA
FOOTING 8k FOUNDATION PLAN SCALE: 1/S" aC-O"
AR SI
NOT$P KOToS ve5 ýE C-,.. Cr.7 CoV~W ' ~-0 C Z-..p(Foa1 C.ONI' r>I~~EG rS
(SEEý I~ )I-_____ ~ 4N ý,g)f IY 4 '&
L _ _r
LU L U
L~~~~~ -::J4W-*P P
7fl~~~W V 5 ~;~ - *u aJ~cgg
7-' -""F Lyr 90 'LA' ^4&t. w o~ o oIo &'JEcc
IF LOOK.
45.AS \V
VI L RC . LS -5 'A4arJ" A T , IN I E W L , - 1 " VE T B C I T A L N P I
4 " Y 44£U R I G
2, (O 3. 'FRIG
A] AE1/ CONTINUOUS WASTE AND F-TRAP FOR SINKS. P
'oZ611/2" W AND 1/2" HW DOWN.
4 - 1-112" VENT DOWN, 3" WASTE.
- ~ ..L2 I-- :'j1-1/2" VENT AND 3/4" Cw DOWN, 2* WASTE.
-Fr s-I >~' ~ 2" VENT AND I" LW DOWN, 4" WASTE.
Ls121 W AND 1/2" HW, 2" W -CVKV> -L -3g-FV1 1/2" LW AND 1-1/4" VENT.
A-I 1-1/12" VENT, 2" WASTE -WOtA F:0 OR bI>O.
4'.-v~~~ ~~ -- 4 6P \AC1 W 2 " V, 4Is
L ?-~ 3/14" LW, 3/4" i-4, 1-112" V DOWN, 2' WASTE$,*/4A" l4c w/
L~- F A, -AV,
1. 1- W A. 3/4"' LW DOWN.
li- fI -3*
-4v-4
I~~~1 L.ýt -0-- --n A R1 IAP
Be,, U e 45 IA Iý IL T F -I
C)It." AFF w4oc;PAiLA T V r
5TRUC OR-[ Id'Xd ?zMOUNT TO WALL CrM) z~q9ki 4
.0s WSAIe
IO J to o 10K 8 lei$-L X.AS Is. I ----O~ /N~ Ito.~
2-. i to~o ALA 4;0 Z'WOS FSjo&. -II IiJ za I '7 CFC -7 (oov dtJ) 0 #.a. aXi2ee
3.~~~~~~~~~F WorO ceoFt ROIQ-.&...RQWCJF S~~~AL~~~L~~ ýErfr-fliAL eWkJI4e.eLLEe
ARIK.ý-_ AAD S OT7
WVACT EXCEPT By
GreeýAey Cot ado 1G1BMNT0T14 and Fcio Cot E: SAI AOAE
9Z~r,-AýRirverton WycPnng
4:oHALýLý~~~~~~~~~Prv UtahI, ý Q e: Eýc7crAIZ 0A
FURNACE SCHEDULE Ia
DD RMHEATING ES- COOLING - R-22 DX
UNIT MANUFACTURER'S ESP or or ELECTRI- VENT MH B T~~ET ET LT S OLMDLACCESSORIES NO. LOCATION NAME 16 MODEL NO. CFM IN. H2 0 HP BD) SPEED CALL DATA SIZE FUE IPU OUTPU OUTPUTs EAT EAT NA O.L MODEL__________
FUEL INPT OTPUTOUTUTIDB B QB IN.Hý) NO REMARKS
F-1 1017 LEPNWOXGrGQ% -100 150 .170 I/i Ht4H iO' to in 1o 1'00 -7 5c, e 0.151 CIG-4IFF
F-1 90-14 iscq Ics olog~ I4ov.1 31 N4cg 100 -76 C-10> -B +1~ 03CI- IFF
1K COOLED CýONDENSING UNA] SC~hruU L E
UNIT SERVES MANUFACTURER S SUCTION TEPARTM.PIPE SIZE COND. COMP. ELECTRICAL OPRATIN G U w T S LOCATION ITON S C. F. M. E _TET.__D R EF. - -FAN HI . AT REMARK P1(5 GO
NO0. NO0. DESIGNATION T EMP. EVP.MII AX.SUCTIO7N LIQUID H.P HI AA W JH
Cu- I F:-l g11oUMio0-7 LSNS4OX HSIG,-"IV 3 /31 7.0 t .2 78-/8 1/6 Az 1.w0ý 200eV, 10 szA wM L*JEr a&Tl 25 L4.Ss
Cj- t F-?2 OUSI 101 3,j 20f7*0 t-2i 7/0 v 1/6 z1i9 A 2flV, 'F K4z *J.CTh ZSO5L.SS@ t 37 18, 10 T ODDLA
UNIT HEATER & MAKE-UP AIR UNIT SCHEDULE____ ___________________
UNIT NO. ' LOCATION MFR'S NAME AND C FM ESP F AN DorRP M ELECTRICAL HEATING {MBH) IACCESSORIES AND M- tMODEL NO- {N.H2OjHP BDDATA F{UEL INU OUTPUT IREMARKS
Q.E t 10 ZZNORZ C,)gE itS 14400 0 '0 I, C0 D~ 2-08 Pflt Z00 rPf aNTD
LOUVER SCHEDULE___
NO. MAKE & MODEL. NO. LOCATION I SERVIC PO ICF M CONSTRUCT. FINISH & ACC..
ff14A U100-i
Il m t o24 E iX. Aa qbT .02 16 0 0IN -~ 6 L-2 WIW 10 A24 1II4TAICS .v5 ~,oo .~/
L5 K~~~PM 101 K2 ITAKE *L~ s ~ ~ K
9z RN) 100 ZA"'. e:, G,&ýAS AR - - AL-u.NI -.a
-7#qo4or / F..4.. Z E~ K-A0'oQ IZf OAMPI -l -f Q._ _ _ _ __________
Cý0ý0Z*Y ARCH.
GRILLE, REGISTER & DIFFUSER SCHEDULE
TYPE MANUFACTURERS8 DUTY CONTROL CONSTRUCTION FRAME FINISH rCMARKS
.4. DESIGNATION SONTRL8T TLIE
5Wsr1 Titik,3ooAL. - 45 DSPLaNT 001 %kAL Omp STSL- S41flC MT. WNI TOL
Co-i TijTJ4rwo W- 9-W L'-4 i
AD- TILb~ A C E I- P& OSO Ai-I-AMINLdIM SAJWFM-E MT. \h/MITt afE' TITLISo PA~R -_AA C*.IL-INqd C7 bo A..MNJP',A1: s.A-AOE N/- \tdb4TS pt- rilrJ-&P~m AACAD L-4N OWl 16: ALLdIMIPJim t13dfltrpa MT \WHiTE
R-2.L TITJ% PAAq - AA LJPV Ie AUJý4 N4M IA M \Ii.J WiTW ( s~WR-iI TrITLIt. 2-OS. S 60WALJ. A&hJEFACZ qUpfamt. oWHITEf
2.% RL-So RtwrLIMN tTS
1. 24-'X Z4-' FA4E -Sil~r, era PtL.A~c* ,..R NORMc K---ZAK
Z.. te sý YI&G F:ACX-a _:lzP-, 'SEs Pt.&N .. r-4 uc 1`11C.K a--4 a
2"x 12" FActr SIlKz, Setw PLA*Js r.K 1-14w2K SJzW
POWER ROOF VENTILATOR & EXHAUST FAN SCHEDULE
F U IT LO A INsMAC U E ' F P. T.S. SORES RPM HP E f T IA CU BREMARKS
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _AP R
SF- I WPFA 100 L,4KOR U C ~w leKc I,--A Is_ __
THEw V ~ o / 0 a v
PROPERTY O
ar, ___
FIA_______________ RIADI O
TELEPHONE TERIIINAL BOARD, TTB
IS LOCATED NEXT TO PANELNO SH N I LN.______
00e
PANE L L2 4 L-1
L 25-7-29 CUU
SCALE 18 =I'02
LN% -3
UGI{JING65 3lTU Tpa~~~~~ ~~~ AA am oaitbfa0-wtpmtHrsaw
4r" -
EPPERIc+ w*~~~~i pcilbo
K~ KlU n L-11/3 6.I/ 1iis
AeI Tp12 F R FUSIBLE~a iamsn ~ r t .u U n m usw~a.~ F~ as e 4 S a aimsw~Omim22ma2a sew esta tu r4cw~fe Iupo.Ipi DayMb 124
________________________________________________ WO ( pmr20,22MMCU2h L-26.2 ATIL-19TW UtS l
TpmL ~t~4 tStitaumt fl ib at iem sw ee VM M MD hSSSf..MAEUfi _______________PLAN___ mao .rr ou0r --
ISO/=$ VOLT.d AGNEMEN 4-1WTH w________________________________________ TV*~ A.f~tn ~C~ta SAID bCOANY.m t Dtlif tiM arila flumanon.o yomrIMNg nj ndm Mm Prde anIUtulic MOU FE MWKB
| 09 RMA Building 121 Demolition SOW Final |
| Building 121 Plans - RMA |
File details come from the government source that posted it. Updated .