Attachment 4 Receipt Inspection Report.docx
DOCX document 21 KB Posted
- Attached to
- Reidville Hydraulics and Manufacturing, Inc. Thin Line Towed Array Federal contract opportunity
- Solicitation number
- N66604-21-Q-0068
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Combined Synopsis Solicitation.docx | DOCX document | |
| Attachment 2 Provision 52.204-24 and Clause 52.204-25.pdf | ||
| Attachment 3 Vendor Information Request.docx | DOCX document | |
| Attachment 5 CDRLs A001-A005 Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J:\LIBRARY\FORMS
FORM REV. 06/08/2009
TAHE FACILITY
NETC, BLDG. 6
NEWPORT, RI 02841
TAHE FACILITY QUALITY PROVISIONS
RECEIPT INSPECTION REPORT
PART NUMBER / DRAWING NUMBER
6878807-1, 6878807-2, 700-2800-001, 700-3000-001
REV
PART NOMENCLATURE
OA-9070 Stub Shafts & MOK Kits
SOURCE:
S/N:
CONTRACT:
N66604-
| PURCHASE ORDER: |
| PURCHASE REQUEST: |
| WORK ORDER: |
W03565
| OUTSIDE SERVICES SOW: |
| TRAVELER: |
QTY RECEIVED
SAMPLE SIZE**
AQL
CHARACTERISTIC MEASURED / VERIFIED
FINDINGS
ACCEPT REJECT
DISPOSITION-REMARKS
THE FOLLOWING QUALITY DOCUMENTATION / INFORMATION / INSTRUCTIONS MUST BE PROVIDED / ADHERED TO:
QTY: 2, P/N: 6878807-1
QTY: 2, P/N: 6878807-2
QTY: 6, P/N: 700-2800-001
QTY: 6, P/N: 700-3000-001
Certificate of Compliance that items were manufactured in accordance with all applicable instructions and specifications
Required
(A001)
Mercury Free Statement: Document on company letter head, signed by responsible company official, certifying that mercury and mercury containing compounds were not intentionally added to nor allowed to come in contact with parts, hardware, or supplies furnished under this Work Order.
Required
(A002)
Domestically Sourced Material: All raw material must be sourced domestically in compliance with DFARS Part 225: Foreign Acquisition.
Required
Product Identification must be in accordance with attached drawings/documentation. If not specified, then identification must appear on external surfaces of items or packages. (Military Specifications will be provided upon request)
Required – Mark Stub Shaft part number IAW Note 10 of drawing 6878807.
Certificate of Analysis of Raw Material stating that it meets the specifications identified
Required – Raw material must be IAW Notes 3 and 4 of drawing 6878807.
Required – Provide Certificate of Analysis for welding rods utilized for production.
(A003)
Inspection is required by the vendor
Required - Document all measured part dimensions and compare to required dimensions per drawing.
Process Certification that items were manufactured in accordance with special processes identified i.e., Welding, Post Weld Anneal, Painting
Required – Welding Weld IAW S9074-AR-GIB-010/278. Reference Note 5 of drawing 6878807.
Note: Provided vendor documentation shall reference applicable Weld Procedure Specification (WPS) for each unique tactical weld joint.
(A004)
Special packaging requirements
Required - Package to protect part features during shipping and handling.
Test data to be provided
Required – Provide NDE Visual Test (VT) & Liquid Penetrant Test (PT) document confirmation for all welds. Reference Note 6 of drawing 6878807.
Note: Verify “PT” stamp adjacent to each tactical weld.
(A005)
First Article Inspection required
Not Required
TAHEF Incoming Inspection
Required
SPECIAL INSTRUCTIONS/REMARKS/ENCLOSURES
6878807_53711_FN_-_D08-052
VIR_W03565, RIR_QAP_W03565
**SAMPLING PERFORMED IN ACCORDANCE WITH ANSI/ASQZ1.4 GENERAL INSPECTION LEVEL II
TOTAL ACCEPTED
TOTAL REJECTED
INSPECTOR
DATE
REV. 06/08/2009