Attachment 3 Vendor Information Request.docx
DOCX document 31 KB Posted
- Attached to
- Reidville Hydraulics and Manufacturing, Inc. Thin Line Towed Array Federal contract opportunity
- Solicitation number
- N66604-21-Q-0068
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 Provision 52.204-24 and Clause 52.204-25.pdf | ||
| Attachment 5 CDRLs A001-A005 Redacted.pdf | ||
| Attachment 1 Combined Synopsis Solicitation.docx | DOCX document | |
| Attachment 4 Receipt Inspection Report.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
J:\LIBRARY\FORMS
| NUWCDIVNPT TAHE FACILITY | FAX 401.832.3937 |
| NUWC, BLDG 6 NEWPORT, RI 02841 | PHONE 401.832.3068 |
(REFER TO INSTRUCTIONS)
| VENDOR INFORMATION REQUEST |
| 1. VIR NO.: |
2. SUPPLIER NAME AND ADDRESS
3. DATE
4. DATE DISPOSITION REQUIRED
5. MATERIAL NOMENCLATURE6. WORK ORDER #
W03565
7. PART NUMBER
8. QUANTITY
9. SERIAL NUMBER
10. STATUS OF PART |_| NOT STARTED |_| IN-PROCESS |_| COMPLETED
11. DESCRIPTION:
12. CAUSE OF NONCONFORMANCE:
13. RECOMMENDED CORRECTIVE ACTION:
14. RECOMMENDED DISPOSITION:
15. TECHNICAL JUSTIFICATION AND PURCHASER'S BENEFIT:
REPAIR COST:
REPLACEMENT COST:
16. DELIVERY IMPACT
IF DISAPPROVED, DELIVERY WILL BE: IF APPROVED, DELIVERY WILL BE:
THE VENDOR ACCEPTS FULL
RESPONSIBILITY FOR THE
CORRECTNESS OF INFORMATION
AFFECTING THE ABOVE PARTS
17. REPORTED BY:
SIGNATURE:
PHONE:
VENDOR: PLEASE DO NOT WRITE BELOW THIS LINE
| 18. QA POC |
| 19. DATE VIR RECEIVED |
20. DISPOSITION
|_| APPROVED |_| DISAPPROVED |_| CONDITIONALLY APPROVED
| NC# |
| SOW# |
| WO# W03565 |
BELOW SPACE IS FOR FINAL DISPOSITION AUTHORIZATION USE ONLY:
21. DISPOSITION RESULTS
RFD # |_|YES |_| NO
NAVSEA APPROVAL REQUIRED |_|YES |_| NO
RPR # |_|YES |_| NO
ISEA/TDA APPROVAL REQ’D |_|YES |_| NO
MINOR |_|YES |_| NO
MAJOR |_|YES |_| NO
COST IMPACT |_|YES |_| NO
SCHEDULE IMPACT |_|YES |_| NO
PART NUMBER IMPACT |_|YES |_| NO
APPROVALS
22. ENGINEERING DATE
23. QA DATE
24 TAHEF MANAGER DATE
25. ISEA or TDA DATE
26. DISPOSITION SENT TO SUPPLIER
BY PURCHASING:
DATE:
NOTICE TO SUPPLIER: THE DISPOSITION OUTLINED ABOVE IS APPLICABLE TO THE MATERIAL ON THIS VIR ONLY. SHIPPING DOCUMENTS FOR THIS MATERIAL MUST REFERENCE THIS VIR.
| NUWCDIVNPT TAHE FACILITY | FAX 401.832.3937 |
| NUWC, BLDG 6 NEWPORT, RI 02841 | PHONE 401.832.3068 |
VENDOR INFORMATION REQUEST FORM INSTRUCTIONS
A PROPERLY APPROVED VENDOR INFORMATION REQUEST (VIR) IS REQUIRED TO RESOLVE TECHNICAL QUESTIONS OR PROBLEMS INVOLVING TOWED ARRAY HANDLING EQUIPMENT FACILITY WORK ORDERS.
TO FACILITATE THE PREPARATION OF THE FORM, A BRIEF DESCRIPTION APPEARS BELOW INDICATING THE INFORMATION REQUIRED TO BE ENTERED IN THE APPROPRIATE BLOCK. IF MULTIPLE PAGES ARE REQUIRED, LINK ADDITIONAL PAGES BY BLOCK NUMBER TO THE FIRST PAGE.
BLOCK NO. ENTRY (BLOCKS 2-16 TO BE FILLED IN BY VENDOR)
(BLOCKS 1, 17-25 TO BE FILLED IN BY TAHE FACILITY)
1. REFER TO THIS NUMBER (PROVIDED BY THE TOWED ARRAY FACILITY) ON ANY INQUIRY. RECORD THIS NUMBER ON THE PACKING LIST PRIOR TO SHIPPING.
2. ENTER YOUR FULL MAILING ADDRESS, INCLUDING THE NAME OF ANYONE TO WHOM THE RETURNED VIR SHOULD BE SENT.
3. THE DATE THE ENTRIES ARE BEING MADE.
4. GIVE DATE A REPLY TO THE VIR IS REQUIRED BY IN ORDER TO AVOID DELAY OF DELIVERY.
5. A GENERAL DESCRIPTION OF THE PART NAME THAT APPEARS ON THE PURCHASE ORDER.
6. WORK ORDER #
7. PART NUMBER
8. QUANTITY OF PIECES AFFECTED BY VIR (NOT QUANTITY ORDERED).
9. SERIAL NUMBER OF PIECE AFFECTED, WHERE APPLICABLE.
10. CHECK APPROPRIATE PART STATUS BLOCK.
11. DESCRIBE THE SPECIFIC PROBLEM/QUESTION/PROPOSED CHANGE, OR NONCONFORMANCE IN DETAIL
· INDICATE WHAT, IF ANYTHING, HAS BEEN VIOLATED
· WHEN PROPOSING A MATERIAL SUBSTITUTION, INCLUDE A FULL DESCRIPTION OF THE SUBSTITUTE MATERIAL (I.E.: ALLOY, CLASS, CONDITION OR TEMPER, SPECIFICATION, ETC.). ATTACH A COPY OF THE TEST REPORT FOR THE MATERIAL IF AVAILABLE OR WITH THE SHIPMENT OF THE COMPLETED HARDWARE.
· WHEN REPORTING A NONCONFORMANCE INVOLVING THE HEAT TREATMENT OF MATERIAL, A COPY OF THE APPLICABLE HEAT TREATMENT PROCEDURE USED SHOULD BE ATTACHED.
· WHEN REPORTING CHEMICAL AND MECHANICAL NONCONFORMANCE, ATTACH A COPY OF THE TEST REPORT APPLICABLE LISTING BOTH CHEMICAL AND MECHANICAL TEST RESULTS OF THE MATERIAL.
· USE A CONTINUATION OR SKETCH SHEET IF THIS SPACE IS INADEQUATE TO SHOW A SKETCH OR TO FULLY DESCRIBE THE PROBLEM.
12. INCLUDE THE CAUSE OF THE NONCONFORMANCE
13. INDICATE THE RECOMMENDED CORRECTIVE ACTION
14. INDICATE THE RECOMMENDED DISPOSITION
15. INCLUDE THE TECHNICAL JUSTIFICATION FOR ACCEPTING PERMANENT NONCONFORMANCE
BY INDICATING THE EFFECT OF THE DEVIATION ON THE FORM, FIT OR FUNCTION OF THE
MATERIAL, PART OR COMPONENT. IF UNABLE TO PROVIDE TECHNICAL JUSTIFICATION, SO
STATE. ALSO PROVIDE RATIONALE FOR PERCEIVED BENEFIT TO PURCHASER. FOR OUTSIDE
SERVICES INCLUDE REPAIR VS REPLACEMENT COST.
16. INDICATE THE DELIVERY IMPACT IF ACCEPTANCE OF THE REQUEST IS NOT GRANTED.
17. GIVE NAME OF PERSON TO CONTACT IN CASE OF ANY QUESTIONS REGARDING VIR.
18. FAX VIR to (401) 832-3937, to the attention of the Quality Assurance Department. QA Point Of Contact phone number is (401) 832-3068.
19. ENTER DATE VIR RECEIVED FROM VENDOR.
20. ENGINEERING, QA, AND MANAGEMENT ENTER REQUIRED INFORMATION.
21. ENGINEERING, QA, AND MANAGEMENT MARK EACH BLOCK AS APPLICABLE.
22– 25. APPROVALS AS REQUIRED.
26. PURCHASING: SIGN AND DATE WHEN COMPLETED VIR IS SENT TO SUPPLIER.
Revision Date 7/21/16
File details come from the government source that posted it. Updated .