Attachment 4 - MAHG211116 Remove Rubber MSS.xls

XLS spreadsheet 49 KB Posted

Attached to
Remove Rubber from Airfield and Centerline Federal contract opportunity
Solicitation number
FA301022R0014
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

MAHG211116Project Title:
Remove Rubber from AirfieldSolicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies Required (if not electronically submitted)Remarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationWarranty-Manufacturer and/or WorkmanshipCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1HazMat Questionnaire15 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
2HazMat MSDS15 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
3Hazmat Reporting Entry Form15 Days Prior to Start DateProvide the documents as required per the Environmental packet provided by Keesler AFB.
4Recycling and Landfill Report11End of ContractProvide the documents as required per the Environmental packet provided by Keesler AFB.
5Warranty (Manufacturer's)1End of Contract
61-Year Warranty (Contractor)1End of Contract
7Project Schedule, SOW section 3.3.A110 Days following NTP
8List of construction equipment (item name and description, SOW Section 3.3.1.A, 3.3.2.A.110 Days following NTP
9Pavement Paint (including Material Safety Data Sheets and product description) for color proposed for use, SOW Section 3.3.2.A, 3.3.2.B111110 Days following NTP
10Reflective media (glass beads), SOW Section 3.3.2.B.1 &2, 3.3.2.C.11110 Days following NTP
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)