| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA301022R00140001 SF 30.pdf | ||
| Attachment 11 - Questions and Answers.pdf | ||
| Site Visit Sign-In 1 Jun 22.pdf | ||
| Solicitation - FA301022R0014.pdf | ||
| Attachment 9 - Notice of Compliance.pdf | ||
| Attachment 5 - Wage Det MS20210050 25 Feb 2022.pdf | ||
| Attachment 6 - Past Performance Questionnaire.pdf | ||
| Attachment 10 - Submittal Procedures.pdf | ||
| Attachment 1 - MAHG211116 Remove Rubber from Airfield and Centerline SOW.docx | DOCX document | |
| Attachment 3 - MAHG211116 Remove Rubber SPECS rev1a.pdf | ||
| Attachment 2 - MAHG211116 Remove Rubber Drawings.pdf | ||
| Attachment 7 - Past Performance Reference List.pdf | ||
| Attachment 8 - SF 1444.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| MAHG211116 | Project Title: | |
| Remove Rubber from Airfield | Solicitation / Contract Number: |
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HazMat Questionnaire | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | ||||||||||||||||||
| 2 | HazMat MSDS | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | ||||||||||||||||||
| 3 | Hazmat Reporting Entry Form | 1 | 5 Days Prior to Start Date | Provide the documents as required per the Environmental packet provided by Keesler AFB. | ||||||||||||||||||
| 4 | Recycling and Landfill Report | 1 | 1 | End of Contract | Provide the documents as required per the Environmental packet provided by Keesler AFB. | |||||||||||||||||
| 5 | Warranty (Manufacturer's) | 1 | End of Contract | |||||||||||||||||||
| 6 | 1-Year Warranty (Contractor) | 1 | End of Contract | |||||||||||||||||||
| 7 | Project Schedule, SOW section 3.3.A | 1 | 10 Days following NTP | |||||||||||||||||||
| 8 | List of construction equipment (item name and description, SOW Section 3.3.1.A, 3.3.2.A. | 1 | 10 Days following NTP | |||||||||||||||||||
| 9 | Pavement Paint (including Material Safety Data Sheets and product description) for color proposed for use, SOW Section 3.3.2.A, 3.3.2.B | 1 | 1 | 1 | 1 | 10 Days following NTP | ||||||||||||||||
| 10 | Reflective media (glass beads), SOW Section 3.3.2.B.1 &2, 3.3.2.C. | 1 | 1 | 1 | 10 Days following NTP | |||||||||||||||||
| 10 | ||||||||||||||||||||||
| 11 | ||||||||||||||||||||||
| 12 | ||||||||||||||||||||||
| 13 | ||||||||||||||||||||||
| 14 | ||||||||||||||||||||||
| 15 | ||||||||||||||||||||||
| 16 | ||||||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .