ATTACHMENT 4 - Information required for USDA FDWSRU 1303 Biosafety Plan_djs.pdf

PDF 90 KB Posted

Attached to
Greenhouse Kneewall Repairs Federal contract opportunity
Solicitation number
12305B22R0017
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Northeast Area

View the file

Other files for this federal contract opportunity

Other files attached to Greenhouse Kneewall Repairs, newest first.
File Type Posted
Questions and Answers.docx DOCX document
SF30.pdf PDF
ATTACHMENT 3 - EXISTING CONDITION PHOTOS.pdf PDF
ATTACHMENT 2 - EXISTING DRAWINGS.pdf PDF
12305B22R0017.pdf PDF
ATTACHMENT 1 - Specification 01 01 00 General Conditions rev Dec 2020.pdf PDF
Wage Determination MD20220042 07082022.pdf PDF
SOW - GH1303 Kneewall Repairs 28JUN2022.pdf PDF
CertificationVaccinationPRAv7.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4

Heading: Include submitter name and contact info, contract name and number, etc as needed to identify project

Location Information Building: 1303 all rooms

Jo Anne Crouch, Research Leader 301-619-7339 Joanne.Crouch @usda.gov

Diana Sherman, Facility Manager 301-619-2878/240-772-2757 Diana.Sherman@usda.gov

Douglas Luster, Quarantine Officer 240-285-6763 Doug.Luster@usda.gov

Tracy Dickerson, Biosecurity Officer 240-888-8499 Tracy.Dickerson @usda.gov

Containment Biosafety Level (BSL) Assigned:

Insect Containment (no BSL) Building: 1303

Plant Pathogen Information

1. Quarantine plant pathogens under USDA APHIS PPQ permits. Various viral pathogens and insect vectors.

Non-infectious and no health issues for humans:

Bldg and Room Number Bldg 1303 Disinfectants 10% bleach, 70% ethanol

Biocontainment Safeguards Laboratory Facilities (Secondary Barriers) All non-essential personal clothing should be removed before entering the quarantine. Personal items are stored in provided bins. All personnel are required to wear coveralls, hair covering, over the shoe booties and, if applicable, beard covers while working within the Quarantine Facility; alternatively use of hooded/booted Tyvek suit may be used. Closed toe shoes are required. These items are stored in Change Room 301, equipped with 2 privacy changing stalls. Upon leaving coveralls, etc will be removed inside out and placed in a plastic bag. Excess air should be removed from this bag and then placed in the -30 freezer (for 72hours-date the bag) located in Change Room 301.

Disinfection, Decontamination of Equipment All tools, equipment etc. used inside bldg. 1303 containment barrier. Do not bring unnecessary items into facility.

Autoclave tools, decontaminate equipment using sterilant. Small tools sensitive to liquids may be insecticide vapor treated.

Emergency Notification Process

Quarantine Officer Douglas Luster 240-285-6763 Ft. Detrick Police/Security 301-619-7114 Emergency Medical Personnel 911

Hazard Communication All contractor staff entering bldg. 1303 will require Visitor Training and Pre-Entry Agreement signatures.

Location Information
Biocontainment Safeguards
Disinfection, Decontamination of Equipment
Emergency Notification Process
Hazard Communication

File details come from the government source that posted it. Updated .