Attachment 4 - Drawing 12546119_C.pdf

PDF 1 MB Posted

Attached to
APU Test Stand Federal contract opportunity
Solicitation number
W911KF-22-Q-0032
Issued by
Department of the Army Materiel Command Contracting Command Detroit Arsenal

About this file

This document contains an engineering drawing and parts list for an Auxiliary Power Unit installation, as well as details of a related federal contract opportunity.

The engineering drawing provides specifications for 13 parts needed for the APU installation, including insulation panels, screws, washers, and a ground strap. It lists applicable standards and notes regarding installation sequence, fuel line termination, and lifting requirements. The related federal contract opportunity is a solicitation to provide an APU test stand and associated equipment. Services required under the contract include revising an ATP for the APU, as well as providing a test stand assembly, duct tester, actuator tester, megohm meter, safety data sheets for hazardous materials, and other test equipment. The solicitation was issued by the Department of the Army Materiel Command Contracting Command Detroit Arsenal.

View the file

Other files for this federal contract opportunity

Other files attached to APU Test Stand, newest first.
File Type Posted
Attachment 6- Drawing 12546380_C.pdf PDF
Attachment 5- Drawing 12649297_B.pdf PDF
W911KF-22-Q-0032 Amendment 1.pdf PDF
Attachment 2 - Evidence of Authority To Sign Offers.pdf PDF
Attachment 3 - DD Form 1423 - APU Test Stand.pdf PDF
Attachment 1 - Statement of Work for APU Test Stand.pdf PDF
W911KF-22-Q-0032 Released.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1245678 3

A

E

G

H

F

D

C

1245678

A

E

B

G

H

F

D

C

C C

B B

D

D

E

E A

A

PARTS LIST

FIND

NO

QTY

CAGE

CODE

PART NUMBER DESCRIPTION SPECIFICATIONS NOTES

1 1 19207 12546380 AUXILIARY POWER UNIT ASSEMBLY

2 1 19207 12546195 INSULATION, APU,OUTER SPONSON

3 1 19207 12546196 INSULATION, APU,REAR SPONSON

4 1 19207 12570301 INSULATION, APU PANEL, RIGHT

5 1 19207 12570300 INSULATION, APU PANEL, FRONT

6 10 19207 12569613-20 WASHER, FLAT, 1/4

7 10 19207 12569621-3 SCREW, HEX HD, .250-20 x .500

8 6 19207 12569621-61 SCREW, HEX HD, .375-16 x 1.125

9 6 19207 12569613-3 WASHER, FLAT, 3/8

10 1 19207 12570400-21 GROUND STRAP

11 3 19207 12347656-1 WASHER, FLAT, 1/4

12 3 19207 12387152-3 SCREW, HEX HD, .250 x .500 LG

13 1 96906 MS9350-28 CLAMP, CUSHIONED LOOP - 1.812 MS9350

PART NO

NOTES:

1. APPLICABLE STANDARDS/SPECIFICATIONS:

A. ASME Y14.100

B. ASME Y14.5M-1994

2. UNLESS OTHERWISE SPECIFIED:

TOLERANCE ON IMPLIED 90 DEGREE ANGLES

TO BE �# 2 DEGREES

3. INSTALLATION AND REMOVAL OF APU WILL

REQUIRE LIFTING KIT 12284836(COMMANDER'S

WEAPON STATION LIFTING KIT)

4 BOLT INSTALLATION SEQUENCE SHALL BE 1,3,4,6,2,5

5. FOR PRODUCTION INSTALLATION WHEN UAAPU IN NOT

INSTALLED PERFORM THE FOLLOWING ACTIONS:

A. ADD CAP 21392-52843-941 TO FUEL RETURN LINE NIPPLE 12466806-2

ON FUEL RESERVOIR.

B. INSTALL THE FUEL LINE COVER 12273529 TO TERMINATE THE

UAAPU FUEL LINE.

D W G

N O

S H

1DISTRIBUTION STATEMENT C:

DISTRIBUTION AUTHORIZED TO U.S. GOVERNMENT AGENCIES AND

THEIR CONTRACTORS, (REASON: EXPORT CONTROLLED, ADMINISTRATIVE

AND OPERATIONAL USE), (DATE OF DETERMINATION: 03 MARCH 2011).

OTHER REQUESTS FOR THIS DOCUMENT SHALL BE REFERRED TO MBTS

SECURITY OFFICE AT PROGRAM EXECUTIVE OFFICE GROUND COMBAT

SYSTEMS, ATTN: SFAE-GCS-M MAIL STOP 560, 6501 EAST ELEVEN

MILE ROAD, WARREN, MI 48397-5000.

WARNING - THIS DOCUMENT CONTAINS TECHNICAL DATA

WHOSE EXPORT IS RESTRICTED BY THE ARMS EXPORT

CONTROL ACT (TITLE 22, U.S.C., SEC 2751, ET SEQ)

OR THE EXPORT ADMINISTRATION ACT OF 1979 (TITLE 50,

U.S.C., APP. 2401 ET SEQ.), AS AMENDED. VIOLATIONS

OF THESE EXPORT LAWS ARE SUBJECT TO SEVERE CRIMINAL

PENALTIES. DISSEMINATE IN ACCORDANCE WITH PROVISIONS

OF DOD DIRECTIVE 5230.25.

DESTRUCTION NOTICE:

DESTROY BY ANY METHOD THAT WILL PREVENT THE DISCLOSURE OF

CONTENTS OR RECONSTRUCTION OF THE DOCUMENT.

REVISION HISTORY

APPROVEDDATE (YR-MO-DA)DESCRIPTIONREV

15-03-11

REVISED PER

SCR-00002811

A

15-10-21

REVISED PER

SCR-00003787

B

DHW15-12-12

REVISED PER

SCR-00003970

C

APPLICATION

USED ONNEXT ASSY

M1A2 SEPV312546210

gov_esize (One Engineering) Rev A

SHEET 1 OF 2UNIT WT NASCALE: 67:600ALL SHEETS AT REV C

C1254611919207E

--K. HARDESTY

DESIGN APPROVAL - GOVTDRAWING APPROVAL - GOVTLOG ENGRG

-E. CRONENWORTH-

REVDWG NOCAGE CODESIZEELEC ENGRGENGRGWELD ENGRG

AUXILIARY POWER UNIT INSTALLATION

M. FEUSTELR. HASSF. JONES

DIMENSION MGTCHECKERMFG ENGRG

14-03-31C. TUCKERB. DZIURDA

THIRD ANGLE

PROJECTION

DATE (YR-MO-DA)DRAWN BYMATL ENGRG

Land SystemsAPMIC:

GENERAL DYNAMICS TITLE

UNLESS OTHERWISE SPECIFIED

DIMENSIONS ARE IN INCHES

CONTRACTOR

W56HZV-12-C-0322ENGLISH CONTRACT NUMBER

SYM TORQUE VALUES

THREAD

SIZE

10-12 FTLB LUBRICATED .250-20

36-43 FTLB LUBRICATED .375-16

SH2

F6

SH2

F4

SH2

G2

SH2

C6

FUEL DISCONNECT

12546121 REF (FUEL

INSTALLATION)

SH2

D2

1245678 3

A

E

G

H

F

D

C

1245678

A

E

B

G

H

F

D

C

D W G

N O

S H

SHEET 2 OF 2SCALE: 67:600

C1254611919207E

REVDWG NOCAGE CODESIZE

gov_esize (One Engineering) Rev A

DISTRIBUTION STATEMENT C: DISTRIBUTION AUTHORIZED TO U.S.

GOVERNMENT AGENCIES AND THEIR CONTRACTORS; EXPORT CONTROLLED;

DESTROY TO PREVENT DISCLOSURE OR RECONSTRUCTION.

SECTION C-C

SH1, F5

402-0119-6 REF

FORWARD LIFTING EYE

SECTION B-B

SH1, C5

402-0119-2 REF

FORWARD LIFTING EYE

402-0119-2 REF

FORWARD LIFTING EYE

FUEL DISCONNECT

12546121 REF

(FUEL INSTALLATION)

ELECTRICAL DISCONNECT

12546351 REF

(POWER DISTRIBUTION, HULL ELECTRICAL)

(1) (3)

(4) (6)

(2)

(5)

SECTION D-D

SH1, C3

SECTION E-E

SH1, B6

SECTION A-A

SH1, C3

402-8004-2 REF

REAR LIFTING EYE

Sheet 1
Views
new_view_1
top_2
right_9
Sheet 2
Views
bottom_6
top_7
right_10
right_14
left_18

File details come from the government source that posted it. Updated .