This statement of work outlines requirements for an Auxiliary Power Unit (APU) Test Stand to be delivered to Anniston Army Depot. The contractor shall provide a revised ATP for the APU, an APU test fixture including a test stand, fuel tank, electrical loads, batteries, test bench schematic, test software, cabling, computer, test equipment, and calibration documentation. The contractor must also furnish an APU test stand assembly, duct tester, actuator tester, and megohm meter. Additional requirements include safety data sheets for hazardous materials and training for the test stand. The contractor must warranty all material, parts, and workmanship for one year following government acceptance of the APU Test Stand. Work will be performed at Anniston Army Depot during normal business hours and the contractor shall comply with all safety requirements.

View the file

Other files for this federal contract opportunity

Other files attached to APU Test Stand, newest first.
File Type Posted
Attachment 6- Drawing 12546380_C.pdf PDF
Attachment 5- Drawing 12649297_B.pdf PDF
W911KF-22-Q-0032 Amendment 1.pdf PDF
Attachment 2 - Evidence of Authority To Sign Offers.pdf PDF
Attachment 3 - DD Form 1423 - APU Test Stand.pdf PDF
Attachment 4 - Drawing 12546119_C.pdf PDF
W911KF-22-Q-0032 Released.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DESCRIPTION/WORK STATEMENT/SPECIFICATION

FOR

AUXILIARY POWER UNIT (APU) TEST STAND

1. Scope: Development and delivery of test equipment for the APU Assembly, #12546380 by the OEM, Marvin Land Systems (Contractor). The APU Test Stand will be delivered to Anniston Army Depot, building 474 and installed in Test Cell 7.

2. Documents:

a. Quote: See attached document “M1 APU NMWR Revised Quote Anniston”.

b. For the drawing of the Unit to be Tested: See attached document “12546119_C”.

c. For the current Acceptance Test Procedure (ATP): See attached document “APU ATP-402-9901-Rev_B_PRELIMINARY”.

3. Contractor Requirements: The contractor will provide the following:

a. A revised ATP for the APU.

b. APU Test fixture. To include but not limited to:

i. Test Stand

ii. Fuel Tank

iii. Electrical Loads

iv. Main Relay

v. Batteries

vi. Test Bench Schematic/Drawing

vii. Test Software

viii. Cabling

ix. Computer

x. Canalyzer

xi. Test Equipment

xii. Calibration and Maintenance Requirements

c. Provide APU Test Stand Assembly hardware.

d. Proved Duct Tester, its internal components, and hardware.

e. Provide Actuator Tester and its hardware.

f. Provide a Megaohm Meter with the APU test points, procedure and troubleshooting documents, and hardware.

g. Provide Safety Data Sheets (SDS) for all hazardous materials.

h. Provide Training for the test stand developed.

i. If visiting on site, Contractor shall comply with Anniston Army Depot’s health and safety requirements. Contractor shall wear steel toe or composite toe shoes, safety glasses, and mask. Hearing protection will be provided by Anniston Army Depot if required.

4. Project Completion Requirements:

a. Acceptance of work completed shall be done by the assigned Government

Contracting Officer’s Representative (COR), the test stand operator, and the Production Engineering Tech.

i. All test equipment provided shall be in working condition.

ii. All documents provided shall be in electronic form. Documentation shall include, but not be limited to, an operator’s manual, maintenance manual, calibration procedures, test/inspection reports, COTS manual/associated supplemental data, drawings, and a list of all equipment and parts.

iii. Anniston Army Depot shall be able to completely and successfully test three (3) APU units.

b. All work performed at Anniston Army Depot will be performed during normal business hours between 7:00 a.m. to 3:30 p.m. Monday through Friday. The Contractor shall not expect to work off Fridays, holidays, weekends or during maintenance shutdowns without special permission from the COR.

5. Warranty: The Contractor shall provide a warranty for a period of not less than one (1) year. The warranty shall begin the day following government acceptance of the APU Test Stand. During the warranty period, the contractor shall be responsible for all costs, including parts, labor, travel, and lodging required to complete any and all repairs of any defects in the material, parts, and/or workmanship. The warranty shall be written in the Anniston Army Depot’s name.