Attachment 4 - AF 66 (24 JUNE 2020).pdf
PDF 17 KB Posted
- Attached to
- Replace Cooling Tower Bldg 1002 Federal contract opportunity
- Solicitation number
- FA301020R0034
About this file
This submittal register outlines 13 items required from the contractor replacing Cooling Tower B1002 at Stennis Hall for the Department of the Air Force. The contractor must submit cooling tower installation and framing layouts within 30 days of notice to proceed, along with partial and full CHW plant operation plans. Rigging, removal and installation plans are due 30 days after notice to proceed. The contractor must also submit cooling tower, VFD controller, and CHW isolation valve information within 10 days of notice to proceed. Hazardous material questionnaires, MSDS, and reporting forms are due 5 days prior to the start date and at the end of the contract. The recycling and landfill report is due at the end of the contract. The replacement of Cooling Tower B1002 must follow the specifications in the statement of work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 3 - FA301020R00340003.pdf | ||
| Attachment 2 - MAHG201067 SPEC Rev 2 (Dated 21 Aug 2020).pdf | ||
| Amendment 2 - FA301020R00340002.pdf | ||
| Attachment 2 - MAHG201067 SPEC Rev 1 (Dated 10 Aug 2020).pdf | ||
| Attachment 10 - Provision 52.204-24 & Clause 52.204-25.pdf | ||
| Amendment 1 - FA301020R00340001.pdf | ||
| Site Visit Sign-In Sheet (29 Jul 20).pdf | ||
| Attachment 5 - WD MS20200050.pdf | ||
| Attachment 1 - MAHG201067 SOW.pdf | ||
| Attachment 2 - MAHG201067 SPEC.pdf | ||
| Attachment 6 - Past Performance Questionnaire.pdf | ||
| Attachment 8 - SF 1444.pdf | ||
| Attachment 9 - Notice of Compliance.pdf | ||
| Solicitation - FA301020R0034.pdf | ||
| Attachment 7 - Past Performance Reference List.pdf | ||
| Attachment 3 - MAHG201067 DWG.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 HazMat Questionnaire 3 3 5 Days Prior to Start Date
2 HazMat MSDS 3 5 Days Prior to Start Date
Must be filled out if contractor answers YES to the Hazmat
Questionnaire
3 Hazmat Reporting Entry Form 3 3 5 Days Prior to Start Date
Submit Final Quantities
4 Hazmat Reporting Entry Form 3 3 End of Contract
5 Recycling and Landfill Report 3 3 End of Contract
6 With Submittal: Cooling Tower 1 3 1 within 10 days of notice to proceed
7 With Submittal: VFD Controllers 1 3 1 within 10 days of notice to proceed
8 With Submittal: CHW Isolation Valves 1 3 1 within 10 days of notice to proceed
9 Cooling Tower Install Layout, per SOW 3.2.4 3 1 1 1 1 30 Days
After Notice to Proceed
10 Cooling Tower FDN framing Layout, per SOW 3.2.4 3 1 1 1 1
30 Days After Notice to Proceed
CHW piping mod Partial CHW plant operation plan, per SOW 3.2.4
1 1 3 30 Days
After Notice to Proceed
Cooling Tower Replacement CHW plant operation plan with TEMP chiller, per SOW 3.2.4
1 1 3 30 Days
After Notice to Proceed
Cooling Tower Replacement Rigging, Removal & Install Plan per SOW 3.2.4
1 1 3 30 Days
After Notice to Proceed
DATE TO CIVIL
ENGINEERING
FINAL APPROVAL
RETURN
SUSPENSE DATE
REMARKS
CONTRACTOR
RESUBMITTAL
DATE CONTRACTOR
NOTIFIED
APPROVED DIS-
APPROVED
SUBMITTAL REGISTER Project Number
MAHG 20 -1067
Project Name Replace Cooling Tower B1002, Stennis Hall
TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
C
AT
AL
O
G D
AT
A
O
PE
R
AT
IN
G
IN
ST
R U
C
TI
O N
S
D
AT
A
C
ER
TI
FI
C
AT
IO
N
O F
C O
M
PL
IA
N
C E
D O
C U
M
EN
T \ R
EP
O
R T
REQUIRED
SUBMISSION DATE
I T E M
N U M B E R
ITEM OR DESCRIPTION OF ITEM, CONTRACT
REFERENCE, TYPE OF SUBMITTAL
SH
O
P D
R
AW
IN
G
S
M
AN
U
FA
C
TU
R
ER
'S R
EC
O
M M
EN
D
AT
IO
N S
M
AN
U
FA
C
TU
R
ER
'S W
AR
R
AN
TY
SA
M
PL
ES
NO. OF COPIES REQUIRED
C O
LO
R
S
EL
EC
TI
O N
AF 66 Sheet 1-16
File details come from the government source that posted it. Updated .