Attachment 4 - AF 66 (24 JUNE 2020).pdf

PDF 17 KB Posted

Attached to
Replace Cooling Tower Bldg 1002 Federal contract opportunity
Solicitation number
FA301020R0034
Issued by
Department of the Air Force Air Education and Training Command

About this file

This submittal register outlines 13 items required from the contractor replacing Cooling Tower B1002 at Stennis Hall for the Department of the Air Force. The contractor must submit cooling tower installation and framing layouts within 30 days of notice to proceed, along with partial and full CHW plant operation plans. Rigging, removal and installation plans are due 30 days after notice to proceed. The contractor must also submit cooling tower, VFD controller, and CHW isolation valve information within 10 days of notice to proceed. Hazardous material questionnaires, MSDS, and reporting forms are due 5 days prior to the start date and at the end of the contract. The recycling and landfill report is due at the end of the contract. The replacement of Cooling Tower B1002 must follow the specifications in the statement of work.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 HazMat Questionnaire 3 3 5 Days Prior to Start Date

2 HazMat MSDS 3 5 Days Prior to Start Date

Must be filled out if contractor answers YES to the Hazmat

Questionnaire

3 Hazmat Reporting Entry Form 3 3 5 Days Prior to Start Date

Submit Final Quantities

4 Hazmat Reporting Entry Form 3 3 End of Contract

5 Recycling and Landfill Report 3 3 End of Contract

6 With Submittal: Cooling Tower 1 3 1 within 10 days of notice to proceed

7 With Submittal: VFD Controllers 1 3 1 within 10 days of notice to proceed

8 With Submittal: CHW Isolation Valves 1 3 1 within 10 days of notice to proceed

9 Cooling Tower Install Layout, per SOW 3.2.4 3 1 1 1 1 30 Days

After Notice to Proceed

10 Cooling Tower FDN framing Layout, per SOW 3.2.4 3 1 1 1 1

30 Days After Notice to Proceed

CHW piping mod Partial CHW plant operation plan, per SOW 3.2.4

1 1 3 30 Days

After Notice to Proceed

Cooling Tower Replacement CHW plant operation plan with TEMP chiller, per SOW 3.2.4

1 1 3 30 Days

After Notice to Proceed

Cooling Tower Replacement Rigging, Removal & Install Plan per SOW 3.2.4

1 1 3 30 Days

After Notice to Proceed

DATE TO CIVIL

ENGINEERING

FINAL APPROVAL

RETURN

SUSPENSE DATE

REMARKS

CONTRACTOR

RESUBMITTAL

DATE CONTRACTOR

NOTIFIED

APPROVED DIS-

APPROVED

SUBMITTAL REGISTER Project Number

MAHG 20 -1067

Project Name Replace Cooling Tower B1002, Stennis Hall

TO BE COMPLETED BY PROJECT MANAGER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

C

AT

AL

O

G D

AT

A

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

D

AT

A

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

D O

C U

M

EN

T \ R

EP

O

R T

REQUIRED

SUBMISSION DATE

I T E M

N U M B E R

ITEM OR DESCRIPTION OF ITEM, CONTRACT

REFERENCE, TYPE OF SUBMITTAL

SH

O

P D

R

AW

IN

G

S

M

AN

U

FA

C

TU

R

ER

'S R

EC

O

M M

EN

D

AT

IO

N S

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

SA

M

PL

ES

NO. OF COPIES REQUIRED

C O

LO

R

S

EL

EC

TI

O N

AF 66 Sheet 1-16

File details come from the government source that posted it. Updated .