Attachment 3 - Submittal Register.pdf
PDF 68 KB Posted
- Attached to
- Repair Pavement Apron Foxtrot - Amendment 0001 Federal contract opportunity
- Solicitation number
- FA448620R0006
About this file
This document is a submittal register for contract MQNA 19-1508 to repair pavement on an airfield apron at Fox Foxtrot. The register outlines 22 required submissions from the contractor organized by project phase, including a safety plan, schedule, waste disposal plan, product data and test reports for various repair materials, grooving and painting procedures, welding permits, barrier plans, as-built drawings and DD Form 1354 for project closeout. Submissions are due before work starts, at interim points, and no later than five days before final completion. The contracting agency is the Department of the Air Force United States Air Forces in Europe - Air Forces Africa.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Questions and Answers 10 Aug 2020.pdf | ||
| Solicitation Amendment FA448620R00060001 SF 30.pdf | ||
| Attachment 1 - Statement of Work (SOW) Rev 1 15 June 2020.pdf | ||
| Attachment 2 - Project Drawings.pdf | ||
| Solicitation - FA448620R0006 Issued.pdf | ||
| Attachment 4 - Performance Relevancy Questionnaire (PRQ).pdf | ||
| Attachment 5 - Past Present Performance Questionnaire (PPQ).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LI
N
E N
U M
B
ER
C
ER
TI
F.
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
TU
R
U R
'S R
EC
O
M M
EN
D
AT
IO
N
C
AT
AL
O
G D
AT
A
O &M
R
EC
O M
M
EN
D
AT
IO
N
S
C
AL
C U
LA
TI
O N
S
W
AR
R
AN
TY
D R
AW
IN
G S
TE
ST
R
ES
U
LT
S
O
TH
ER
S
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
TO
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
AP
PR
O
VE
D
D
IS
AP
PR
O
VE
D
C O
N
TR
AC
TO
R S
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
REMARKS
GENERAL
1 AF 103 Cleareance Request x Before start 2 List of Contractor and Subcontractor Personnel x Before start 3 Safety Plan x x Before start 4 Joint Material and Application Procedure x x x x x x x Before start 5 Preconstruction Submittals x Before start
5.1 Schedule of work (Progress Schedule) x Before start
5.2 RUBBER,WEEDS, AND OTHER FOREIGN MATERIAL
Removal Process Plan x Before start
5.3 Waste Collection, Identification and Disposal Plan x x Before start 6 RUBBER,WEEDS, AND OTHER FOREIGN MATERIAL Product
Data (if applicable) x x x Before start
7 RUBBER,WEEDS, AND OTHER FOREIGN MATERIAL Test Reports x x x Before start
8 Active Sealing Product Data x x x x x Before start 9 Active Sealing Test Reports x x Before start
10 Crack Sealing Product Data x x x x x Before start 11 Crack Sealing Samples and Materials x Before start 12 Crack Sealing Test Reports x x Before start 13 Grooving Process x Before start 14 Paint x x x x x x Before start 15 Beads x x x x x Before start 16 Paint Equipment and procedures x x Before start 17 Welding/Cutting Permit x Before start 18 Temporary Barriers Plan x x Before start 19 Sub-Contractor Plan (if applicable) x Before start 20 Work Phasing Plan x Before start 21 Interim DD Form 1354 x Middle
CLOSEOUT
22 Final DD Form 1354 x 5 days Before Final 23 As Built Drawings x x Before Final
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NUMBER PROJECT NAME SOLICITATION /CONTRACT NUMBER
MQNA 19-1508 Repair Pavement on Apron Fox
File details come from the government source that posted it. Updated .