Attachment_3_-_Phase_2_Visitor_Center_Existing_Drawings_and_Images.pdf
PDF 863 KB Posted
- Attached to
- REMOVE , REPLACE AND INSTALL HVAC SYSTEM Federal contract opportunity
- Solicitation number
- 140P4223Q0017
About this file
This document includes a federal contract opportunity for HVAC system work and existing drawings and images of the HVAC system at Booker T. Washington National Monument. The federal contract opportunity is a competitive small business set-aside for a firm-fixed price contract to remove, replace, and install HVAC systems in two phases at the Monument headquarters and visitor center. Phase 1 involves removing and replacing in-kind the existing HVAC equipment at the headquarters and cleaning ductwork. Phase 2 involves removing an existing boiler and associated equipment at the visitor center, installing a new HVAC system including electrical and ductwork, and removing and disposing of a 2,000 gallon heating fuel tank. The estimated contract value is between $100,000 and $250,000 and the period of performance is 100 calendar days. An organized site visit will be held on March 16, 2023. The existing drawings and images show the existing HVAC system layout and components in the visitor center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140P4223Q0017_Amd_0001.pdf | ||
| B08_Attachment_7_-_Key_Personnel_Qualifications.docx | DOCX document | |
| Attachment_5_-_Experience_Questionnaire.docx | DOCX document | |
| Sol_140P4223Q0017.pdf | ||
| Construction_Contract_Administration.docx | DOCX document | |
| B08_Attachment_8_-_Report_on_Limitation_on_Subcontracting.xlsx | XLSX spreadsheet | |
| Attachment_1_-_BOWA_HVAC_SOW_09-13-2022.pdf | ||
| Attachment_2_-_Phase_1_Headquarters_Current_Images.pdf | ||
| Attachment_6_-_Past_Performance_Questionnaire.docx | DOCX document | |
| Attachment_4_-_WD_VA20220172.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Visitor Center First Floor Plan
Fuel Tank Connection
Images of Existing System in Visitor Center
Chase Leading from Mechanical Room with Return:
Chase in Mechanical Room:
Ductwork Leading in the Chase:
Ductwork Running Under Floor and Door in Visitor Center Lobby:
Ductwork with Smoke Detection:
Ductwork within the Wall:
Fresh Air Return:
Return Register at bottom of Chase in VC Exhibit Room:
Return at bottom of Visitor Center Desk in Lobby:
Return Ductwork in Mechanical Room at Visitor Center:
Supply Registers in Visitor Center Lobby:
Supply Registers in Visitor Center Exhibit Room:
Supply Registers in Visitor Center Exhibit Room: