Attachment_3_-_Phase_2_Visitor_Center_Existing_Drawings_and_Images.pdf

PDF 863 KB Posted

Attached to
REMOVE , REPLACE AND INSTALL HVAC SYSTEM Federal contract opportunity
Solicitation number
140P4223Q0017
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document includes a federal contract opportunity for HVAC system work and existing drawings and images of the HVAC system at Booker T. Washington National Monument. The federal contract opportunity is a competitive small business set-aside for a firm-fixed price contract to remove, replace, and install HVAC systems in two phases at the Monument headquarters and visitor center. Phase 1 involves removing and replacing in-kind the existing HVAC equipment at the headquarters and cleaning ductwork. Phase 2 involves removing an existing boiler and associated equipment at the visitor center, installing a new HVAC system including electrical and ductwork, and removing and disposing of a 2,000 gallon heating fuel tank. The estimated contract value is between $100,000 and $250,000 and the period of performance is 100 calendar days. An organized site visit will be held on March 16, 2023. The existing drawings and images show the existing HVAC system layout and components in the visitor center.

View the file

Other files for this federal contract opportunity

Other files attached to REMOVE , REPLACE AND INSTALL HVAC SYSTEM, newest first.
File Type Posted
Sol_140P4223Q0017_Amd_0001.pdf PDF
B08_Attachment_7_-_Key_Personnel_Qualifications.docx DOCX document
Attachment_5_-_Experience_Questionnaire.docx DOCX document
Sol_140P4223Q0017.pdf PDF
Construction_Contract_Administration.docx DOCX document
B08_Attachment_8_-_Report_on_Limitation_on_Subcontracting.xlsx XLSX spreadsheet
Attachment_1_-_BOWA_HVAC_SOW_09-13-2022.pdf PDF
Attachment_2_-_Phase_1_Headquarters_Current_Images.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_4_-_WD_VA20220172.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Visitor Center First Floor Plan

Fuel Tank Connection

Images of Existing System in Visitor Center

Chase Leading from Mechanical Room with Return:

Chase in Mechanical Room:

Ductwork Leading in the Chase:

Ductwork Running Under Floor and Door in Visitor Center Lobby:

Ductwork with Smoke Detection:

Ductwork within the Wall:

Fresh Air Return:

Return Register at bottom of Chase in VC Exhibit Room:

Return at bottom of Visitor Center Desk in Lobby:

Return Ductwork in Mechanical Room at Visitor Center:

Supply Registers in Visitor Center Lobby:

Supply Registers in Visitor Center Exhibit Room:

Supply Registers in Visitor Center Exhibit Room:

File details come from the government source that posted it. Updated .