Sol_140P4223Q0017_Amd_0001.pdf

PDF 245 KB Posted

Attached to
REMOVE , REPLACE AND INSTALL HVAC SYSTEM Federal contract opportunity
Solicitation number
140P4223Q0017
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This document provides details for a solicitation to remove, replace, and install an HVAC system at the Booker T. Washington National Monument in Virginia. The government will award a firm-fixed price contract using lowest price technically acceptable procedures. Eligible vendors must have a Unique Entity Identifier and be registered in the System for Award Management. The work involves removing and disposing of existing HVAC equipment at two buildings, and installing new systems including ductwork, devices, and electrical connections. Site visits will be held on March 16th and questions are due by a week before proposals. Proposals are due by April 17, 2023 for work to be completed within 100 calendar days of the notice to proceed. The not-to-exceed budget is $250,000. Payment and performance bonds are required for offers over $150,000.

View the file

Other files for this federal contract opportunity

Other files attached to REMOVE , REPLACE AND INSTALL HVAC SYSTEM, newest first.
File Type Posted
B08_Attachment_7_-_Key_Personnel_Qualifications.docx DOCX document
Attachment_5_-_Experience_Questionnaire.docx DOCX document
Attachment_3_-_Phase_2_Visitor_Center_Existing_Drawings_and_Images.pdf PDF
Sol_140P4223Q0017.pdf PDF
Attachment_2_-_Phase_1_Headquarters_Current_Images.pdf PDF
Construction_Contract_Administration.docx DOCX document
B08_Attachment_8_-_Report_on_Limitation_on_Subcontracting.xlsx XLSX spreadsheet
Attachment_1_-_BOWA_HVAC_SOW_09-13-2022.pdf PDF
Attachment_6_-_Past_Performance_Questionnaire.docx DOCX document
Attachment_4_-_WD_VA20220172.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(x)

140P4223Q0017 x x

1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

x

Philadelphia PA 19107 1234 Market Street, 20th Floor

PNC

South/Philadelphia MABO Northeast Regional Contracting National Park Service

DOI, NPS, NERO & NER SOUTH MABO

03/02/20230001

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

FACILITY CODE CODE

10B. DATED (SEE ITEM 13)

10A. MODIFICATION OF CONTRACT/ORDER NO.

9B. DATED (SEE ITEM 11)

9A. AMENDMENT OF SOLICITATION NO.

CODE

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)

7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY

PAGE OF PAGES

4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)

1. CONTRACT ID CODE

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

03/02/2023

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.

ORDER NO. IN ITEM 10A.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Solicitation is amended as follows:

1. Extend the Closing date to 4/17/2023.

2. Answer questions received after the site visits were conducted. See pages 2 to 4 of this amendment.

Period of Performance: 05/01/2023 to 08/16/2023

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED

(Signature of person authorized to sign) (Signature of Contracting Officer)

Wendy De Leon

STANDARD FORM 30 (REV. 11/2016)

Prescribed by GSA FAR (48 CFR) 53.243

Previous edition unusable

Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .

140P4223Q0017_0001

Booker T. Washington National Monument Bowa Remove, Replace, And Install HVAC System

Pre-Bid Walk through Q&A

1. The reference to SEER 18, which is typically a residential standard. The new iEER is the governing Standard for Commercial HVAC for this type of application. Is the project intent to comply with the DOE 2023 minimum standards?

Yes, the project shall comply with the DOE 2023 minimum standards

2. The smoke detectors appear to exist on the ductwork at locations where they may need to be relocated for transitions with new equipment. Is it the intent to have smoke detectors built within the units for unit shutoff, or just re-install existing?

Existing may be reinstalled.

3. Who are the facilities proprietary fire alarm and suppression contractor? Is it the contractor’s responsibility to coordinate disconnect and reconnection of the smoke detectors with use of the proprietary fire contractor? Does the facility have a rate agreement for services with the proprietary vendor, or will such be the responsibility of the contractor to procure?

We will work with the fire alarm and suppression contractor to coordinate the disconnection and reconnection of the smoke detectors.

4. For system design purposes, will the new system require engineering beyond sizing for the spaces to be conditioned?

Not necessarily.

5. What is the design cooling/heating setpoints for the building? What is the summer/winter design temps desired?

Controlled by the staff.

6. The radiators throughout the building appear to no longer be needed with elimination of the boiler. This leaves large areas of replacement for stained trim and carpet areas. After the penetrations are sealed, it may be easier to replace the entire carpet in the building, should this be included in the scope of the project?

No, park will handle.

7. As far as the stained wood trim is concerned, what is the grade and type of wood to match?

No applicable. The park will take care of the trim.

8. If not replacing carpet in total, what is brand and type of carpets to be repaired? Any other governing information for carpet?

No applicable. The park will take care of the carpet.

9. Regarding the product warranty for equipment. Many Buy American Compliant manufacturer’s only offer 5-year warranties. Should the warranty be parts, labor, and compressor for 5 years? Are extended contract warranties acceptable if ten-year warranties are still desired?

Warranty should be parts, labor, and compressor. Extended is acceptable.

10. Many rooms of the building are not currently installed with Air-Conditioned cooling through return and supplies, though have radiators for heating. Is it the intent to install multi-zone or single-zone mini-split heat pumps to serve these areas by routing line sets through areas currently occupied by hot water and chilled water supplies and returns? Is it preferred to have ceiling mounted evaporators, in lieu of wall mounted to provide HVAC to these areas?

This should be part of the design created.

11. It appears the project has a requirement for CAD drawings for as-builts. Are there CAD files available for modifications to the mechanical and electrical drawings to work from?

Creating new is a large expense.

The park is requesting new CAD drawings.

12. Please verify that all removed apertures and device shall be demo ’ed in full and not abandoned in place.

Should not be abandoned in place.

13. In areas where the existing chilled water and hot water lines are inaccessible (underground for instance) for removal, can they be filled inert and capped in place?

Yes

14. Is it acceptable to install a unit outside the bathroom building on a pad for service to the bathrooms?

15. There is a storage area underneath the flat roof area of the visitor’s center. Is this area to be conditioned with HVAC?

No, this area will not be conditioned with HVAC

16. There are some rather old breaker panels which I cannot find new breakers for. Are reutilized breakers acceptable, or will new panels be desired?

New panels are desired.

17. The period of performance for this project is not likely to be able to be accomplished in 100 days. “We are in the process of ordering 25-ton package units and were told the lead time is 47 weeks.” Will the period of performance be extended due to the manufacturer’s lead times?

Yes, may be extended depending on circumstances.

18. The drawings provided in the solicitation documents are not complete, can you provide as-builts or drawings of the restrooms and updated drawings of the visitor’s center?

19. The depth of work may require additional site visits after award, will access be granted prior and after NTP to perfect the design intent of the scope of work?

20. There appears to be an exhaust fan for the boiler area in the mechanical room. Should the flash tanks, condensate tanks and exhaust fans be removed with the boiler?

Yes, they are associated with the boiler.