Attachment 3 - Drawings Alpine Sidewalk Gutters.pdf

PDF 3 MB Posted

Attached to
Concrete Walkway Reconstruction Federal contract opportunity
Solicitation number
127eAX23Q0061
Issued by
Department of Agriculture Forest Service R3-Southwestern Region

View the file

Other files for this federal contract opportunity

Other files attached to Concrete Walkway Reconstruction, newest first.
File Type Posted
AWARD NOTIFICATION.pdf PDF
AMENDMENT 2.pdf PDF
AMENDMENT 1.pdf PDF
Attachment 4 - Apache-Sitgreaves NF Fire Plan.pdf PDF
127EAX23Q0061 Concrete Walkway Reconstruction Solicitation.pdf PDF
Attachment 1 - Wage Determination.pdf PDF
Attachment 5 - BioPreferred.pdf PDF
Attachment 2 - Statement of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Alpine Admin Sites 1 & 3 Sidewalk Reconstruction & Improvements

SOUTHWEST REGION 3

APACHE-SITGREAVES NATIONAL FOREST

ALPINE RANGER DISTRICT

INDEX OF DRAWINGS

PROJECT VICINITY MAP

Sheet 1 Title Sheet Sheet 2 Site 1 Gutters and Snow Bar Installation Sheet 3 Site 1 Gutters and Snow Bar Installation Sheet 4 Site 1 Concrete Sidewalk Removal Sheet 5 Site 1 Concrete Sidewalk Construction Sheet 6 Site 3 Gutters and Snow Bar Installation

Administrative Site #1 Gutter, Downspout and Snow Bar installation

1. Install 6" K style gutters in areas indicated by blue

2. Install Down Spouts in areas indicated by green

3. Install Snow bar in areas indicated by red

Sheet 2

2 of6

USDA

A da m S an ds

-0 4-

BLDG

01-032A & 01-032B asands Highlight asands Highlight asands Highlight

Sheet 3

3 of6

USDA

A da m S an ds

-0 4-

BLDG 01-032C

Install 6" K style gutters in areas indicated by blue Install Down Spouts at circled areas Install Snow bar in areas indicated by red

Administrative Site #1 Gutter, Downspout and Snow Bar installation asands Highlight asands Highlight

Sheet 4

4 of6

USDA

A da m S an ds

-0 4-

Remove all concrete indicated in red and dispose of according to State and Federal laws.

Administrative Site #1 Concrete Sidewalk Removal asands Highlight asands Highlight

Sheet 5 5 of6

USDA

A da m S an ds

-0 4-

Install concrete indicated in green, according to specifications and drawings, to include drainage trough indicated in red.

Administration Site #1 New Concrete Sidewalk Construction asands Highlight asands Highlight

Sheet 6

6 of6

USDA

A da m S an ds

-0 4-

*Bldg 01-0308R

Install 6" K style gutters in areas indicated by blue Install Down Spouts at circled areas Install Snow bar in areas indicated by red

Administrative Site #3 Gutter, Downspout and Snow Bar installation

*Bldg 01-0308R and 01-0309R are identical buildings.

Locations of gutters, down spouts and snow bars shall be the same for both buildings.

asands Highlight asands Highlight