Attachment 3 - AF 66.pdf
PDF 410 KB Posted
- Attached to
- HJZH 21-4004 Repair Replace Boiler B55804 Federal contract opportunity
- Solicitation number
- FA500021R0064
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Ktrs Submitted Questions Boiler.docx | DOCX document | |
| Attachment 7 - Supplemental Specs HJZH 21 4004.pdf | ||
| Attachment 11 - Site Visit.pdf | ||
| Attachment 8 - Open Market General Specifications_28 Oct 2020.pdf | ||
| Attachment 2 - SOW.pdf | ||
| Attachment 5 - DD1354-fillable.pdf | ||
| Attachment 6 - Environmental Specifications on JBER (28 Oct 2020 Rev 3).pdf | ||
| Attachment 1 - Price Schedule.pdf | ||
| Attachment 10 - Wage_Determination - 30 Jul 2021.pdf | ||
| Attachment 7 - Supplemental Specs HJZH 21 4004.pdf | ||
| Attachment 9 - Contractors Fire Safety Guide (2017 ed).pdf | ||
| Attachment 4 - Reference Pictures.pdf |
Show all 12
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
HJZH 21-4004
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
D R
A W
IN
G
S
P L
A N
D E
S
IG
N C
A L
C U
L A
T
IO
N S
M A
N F
'R R
E C
O M
M E
N D
A T
IO
N
S
R E
Q U
E S
T L
E T
T E
R
C A
T A
L O
G D
A T
A
R E
P O
R T
S
T E
S T
D A
T A
O T
H E
R
REQUIRED
SUBMISSION
DATE
DATE RECEIVED
IN
CONTRACTING
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE
DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR
RE-SUBMITTAL
FINAL APPROVAL REMARKS
Notice of Start of Work 1 10 days prior to start of any work
Quality Control Plan 1 20 Days after NTP
Project Schedule AF3064 1 10 Days after NTP
Pumps 1 10 Days prior to installation
Piping & Insulation 1 10 Days prior to installation
Boilers 1 10 Days prior to installation
Boiler Replacement Plan 1 10 Days prior to work beginning
Design Plans- 65%, 95% 1 45 Days after NTP and prior to installation
DDC Controls 1 10 Days prior to installation
O&M Manuals 1 10 Days Prior to
Training Session
Training Plan 1 10 Days Prior to
Training Session
As-Builts 1 Prior to Project
Closeout
Equipment Test Plan 1 Prior to Project
Closeout
DDC Controls Testing 1 Prior to Project
Closeout
Equipment Test Results 1 Prior to Project
Closeout
Environmental Pre-Construction
Checklist 1 10 Days after NTP
AF Form 1354 1 Prior to Close Out
REPAIR-REPLACE BOILER,
BLDG 55804