Attachment 3 AF 66.pdf
PDF 93 KB Posted
- Attached to
- Earthquake Repair Multiple Facilities Federal contract opportunity
- Solicitation number
- FA500020Q0092
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA500020Q00920003 SF 30.pdf | ||
| Questions and Answers.pdf | ||
| Attachment 1 SOW and SPECS (Rev. 1).pdf | ||
| Attachment 2 Multi-Facility EQ Repair 20 Aug 2020.pdf | ||
| Solicitation Amendment FA500020Q00920002.pdf | ||
| Solicitation Amendment FA500020Q00920001 SF 30.pdf | ||
| Solicitation - FA500020Q0092.pdf | ||
| Attachment 1 SOW and SPECS.pdf | ||
| Attachment 5 DBA WD AK20200001 20200813.pdf | ||
| Attachment 2 Drawings and Reference Photos.pdf | ||
| Attachment 4 DD1354-fillable.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF FORM 66, OCT 99 Previous Edition Will Be Used
LI
N
E N
U M
B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.
C
ER
TI
F.
O F
C O
M
PL
IA
N
C E
SH
O
P D
R
AW
IN
G
S
C O
LO
R
S
EL
EC
TI
O N
M
AN
U
FA
TU
R
U R
'S R
EC
O
M M
EN
D
AT
IO
C
AT
AL
O
G D
AT
A
O &M
R
EC
O M
M
EN
D
AT
IO
N
S
C
AL
C U
LA
TI
O N
S
W
AR
R
AN
TY
D R
AW
IN
G S
R
EP
O R
T
TE
ST
R
ES
U
LT
S
SA
FE
TY
D
AT
A
SH
EE
TS
O
TH
ER
R
EQ
U
IR
ED
S
U
BM
IS
SI
O N
D
AT
E
D
AT
E
TO
C O
N
TR
AC
TI
N G
D
AT
E
TO
C
IV
IL
E
N G
IN
EE
R
IN
G
R
ET
U R
N S
U
SP
EN
SE
D
AT
E
SU
BM
IT
TA
L N
U M
BE
R
S
AP
PR
O
VE
D
D
IS
AP
PR
O
VE
D
C O
N
TR
AC
TO
R S
U
BM
IT
TA
L
FI
N
AL
A
PP
R
O
VA
L
NOTES
GENERAL
1 Project Specific Form 66 X NTP + 15
2 Work Plans/Construction Schedule X 10 Days Prior To Work Start
3 Contractor's Health, Safety, and Environment Plan X NTP + 15 4 Contractor's QA/QC Plan X NTP + 15
5 Section 01120, Supplimental Hazmat Specs, Para.
4.1.5 SWPPP
X 20 Days After
NTP
6 Section 01120, Supplimental Hazmat Specs, Para.
3.2 Safety Data Sheet X
30 Days Before Brought On
Base
7 Hazmat Specs, Para. 8.3 Spill Prevention & Clean Up Plan
X Prior To Work Start
Section 01121, Supplimental Hazmat Specs, Part 3 Documentation X NTP +10
DESIGN
All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) and 100% Design Drawings to include:
X NTP + 30
(100%)
10 Floor Plan, Elevations, Sections, Schedules, and Details
X NTP + 30
11 Electrical Layout X NTP + 30 12 Lighting Plan and Calculations X X NTP + 30
ARCHITECTURAL
13 Ceiling Tile & Grid X X NTP + 30 14 Exterior Tile X X NTP + 30 PHYSICAL SAMPLES REQUIRED 15 Exterior Caulk X X NTP + 30 16 Elastomeric crack prevention membrane X NTP + 30 17 Paint & Primer X X NTP + 30 PHYSICAL SAMPLES REQUIRED 18 Ceiling Tile & Grid X X NTP + 30
STRUCTURAL
19 Bracing Materials X NTP + 30
ELECTRICAL & COMMUNICATIONS
20 Electrical Cables X NTP + 30 21 Switches X NTP + 30 22 Electrical Panel/Breakers X NTP + 30 23 Conduits X NTP + 30 24 Lighting Fixtures X NTP + 30 25 Fire Device Test Results X SEE NOTES 3 DAYS AFTER TEST *IF NEEDED DUE TO DISTURBANCE OF EXISTING FIRE SYSTEM
CLOSEOUT
26 O&M maint data and maint manuals & Manufacturer's Warranty for All Equipment Installed
X X Install + 4
27 As Builts (electronic in AutoCAD and hard copies on Mylar) X Final + 7
SOLICITATION /CONTRACT NUMBERPROJECT NAME
EARTHQUAKE REPAIR
7053, 7076, 7083, 7179, 8005, 9311, 10364, 10366, 11369, 16670, 16673
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
PROJECT NUMBER
FXSB 20-5250M
Submittal 1
File details come from the government source that posted it. Updated .