Attachment 3 AF 66.pdf

PDF 93 KB Posted

Attached to
Earthquake Repair Multiple Facilities Federal contract opportunity
Solicitation number
FA500020Q0092
Issued by
Department of the Air Force Pacific Air Forces

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AF FORM 66, OCT 99 Previous Edition Will Be Used

LI

N

E N

U M

B ER Note: 3 copies required per submittal. Government will retain all submittals.Provide an electronic copy for each submittal.

C

ER

TI

F.

O F

C O

M

PL

IA

N

C E

SH

O

P D

R

AW

IN

G

S

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

TU

R

U R

'S R

EC

O

M M

EN

D

AT

IO

C

AT

AL

O

G D

AT

A

O &M

R

EC

O M

M

EN

D

AT

IO

N

S

C

AL

C U

LA

TI

O N

S

W

AR

R

AN

TY

D R

AW

IN

G S

R

EP

O R

T

TE

ST

R

ES

U

LT

S

SA

FE

TY

D

AT

A

SH

EE

TS

O

TH

ER

R

EQ

U

IR

ED

S

U

BM

IS

SI

O N

D

AT

E

D

AT

E

TO

C O

N

TR

AC

TI

N G

D

AT

E

TO

C

IV

IL

E

N G

IN

EE

R

IN

G

R

ET

U R

N S

U

SP

EN

SE

D

AT

E

SU

BM

IT

TA

L N

U M

BE

R

S

AP

PR

O

VE

D

D

IS

AP

PR

O

VE

D

C O

N

TR

AC

TO

R S

U

BM

IT

TA

L

FI

N

AL

A

PP

R

O

VA

L

NOTES

GENERAL

1 Project Specific Form 66 X NTP + 15

2 Work Plans/Construction Schedule X 10 Days Prior To Work Start

3 Contractor's Health, Safety, and Environment Plan X NTP + 15 4 Contractor's QA/QC Plan X NTP + 15

5 Section 01120, Supplimental Hazmat Specs, Para.

4.1.5 SWPPP

X 20 Days After

NTP

6 Section 01120, Supplimental Hazmat Specs, Para.

3.2 Safety Data Sheet X

30 Days Before Brought On

Base

7 Hazmat Specs, Para. 8.3 Spill Prevention & Clean Up Plan

X Prior To Work Start

Section 01121, Supplimental Hazmat Specs, Part 3 Documentation X NTP +10

DESIGN

All submissions to be provided in hard copy and electronically (The electronic submission will include the *.CTB file and any other supporting file required to print the drawing correctly) and 100% Design Drawings to include:

X NTP + 30

(100%)

10 Floor Plan, Elevations, Sections, Schedules, and Details

X NTP + 30

11 Electrical Layout X NTP + 30 12 Lighting Plan and Calculations X X NTP + 30

ARCHITECTURAL

13 Ceiling Tile & Grid X X NTP + 30 14 Exterior Tile X X NTP + 30 PHYSICAL SAMPLES REQUIRED 15 Exterior Caulk X X NTP + 30 16 Elastomeric crack prevention membrane X NTP + 30 17 Paint & Primer X X NTP + 30 PHYSICAL SAMPLES REQUIRED 18 Ceiling Tile & Grid X X NTP + 30

STRUCTURAL

19 Bracing Materials X NTP + 30

ELECTRICAL & COMMUNICATIONS

20 Electrical Cables X NTP + 30 21 Switches X NTP + 30 22 Electrical Panel/Breakers X NTP + 30 23 Conduits X NTP + 30 24 Lighting Fixtures X NTP + 30 25 Fire Device Test Results X SEE NOTES 3 DAYS AFTER TEST *IF NEEDED DUE TO DISTURBANCE OF EXISTING FIRE SYSTEM

CLOSEOUT

26 O&M maint data and maint manuals & Manufacturer's Warranty for All Equipment Installed

X X Install + 4

27 As Builts (electronic in AutoCAD and hard copies on Mylar) X Final + 7

SOLICITATION /CONTRACT NUMBERPROJECT NAME

EARTHQUAKE REPAIR

7053, 7076, 7083, 7179, 8005, 9311, 10364, 10366, 11369, 16670, 16673

SCHEDULE OF MATERIAL SUBMITTALS

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

PROJECT NUMBER

FXSB 20-5250M

Submittal 1

File details come from the government source that posted it. Updated .