Attachment 2 - Specs_ Repair 900 Block_ 24 Apr 2020.pdf
PDF 352 KB Posted
- Attached to
- Repair 900 Block Parking Lots Federal contract opportunity
- Solicitation number
- FA301020R0031
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - SOW_ Repair 900 Block_ 23 Jul 2020.pdf | ||
| Attachment 10 - Q and A_ 24 July 2020.pdf | ||
| Attachment 3 - DWG_ Repair 900 Block_Rev2_3 Oct 2019.pdf | ||
| Amendment 002.pdf | ||
| Site Visit_900 Block.pdf | ||
| Solicitation Amendment FA301020R00310001 SF 30.pdf | ||
| Solicitation - FA301020R0031.pdf | ||
| Attachment 7 - Past Performance Questionnaire.doc | DOC document | |
| Attachment 8 - Past Performance Reference List (SAP).docx | DOCX document | |
| Attachment 1 - SOW_ Repair 900 Block_ 24 Apr 2020.pdf | ||
| Attachment 5 - Notice of Compliance.pdf | ||
| Attachment 4 - AF 66_ 24 Apr 2020.xlsx | XLSX spreadsheet | |
| Attachment 3 - DWG_ Repair 900 Block_ 3 Oct 2019.pdf | ||
| Attachment 9 - SF 1444.pdf | ||
| Attachment 6 - WD MS20200133 (Dated 3 Jan 20).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPAIR BASE PARKING LOT
900 BLOCK SPECIFICATIONS
24 April 2020
Repair 900 Block
MAHG13-1018
SECTION 32 01 16.71
COLD MILLING ASPHALT PAVEMENT
02/17
1.1.1 Measurement
The quantity of milled pavement will be the number of square yards completed and accepted as determined by the Contracting Officer.
Determine the number of square yards of milled pavement by measuring the length and width of the milled surface within the specified work area.
Measure the width of the area to the closest inch and measure the length of the area to the closest foot.
1.2 QUALITY ASSURANCE
1.2.1 Grade
Mill pavement such that the finished surface conforms to the lines, grades, and cross sections indicated. The maximum allowable deviation of the finished milled pavement surfaces from the established plan grade line and elevation will be 1/4 inch. The deviations from the plan grade line and elevation will not be permitted in areas of pavements where closer conformance with planned grade and elevation is required for the proper functioning of appurtenant structures involved.
1.2.2 Surface Smoothness
The maximum allowable deviation of the finished surfaces from the testing edge in the transverse or longitudinal direction will be 1/4 inch.
1.2.3 Traffic Control
Provide all necessary traffic controls during milling operations.
1.3 EQUIPMENT, TOOLS, AND MACHINES
Maintain in a satisfactory working condition equipment, tools, and machines used in the performance of the work.
1.3.1 Cold-Milling Machine
Provide a cold-milling machine which is self-propelled, capable of milling the pavement to a specified depth and smoothness and of establishing grade control; with means of controlling transverse slope and dust produced during the pavement milling operation. Machine will have capability of adding water in front of equipment to minimize dust during milling operation. The machine will have the ability to remove the millings or cuttings from the pavement and load them into a truck.
The milling machine will not damage any part of the pavement structure that is not to be removed.
1.3.1 Cleaning Equipment
Provide cleaning equipment suitable for removing and cleaning loose material from the pavement surface.
1.3.2 Straightedge
Furnish and maintain at the site, in good condition, one 12 foot straightedge or other suitable device for each milling machine, for testing the finished surface. Make straightedge available for
Government use. Use straightedges constructed of aluminum or other lightweight metal, with blades of box or box-girder cross section with flat bottom reinforced to insure rigidity and accuracy. Use straightedges with handles to facilitate movement on the pavement.
1.4 ENVIRONMENTAL REQUIREMENTS
Do not perform milling when there is accumulation of snow or ice on the pavement surface.
2.1 MILLING OPERATION
A minimum of seven days’ notice is required, prior to start work, for the Contracting Officer to coordinate the milling operation with other activities at the site. Make sufficient passes so that the designated area is milled to the grades and cross sections indicated.
Mill the pavement in depth increments that will not damage the pavement below the designated finished grade. If scabbing occurs, the surface will not meet smoothness requirements. Take steps to modify the process as needed to prevent scabbing from occurring. Repair or replace, as directed, items damaged during milling such as manholes, valve boxes, utility lines, pavement that is torn, cracked, gouged, broken, or undercut. Remove the milled material from the pavement and load into trucks.
2.2 GRADE AND SURFACE-SMOOTHNESS TESTING
2.2.1 Grade-Conformance Tests
Test the finished milled surface of the pavement for conformance with the plan-grade requirements and for acceptance by the Contracting
Officer by running lines of levels at intervals of 25 feet longitudinally and 25 feet transversely to determine the elevation of the completed pavement. Correct variations from the designated grade line and elevation in excess of the plan-grade requirements as directed. Skin patching for correcting low areas will not be permitted.
Remove and replace the deficient low area.
Remove sufficient material to allow at least 1 inch of asphalt concrete to be placed.
3.2.1 Surface-Smoothness Tests
After completion of the final milling, the finished milled surface will be tested by the Government with a straightedge. Other approved devices may be used, provided that when satisfactorily and properly operated, such devices reveal all surface irregularities exceeding the tolerances specified. Correct surface irregularities that depart from the testing edge by more than 1/4 inch. Skin patching for correcting low areas will not be permitted. Remove and replace the deficient low area. Remove sufficient material to allow at least 1 inch of asphalt concrete to be placed.
3.1 REMOVAL OF MILLED MATERIAL
Material that is removed will become the property of the Contractor and removed from the site.
-- End of Section --
SECTION 32 11 23
AGGREGATE BASE COURSES
08/17
PART 1 GENERAL
1.1.1.1 Area
Measure the quantity of 2 inch thick asphalt completed and accepted, as determined by the Contracting Officer, in square yards.
1.1.1.2 Volume
Measure the quantity of asphalt completed and accepted, as determined by the Contracting Officer, in cubic yards. The volume of material in-place and accepted will be determined by the average job thickness.
1.1.1.3 Weight
The tonnage of material will be the number of metric tons of aggregate, placed and accepted in the completed course as determined by the
Contracting Officer. Deductions will be made for any material wasted, unused, rejected, or used for convenience of the Contractor, and for water exceeding specified amount at time of weighing.
1.1.2 Payment
1.2 REFERENCES
* NOTE: This paragraph is used to list the publications cited in the text of the guide specification. The publications are referred to in the text by basic designation only and listed in this paragraph by organization, designation, date, and title.
Use the Reference Wizard's Check Reference feature when you add a RID outside of the Section's Reference Article to automatically place the reference in the Reference Article. Also use the Reference Wizard's
Check Reference feature to update the issue dates.
References not used in the text will automatically be deleted from this section of the project specification when you choose to reconcile references in the publish print process.
The publications listed below form a part of this specification to the extent referenced. The publications are referred to in the text by basic designation only.
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS (AASHTO)
AASHTO T 180 (2017) Standard Method of Test for Moisture-Density
Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm
(18-in.) Drop
AASHTO T 224 (2010) Standard Method of Test for Correction for Coarse
Particles in the Soil Compaction Test
AASHTO T 88 (2013) Standard Method of Test for Particle Size Analysis of Soils
ASTM INTERNATIONAL (ASTM)
ASTM C117 (2017) Standard Test Method for Materials Finer than 75-um (No.
200) Sieve in Mineral Aggregates by Washing
ASTM C127 (2015) Standard Test Method for Density, Relative Density
(Specific Gravity), and Absorption of Coarse Aggregate
ASTM C128 (2015) Standard Test Method for Density, Relative Density
(Specific Gravity), and Absorption of Fine Aggregate
ASTM C131/C131M (2014) Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles
Machine
ASTM C136/C136M (2014) Standard Test Method for Sieve Analysis of Fine and
Coarse Aggregates
ASTM C29/C29M (2017a) Standard Test Method for Bulk Density ("Unit
Weight") and Voids in Aggregate
ASTM C88 (2018) Standard Test Method for Soundness of Aggregates by Use of
Sodium Sulfate or Magnesium Sulfate
ASTM D1556/D1556M (2015; E 2016) Standard Test Method for Density and
Unit Weight of Soil in Place by Sand-Cone Method
ASTM D1557 (2012; E 2015) Standard Test Methods for Laboratory
Compaction Characteristics of Soil Using Modified Effort (56,000 ft-lbf/ft3) (2700 kN-m/m3)
ASTM D2167 (2015) Density and Unit Weight of Soil in Place by the
Rubber Balloon Method
ASTM D2487 (2017) Standard Practice for Classification of Soils for
Engineering Purposes (Unified Soil Classification System)
ASTM D4318 (2017; E 2018) Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils
ASTM D5821 (2013; R 2017) Standard Test Method for Determining the
Percentage of Fractured Particles in Coarse Aggregate
ASTM D6938 (2017a) Standard Test Method for In-Place Density and Water
Content of Soil and
Soil-Aggregate by Nuclear Methods (Shallow Depth)
ASTM D75/D75M (2014) Standard Practice for Sampling Aggregates
ASTM E11 (2016) Standard Specification for Woven Wire Test Sieve Cloth and
Test Sieves
1.3 DEFINITIONS
For the purposes of this specification, the following definitions apply.
1.3.1 Aggregate Base Course
Aggregate base course (ABC) is well graded, durable aggregate uniformly moistened and mechanically stabilized by compaction.
1.3.2 Graded-Crushed Aggregate Base Course
Graded-crushed aggregate (GCA) base course is well graded, crushed, durable aggregate uniformly moistened and mechanically stabilized by compaction.
1.3.3 Degree of Compaction
Degree of compaction required, except as noted in the second sentence, is expressed as a percentage of the maximum laboratory dry density obtained by the test procedure presented in ASTM D1557 abbreviated as a percent of laboratory maximum dry density. Since ASTM D1557 applies only to soils that have 30 percent or less by weight of their particles retained on the
3/4 inch sieve, the degree of compaction for material having more than 30 percent by weight of their particles retained on the 3/4 inch sieve will be expressed as a percentage of the laboratory maximum dry density in accordance with AASHTO T 180 Method D and corrected with AASHTO T 224.
1.4 SUBMITTALS
SD-03 Product Data
Plant
SD-06 Test Reports
Initial Tests; In-Place Tests
1.5 EQUIPMENT, TOOLS, AND MACHINES
All plant, equipment, and tools used in the performance of the work will be subject to approval by the Contracting Officer before the work is started.
Maintain all plant, equipment, and tools in satisfactory working condition at all times. Use equipment capable of minimizing segregation, producing the required compaction, meeting grade controls, thickness control, and smoothness requirements as set forth herein.
1.6 QUALITY ASSURANCE
Sampling and testing are the responsibility of the Contractor. Test the materials to establish compliance with the specified requirements and perform testing at the specified frequency. The Contracting Officer may specify the time and location of the tests. Furnish copies of test results to the Contracting Officer within 24 hours of completion of the tests.
1.6.1 Sampling
Take samples for laboratory testing in conformance with ASTM D75/D75M. When deemed necessary, the sampling will be observed by the Contracting Officer.
1.6.2 Tests
1.6.2.1 Sieve Analysis
Perform sieve analysis in conformance with ASTM C117 and ASTM C136/C136M using sieves conforming to ASTM E11.
1.6.2.2 Liquid Limit and Plasticity Index
Determine liquid limit and plasticity index in accordance with ASTM D4318.
1.6.2.3 Moisture-Density Determinations
Determine the laboratory maximum dry density and optimum moisture content in accordance with paragraph DEGREE OF COMPACTION.
1.6.2.4 Field Density Tests
Measure field density in accordance with ASTM D1556/D1556M, ASTM D2167 or
ASTM D6938. For the method presented in ASTM D1556/D1556M use the base plate as shown in the drawing. For the method presented in ASTM D6938 check the calibration curves and adjust them, if necessary, using only the sand cone method as described in paragraph Calibration, of the ASTM publication. Tests performed in accordance with ASTM D6938 result in a wet unit weight of soil and ASTM D6938 will be used to determine the moisture content of the soil. Also check the calibration curves furnished with the moisture gauges along with density calibration checks as described in
ASTM D6938. Make the calibration checks of both the density and moisture gauges using the prepared containers of material method, as described in paragraph Calibration of ASTM D6938, on each different type of material being tested at the beginning of a job and at intervals as directed.
Submit calibration curves and related test results prior to using the device or equipment being calibrated.
1.6.2.5 Wear Test
Perform wear tests on [ABC] [and] [GCA] course material in conformance with
ASTM C131/C131M.
Perform soundness tests on GCA in accordance with ASTM C88.
1.7 ENVIRONMENTAL REQUIREMENTS
Perform construction when the atmospheric temperature is above 35 degrees
F.
PART 2 PRODUCTS
2.1 AGGREGATES
NOTE: Material requirements from State or other local highway agency specifications may be incorporated in contract documents for constructing aggregate base course for parking lots if the following conditions are met:
a. Percentage of material by weight passing the
0.075 mm (No. 200) sieve will not exceed 8.
b. Where local conditions dictate a non-frost-susceptible material, particles passing the 0.02 mm particle size will not exceed 3 percent.
c. Portion of the material passing the 0.425 mm (No. 40) sieve must have a liquid limit not greater than 25 and a plasticity index not greater than 5.
d. Rounded aggregates (such as river-run gravel) will not be allowed since they do not provide sufficient interlocking action to produce the desired strengths and durability.
Provide material consisting of clean, sound, durable particles of crushed stone, crushed gravel, angular sand, or other approved material. The portion retained on the 4.75 mm No. 4 sieve is known as coarse aggregate;
that portion passing the 4.75 mm No. 4 sieve is known as fine aggregate.
When the coarse and fine aggregate is supplied form more than one source, provide aggregate from each source that meets the specified requirements.
2.1.1 Coarse Aggregate
Provide coarse aggregates with angular particles of uniform density.
Separately stockpile coarse aggregate supplied from more than one source.
a. Crushed Gravel: Provide crushed gravel that has been manufactured by crushing gravels and that meets all the requirements specified below.
b. Crushed Stone: Provide crushed stone consisting of freshly mined quarry rock, meeting all the requirements specified below.
NOTE: Verify the subgrade soil contains less than
0.3 percent of sulfates, to prevent expansive ettringite reaction with the recycled concrete. See UFC 3-250-11, Appendix C for testing procedure.
Otherwise, delete recycled concrete option.
Do not permit recycled concrete aggregate (RCA) to be used in a airfield pavement section without evaluating for Alkali-Silica Reactivity (ASR).
See IPRF-01-G-002-03-5, "Evaluation, Design and Construction
Techniques for Airfield Concrete Pavement Used as Recycled Material for
Base." For Air Force projects, perform risk assessment in accordance with
ETL 07-06, "Risk Assessment Procedures for Recycling Portland Cement
Concrete (PCC) Suffering From Alkali-Silica Reaction (ASR) in Airfield
Pavement Structures."
2.1.1.1 Aggregate Base Course
The percentage of loss of ABC coarse aggregate must not exceed 50 percent when tested in accordance with ASTM C131/C131M. Provide aggregate that contains no more than 30 percent flat and elongated particles. A flat particle is one having a ratio of width to thickness greater than 3; an elongated particle is one having a ratio of length to width greater than
3. In the portion retained on each sieve specified, the crushed aggregates must contain at least 50 percent by weight of crushed pieces having two or more freshly fractured faces determined in accordance with
ASTM D5821.
When two fractures are contiguous, the angle between planes of the fractures must be at least 30 degrees in order to count as two fractured faces. Manufacture crushed gravel from gravel particles 50 percent of which, by weight, are retained on the maximum size sieve listed in TABLE 1.
2.1.1.2 Graded-Crushed Aggregate Base Course
The percentage of loss of GCA coarse aggregate must not exceed 40 percent loss when tested in accordance with ASTM C131/C131M. Provide GCA coarse aggregate that does not exhibit a loss greater than 18 percent weighted average, at five cycles, when tested for soundness in magnesium sulfate, or
12 percent weighted average, at five cycles, when tested in sodium sulfate in accordance with ASTM C88. Provide aggregate that contains no more than
20 percent flat and elongated particles for the fraction retained on the
1/2 inch sieve nor 20 percent for the fraction passing the 1/2 inch sieve.
A flat particle is one having a ratio of width to thickness greater than 3;
an elongated particle is one having a ratio of length to width greater than
3. In the portion retained on each sieve specified, the crushed aggregate must contain at least 90 percent by weight of crushed pieces having two or more freshly fractured faces determined in accordance with ASTM D5821.
2.1.2 Fine Aggregate
Provide fine aggregates consisting of angular particles of uniform density.
2.1.2.1 Aggregate Base Course
Provide ABC fine aggregate that consists of screenings, angular sand, crushed recycled concrete fines, or other finely divided mineral matter processed or naturally combined with the coarse aggregate.
2.1.3 Gradation Requirements
Apply the specified gradation requirements to the completed base course.
Provide aggregates that are continuously well graded within the limits specified in TABLE 1. Use sieves that conform to ASTM E11.
TABLE 1. GRADATION OF AGGREGATES
Percentage by Weight Passing Square-Mesh Sieve
Sieve
TABLE 1. GRADATION OF AGGREGATES
Percentage by Weight Passing Square-Mesh Sieve
Designation No. 1 No. 2 No. 3
2 inch 100 ---- ----
1-1/2 inch 70-100 100 ----
1 inch 45-80 60-100 100
1/2 inch 30-60 30-65 40-70
No. 4 20-50 20-50 20-50
No. 10 15-40 15-40 15-40
Sieve
TABLE 1. GRADATION OF AGGREGATES
Percentage by Weight Passing Square-Mesh Sieve
Designation No. 1 No. 2 No. 3
No. 40 5-25 5-25 5-25
No. 200 0-8 0-8 0-8
NOTE 1: Particles having diameters less than 0.02 mm must not be in excess of 3 percent by weight of the total sample tested as determined in accordance with AASHTO T 88.
NOTE 2: The values are based on aggregates of uniform specific gravity.
If materials from different sources are used for the coarse and fine aggregates, test the materials in accordance with ASTM C127 and ASTM C128 to determine their specific gravities. Correct the percentages passing the various sieves as directed by the Contracting Officer if the specific gravities vary by more than 10 percent.
2.2 LIQUID LIMIT AND PLASTICITY INDEX
Apply liquid limit and plasticity index requirements to the completed course and to any component that is blended to meet the required gradation. The portion of any component or of the completed course passing the No. 40 sieve must be either nonplastic or have a liquid limit not greater than 25 and a plasticity index not greater than 5.
2.3 TESTS, INSPECTIONS, AND VERIFICATIONS
2.3.1 Initial Tests
Perform one of each of the following tests, on the proposed material prior to commencing construction, to demonstrate that the proposed material meets all specified requirements when furnished. Complete this testing for each source if materials from more than one source are proposed.
a. Sieve Analysis [including 0.02 mm material].
b. Liquid limit and plasticity index.
c. Moisture-density relationship.
d. Wear.
2.3.2 Approval of Material
Tentative approval of material will be based on initial test results.
PART 3 EXECUTION
3.4 PREPARATION OF UNDERLYING COURSE OR SUBGRADE
Clean the underlying course or subgrade of all foreign substances prior to constructing the base course(s). Construct the surface of the underlying course or subgrade to meet specified compaction and surface tolerances.
Correct ruts or soft yielding spots in the underlying courses, areas having inadequate compaction, and deviations of the surface from the specified requirements set forth herein by loosening and removing soft or unsatisfactory material and adding approved material, reshaping to line and grade, and recompacting to specified density requirements. Do not allow traffic or other operations to disturb the finished underlying course and maintain in a satisfactory condition until the base course is placed.
3.5 GRADE CONTROL
Provide a finished and completed base course conforming to the lines, grades, and cross sections shown. Place line and grade stakes as necessary for control.
3.6 MIXING AND PLACING MATERIALS
Mix the coarse and fine aggregates in a stationary plant. Make adjustments in mixing procedures or in equipment, as directed, to obtain true grades, to minimize segregation or degradation, to obtain the required water content, and to insure a satisfactory base course meeting all requirements of this specification. Place the mixed material on the prepared subgrade or subbase in layers of uniform thickness with an approved spreader. Place the layers so that when compacted they will be true to the grades or levels required with the least possible surface disturbance. Where the base course is placed in more than one layer, clean the previously constructed layers of loose and foreign matter by sweeping with power sweepers, power brooms, or hand brooms, as directed. Make adjustments in placing procedures or equipment as may be directed by the Contracting Officer to obtain true grades, to minimize segregation and degradation, to adjust the water content, and to insure an acceptable base course.
3.7 LAYER THICKNESS
Compact the completed base course to the thickness indicated. No individual layer may be thicker than 6 inches nor be thinner than 3 inches in compacted thickness. Compact the base course(s) to a total thickness that is within
1/2 inch of the thickness indicated. Where the measured thickness is more than 1/2 inch deficient, correct such areas by scarifying, adding new material of proper gradation, reblading, and recompacting as directed.
Where the measured thickness is more than 1/2 inch thicker than indicated, the course will be considered as conforming to the specified thickness requirements. The average job thickness will be the average of all thickness measurements taken for the job and must be within 1/4 inch of the thickness indicated.
3.8 COMPACTION
Compact each layer of the base course, as specified, with approved compaction equipment. Maintain water content during the compaction procedure to within plus or minus 2 percent of the optimum water content determined from laboratory tests as specified in this Section.
Begin rolling at the outside edge of the surface and proceed to the center, overlapping on successive trips at least one-half the width of the roller.
Slightly vary the length of alternate trips of the roller. Adjust speed of the roller as needed so that displacement of the aggregate does not occur.
Compact mixture with hand-operated power tampers in all places not accessible to the rollers. Continue compaction until each layer is compacted through the full depth to at least 95 percent of laboratory maximum density. Make such adjustments in compacting or finishing procedures as may be directed by the Contracting Officer to obtain true grades, to minimize segregation and degradation, to reduce or increase water content, and to ensure a satisfactory base course. Remove any materials found to be unsatisfactory and replace with satisfactory material or rework, as directed, to meet the requirements of this specification.
3.11 FINISHING
Finish the surface of the top layer of base course after final compaction by cutting any overbuild to grade and rolling with a steel-wheeled roller.
Do not add thin layers of material to the top layer of base course to meet grade. If the elevation of the top layer of base course is 1/2 inch or more below grade, scarify the top layer to a depth of at least 3 inches and blend new material in and compact to bring to grade. Make adjustments to rolling and finishing procedures as directed by the Contracting Officer to minimize segregation and degradation, obtain grades, maintain moisture content, and insure an acceptable base course. Should the surface become rough, corrugated, uneven in texture, or traffic marked prior to completion, scarify the unsatisfactory portion and rework and recompact it or replace as directed.
3.12 SMOOTHNESS TEST
Construct the top layer so that the surface shows no deviations in excess of 3/8 inch when tested with a 12 foot straightedge. Take measurements in successive positions parallel to the centerline of the area to be paved.
3.13 FIELD QUALITY CONTROL
3.14 TRAFFIC
Do not allow traffic on the completed base course. Do not allow heavy equipment on the completed base course except when necessary for construction. When it is necessary for heavy equipment to travel on the completed base course, protect the area against marring or damage to the completed work.
3.15 MAINTENANCE
Maintain the base course in a satisfactory condition until the full pavement section is completed and accepted. Immediately repair any defects and repeat repairs as often as necessary to keep the area intact.
Retest any base course that was not paved over prior to the onset of winter to verify that it still complies with the requirements of this specification. Rework or replace any area of base course that is damaged as necessary to comply with this specification.
3.16 DISPOSAL OF UNSATISFACTORY MATERIALS
Dispose of any unsuitable materials that have been removed as directed. No additional payments will be made for materials that have to be replaced.
SECTION 32 12 16
HOT-MIX ASPHALT (HMA) FOR ASPHALTIC PAVEMENTS
08/09
PART 1 GENERAL
1.1 UNIT PRICES
1.1.1 Method of Measurement
The amount paid for will material shall be a fixed price.
1.2 REFERENCES
The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the
AMERICAN ASSOCIATION OF STATE HIGHWAY AND TRANSPORTATION OFFICIALS
(AASHTO)
AASHTO M 156 (2013; R 2017) Standard Specification for
Requirements for Mixing Plants for
Hot-Mixed, Hot-Laid Bituminous Paving
Mixtures
AASHTO M 320 (2017) Standard Specification for
Performance-Graded Asphalt Binder
AASHTO T 304 (2011; R 2015) Standard Method of Test for
Uncompacted Void Content of Fine Aggregate
ASPHALT INSTITUTE (AI)
AI MS-2 (2015) Asphalt Mix Design Methods
AI MS-22 (2001; 2nd Ed) Construction of Hot-Mix
Asphalt Pavements
AI SP-2 (2001; 3rd Ed) Superpave Mix Design
ASTM INTERNATIONAL (ASTM)
ASTM C117 (2017) Standard Test Method for Materials
Finer than 75-um (No. 200) Sieve in
Mineral Aggregates by Washing
ASTM C127 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and
Absorption of Coarse Aggregate
ASTM C128 (2015) Standard Test Method for Density, Relative Density (Specific Gravity), and
Absorption of Fine Aggregate
ASTM C131/C131M (2014) Standard Test Method for Resistance to Degradation of Small-Size Coarse
Aggregate by Abrasion and Impact in the Los
Angeles Machine
ASTM C136/C136M (2014) Standard Test Method for Sieve
Analysis of Fine and Coarse Aggregates
ASTM C142/C142M (2017) Standard Test Method for Clay Lumps and Friable Particles in Aggregates
ASTM C29/C29M (2017a) Standard Test Method for Bulk
Density ("Unit Weight") and Voids in
Aggregate
ASTM C566 (2013) Standard Test Method for Total
Evaporable Moisture Content of Aggregate by Drying
ASTM C88 (2018) Standard Test Method for Soundness of
Aggregates by Use of Sodium Sulfate or
Magnesium Sulfate
ASTM D140/D140M (2016) Standard Practice for Sampling
Asphalt Materials
ASTM D1461 (2017) Standard Test Method for Moisture or Volatile Distillates in Asphalt Mixtures
ASTM D2041/D2041M (2011) Theoretical Maximum Specific Gravity and
Density of Bituminous Paving Mixtures
ASTM D2172/D2172M (2017; E 2018) Standard Test Methods for
Quantitative Extraction of Asphalt Binder from
Asphalt Mixtures
ASTM D2419 (2014) Sand Equivalent Value of Soils and Fine
Aggregate
ASTM D242/D242M (2009; R 2014) Mineral Filler for
Bituminous Paving Mixtures
ASTM D2489/D2489M (2016) Standard Test Method for Estimating Degree of Particle Coating of Asphalt Mixtures
ASTM D2726/D2726M (2017) Standard Test Method for Bulk
Specific Gravity and Density of
Non-Absorptive Compacted Bituminous
Mixtures
ASTM D2950/D2950M (2014) Density of Bituminous Concrete in Place by Nuclear Methods
ASTM D3381/D3381M (2018) Standard Specification for Viscosity-
Graded Asphalt Binder for Use in Pavement
Construction
ASTM D3665 (2012; R 2017) Standard Practice for Random
Sampling of Construction Materials
ASTM D3666 (2016) Standard Specification for Minimum
Requirements for Agencies Testing and Inspecting
Road and Paving Materials
ASTM D4125/D4125M (2010) Asphalt Content of Bituminous
Mixtures by the Nuclear Method
ASTM D4791 (2010) Flat Particles, Elongated Particles, or
Flat and Elongated Particles in Coarse Aggregate
ASTM D4867/D4867M (2009; R 2014) Effect of Moisture on
Asphalt Concrete Paving Mixtures
ASTM D5444 (2015) Mechanical Size Analysis of
Extracted Aggregate
ASTM D6307 (2019) Standard Test Method for Asphalt
Content of Asphalt Mixture by Ignition
ASTM D6926 (2016) Standard Practice for Preparation of Asphalt Mixture Specimens Using
Marshall Apparatus
ASTM D6927 (2015) Standard Test Method for Marshall
Stability and Flow of Bituminous Mixtures
ASTM D946/D946M (2015) Penetration-Graded Asphalt Cement for Use in Pavement Construction
1.2 SUBMITTALS
SD-03 Product Data
Mix Design
Quality Control
Material Acceptance
Percent Payment
SD-04 Samples
Asphalt Cement Binder Aggregates
SD-06 Test Reports Aggregates
QC Monitoring
SD-07 Certificates
Asphalt Cement Binder
Testing Laboratory
1.3 ENVIRONMENTAL REQUIREMENTS
Do not place the hot-mix asphalt upon a wet surface or when the surface temperature of the underlying course is less than specified in Table 3. The temperature requirements may be waived by the Contracting Officer, if requested; however, meet all other requirements, including compaction.
PART 2 PRODUCTS
2.1 SYSTEM DESCRIPTION
Perform the work consisting of pavement courses composed of mineral aggregate and asphalt material heated and mixed in a central mixing plant and placed on a prepared course. HMA designed and constructed in accordance with this section shall conform to the lines, grades, thicknesses, and typical cross sections indicated. Construct each course to the depth, section, or elevation required by the drawings and roll, finish, and approve it before the placement of the next course.
2.1.1 Asphalt Mixing Plant
Plants used for the preparation of hot-mix asphalt shall conform to the requirements of AASHTO M 156 with the following changes:
2.1.1.1 Truck Scales
Weigh the asphalt mixture on approved, certified scales at the
Contractor's expense. Inspect and seal scales at least annually by an approved calibration laboratory.
2.1.1.2 Testing Facilities
Provide laboratory facilities at the plant for the use of the
Government's acceptance testing and the Contractor's quality control testing.
2.1.2 Hauling Equipment
Provide trucks for hauling hot-mix asphalt having tight, clean, and smooth metal beds. To prevent the mixture from adhering to them, the truck beds shall be lightly coated with a minimum amount of paraffin oil, lime solution, or other approved material. Petroleum based products shall not be used as a release agent. Each truck shall have a suitable cover to protect the mixture from adverse weather. When necessary to ensure that the mixture will be delivered to the site at the specified temperature, truck beds shall be insulated or heated and covers (tarps) shall be securely fastened.
2.1.3 Asphalt Pavers
Provide asphalt pavers which are self-propelled, with an activated screed, heated as necessary, and capable of spreading and finishing courses of hot-mix asphalt which will meet the specified thickness, smoothness, and grade. The paver shall have sufficient power to propel itself and
Table 3. Surface Temperature Limitations of Underlying Course
Mat Thickness, inches Degrees C F
3 or greater 40
Less than 3 45 the hauling equipment without adversely affecting the finished surface.
2.2 AGGREGATES
Provide aggregates consisting of crushed stone, crushed gravel, crushed slag, screenings, natural sand and mineral filler, as required. The portion of material retained on the No. 4 sieve is coarse aggregate.
The portion of material passing the No.4 sieve and retained on the No.
200 sieve is fine aggregate. The portion passing the No. 200 sieve is defined as mineral filler. Submit all aggregate test results and samples to the Contracting Officer at least 14 days prior to start of construction.
2.2.1 Coarse Aggregate
Provide coarse aggregate consisting of sound, tough, durable particles, free from films of material that would prevent thorough coating and bonding with the asphalt material and free from organic matter and other deleterious substances. All individual coarse aggregate sources shall meet the following requirements:
a. The percentage of loss shall not be greater than 40 percent after
500 revolutions when tested in accordance with ASTM C131/C131M.
b. The percentage of loss shall not be greater than 18 percent after five cycles when tested in accordance with ASTM C88 using magnesium sulfate [or 12 percent when using sodium sulfate].
c. At least 75 percent by weight of coarse aggregate shall have at least two or more fractured faces when tested in accordance with COE CRD-C
171. Fractured faces shall be produced by crushing.
d. The particle shape shall be essentially cubical and the aggregate shall not contain more than 20 percent percent, by weight, of flat and elongated particles (3:1 ratio of maximum to minimum) when tested in accordance with ASTM D4791.
e. Slag shall be air-cooled, blast furnace slag, with a compacted weight of not less than 75 lb/cu ft when tested in accordance with ASTM
C29/C29M.
f. Clay lumps and friable particles shall not exceed 0.3 percent, by weight, when tested in accordance with ASTM C142/C142M.
2.2.2 Fine Aggregate
Fine aggregate shall consist of clean, sound, tough, durable particles free from coatings of clay, silt, or any objectionable material and containing no clay balls.
a. All individual fine aggregate sources shall have a sand equivalent value not less than 45 when tested in accordance with ASTM
D2419.
b. The fine aggregate portion of the blended aggregate shall have an uncompacted void content not less than 45.0 percent when tested in accordance with AASHTO T 304 Method A.
c. The quantity of natural sand (noncrushed material) added to the aggregate blend shall not exceed 25 percent by weight of total aggregate.
d. Clay lumps and friable particles shall not exceed 0.3 percent, by weight, when tested in accordance with ASTM C142/C142M
2.2.3 Mineral Filler
Mineral filler shall be nonplastic material meeting the requirements of
ASTM D242/D242M.
2.2.4 Aggregate Gradation
The combined aggregate gradation shall conform to gradations specified in Table 4, when tested in accordance with ASTM C136/C136M and ASTM
C117, and shall not vary from the low limit on one sieve to the high limit on the adjacent sieve or vice versa, but grade uniformly from coarse to fine.
Table 4. Aggregate Gradations
Sieve Size, inch Gradation 1 Percent
Passing by Mass
Gradation 2 Percent
Passing by Mass
Gradation 3 Percent
Passing by Mass
1 100 --- ---
3/4 76-96 100 ---
1/2 68-88 76-96 100
3/8 60-82 69-89 76-96
No. 4 45-67 53-73 58-78
No. 8 32-54 38-60 40-60
No. 16 22-44 26-48 28-48
No. 30 15-35 18-38 18-38
No. 50 9-25 11-27 11-27
No. 100 6-18 6-18 6-18
2.3 ASPHALT CEMENT BINDER
Submit a 5 gallon sample for mix design verification. Asphalt cement binder shall conform to AASHTO M 320 Performance Grade (PG). Test data indicating grade certification shall be provided by the supplier at the time of delivery of each load to the mix plant. Submit copies of these certifications to the Contracting Officer. The supplier is defined as the last source of any modification to the binder. The Contracting
Officer may sample and test the binder at the mix plant at any time before or during mix production. Obtain samples for this verification testing in accordance with ASTM D140/D140M and in the presence of the
Contracting Officer.
Furnish these samples to the Contracting Officer for the verification testing, which shall be at no cost to the Contractor. Submit samples of the asphalt cement specified for approval not less than 14 days before start of the test section. Submit copies of certified test data, amount, type and description of any modifiers blended into the asphalt cement binder.
2.3 MIX DESIGN
a. Develop the mix design. The asphalt mix shall be composed of a mixture of well-graded aggregate, mineral filler if required, and asphalt material. The aggregate fractions shall be sized, handled in separate size groups, and combined in such proportions that the resulting mixture meets the grading requirements of the job mix formula
(JMF). Submit proposed JMF; do not produce hot-mix asphalt for payment until a JMF has been approved. The hot-mix asphalt shall be designed in accordance with Marshall (MS-02) or Hveem (MS-02) procedures and the criteria shown in Table 5.
2.4.1 JMF Requirements
Submit in writing the job mix formula for approval at least 14 days prior to the start of the test section including as a minimum:
a. Percent passing each sieve size.
b. Percent of asphalt cement.
c. Percent of each aggregate and mineral filler to be used.
d. Asphalt viscosity grade, penetration grade, or performance grade.
e. Number of blows of hand-held hammer per side of molded specimen.
(NA for Superpave)
f. Laboratory mixing temperature.
No. 200 3-6 3-6 3-6
g. Lab compaction temperature.
h. Temperature-viscosity relationship of the asphalt cement.
i. Specific gravity and absorption of each aggregate.
j. Percent natural sand.
k. Percent particles with 2 or more fractured faces (in coarse aggregate).
l. Fine aggregate angularity.
m. Percent flat or elongated particles (in coarse aggregate).
n. Tensile Strength Ratio (TSR).
o. Antistrip agent (if required) and amount.
p. List of all modifiers and amount.
q. Percentage and properties (asphalt content, binder properties, and aggregate properties) of reclaimed asphalt pavement (RAP) in accordance with paragraph RECYCLED HOT-MIX ASPHALT, if RAP is used.
2.4 RECYCLED HOT MIX ASPHALT
Recycled HMA shall consist of reclaimed asphalt pavement (RAP), coarse aggregate, fine aggregate, mineral filler, and asphalt cement to produce a consistent gradation and asphalt content and properties. When RAP is fed into the plant, the maximum RAP chunk size shall not exceed 2 inches. Design the recycled HMA mix using procedures contained in AI MS-2 and
AI MS-22. The job mix shall meet the requirements of paragraph MIX DESIGN.
The amount of RAP shall not exceed 30 percent.
2.4.1 RAP Aggregates and Asphalt Cement
The blend of aggregates used in the recycled mix shall meet the requirements of paragraph AGGREGATES. Establish the percentage of asphalt in the RAP for the mixture design according to ASTM D2172/D2172M or
ASTM D6307 using the appropriate dust correction procedure.
3.1 PREPARATION OF ASPHALT BINDER MATERIAL
Heat the asphalt cement material avoiding local overheating and providing a continuous supply of the asphalt material to the mixer at a uniform temperature. The temperature of unmodified asphalts shall be no more than
325 degrees F when added to the aggregates.
3.2 PREPARATION OF MINERAL AGGREGATE
Table 5. Mix Design Criteria
Test Property 50 Blows or Mix
Gyrations
75 Blows or Mix
Gyrations
Stability, N pounds, minimum (NA for
Superpave)
*44501000 *80001800
Flow, 0.01 inch, (NA for Superpave) 8-18 8-16
Air voids, percent 3-5 3-5
Percent Voids in mineral aggregate
(VMA),(minimum)
Gradation 1 13.0 13.0
Gradation 2 14.0 14.3
Gradation 3 15.0 15.0
TSR, minimum percent 75 75
* This is a minimum requirement. The average during construction shall be significantly higher than this number to ensure compliance with the specifications.
** Calculate VMA in accordance with AI MS-2, based on ASTM C127 and ASTM C128 bulk specific gravity for the aggregate.
Heat and dry the aggregate for the mixture prior to mixing. No damage shall occur to the aggregates due to the maximum temperature and rate of heating used. The temperature of the aggregate and mineral filler shall not exceed 350 degrees F when the asphalt cement is added. The temperature shall not be lower than is required to obtain complete coating and uniform distribution on the aggregate particles and to provide a mixture of satisfactory workability.
3.3 PREPARATION OF HOT-MIX ASPHALT MIXTURE
The aggregates and the asphalt cement shall be weighed or metered and introduced into the mixer in the amount specified by the JMF. Mix the combined materials until the aggregate obtains a uniform coating of asphalt binder and is thoroughly distributed throughout the mixture. Wet mixing time shall be the shortest time that will produce a satisfactory mixture, but no less than 25 seconds for batch plants. Establish the wet mixing time for all plants based on the procedure for determining the percentage of coated particles described in ASTM D2489/D2489M, for each individual plant and for each type of aggregate used. The wet mixing time will be set to at least achieve 95 percent of coated particles. The moisture content of all hot-mix asphalt upon discharge from the plant shall not exceed
0.5 percent by total weight of mixture as measured by ASTM D1461.
3.1 PREPARATION OF THE UNDERLYING SURFACE
Immediately before placing the hot mix asphalt, clean the underlying course of dust and debris. Apply a prime coat and/or tack coat in accordance with the contract specifications.
3.6 TRANSPORTING AND PLACING
3.7.1 Transporting
Transport the hot-mix asphalt from the mixing plant to the site in clean, tight vehicles. Schedule deliveries so that placing and compacting of mixture is uniform with minimum stopping and starting of the paver.
Provide adequate artificial lighting for night placements. Hauling over freshly placed material will not be permitted until the material has been compacted as specified, and allowed to cool to 140 degrees F. To deliver mix to the paver, use a material transfer vehicle operated to produce continuous forward motion of the paver.
3.7.1 Placing
Place and compact the mix at a temperature suitable for obtaining density, surface smoothness, and other specified requirements. Upon arrival, place the mixture to the full width by an asphalt paver; it shall be struck off in a uniform layer of such depth that, when the work is completed, it will have the required thickness and conform to the grade and contour indicated. Regulate the speed of the paver to eliminate pulling and tearing of the asphalt mat.
Unless otherwise permitted, placement of the mixture shall begin along the centerline of a crowned section or on the high side of areas with a one-way slope. Place the mixture in consecutive adjacent strips having a minimum width of 10 feet. On isolated areas where irregularities or unavoidable obstacles make the use of mechanical spreading and finishing equipment impractical, the mixture may be spread and luted by hand tools.
3.8 COMPACTION OF MIXTURE
After placing, the mixture shall be thoroughly and uniformly compacted by rolling. Compact the surface as soon as possible without causing displacement, cracking or shoving. The sequence of rolling operations and the type of rollers used shall be at the discretion of the Contractor.
The speed of the roller shall, at all times, be sufficiently slow to avoid displacement of the hot mixture and be effective in compaction. Any displacement occurring as a result of reversing the direction of the roller, or from any other cause, shall be corrected at once. Furnish sufficient rollers to handle the output of the plant. Continue rolling until the surface is of uniform texture, true to grade and cross section, and the required field density is obtained. To prevent adhesion of the mixture to the roller, keep the wheels properly moistened but excessive water will not be permitted. In areas not accessible to the roller, the mixture shall be thoroughly compacted with hand tampers. Any mixture that becomes loose and broken, mixed with dirt, contains check-cracking, or is in any way defective shall be removed full depth, replaced with fresh hot mixture and immediately compacted to conform to the surrounding area. This work shall be done at the
Contractor's expense. Skin patching will not be allowed.
3.10 QUALITY CONTROL
3.10.1 General Quality Control Requirements
Develop and submit an approved Quality Control Plan. Submit aggregate and QC test results. Do not produce hot-mix asphalt for payment until the quality control plan has been approved addressing all elements which affect the quality of the pavement including, but not limited to:
a. Mix Design
b. Aggregate Grading
c. Quality of Materials
d. Stockpile Management
e. Proportioning
f. Mixing and Transportation
g. Mixture Volumetrics
h. Moisture Content of Mixtures
i. Placing and Finishing
j. Joints
k. Compaction
l. Surface Smoothness
3.10.2 Quality Control Testing
Perform all quality control tests applicable to these specifications and as set forth in the Quality Control Program. The testing program shall include, but shall not be limited to, tests for the control of asphalt content, aggregate gradation, temperatures, aggregate moisture, and moisture in the asphalt mixture, laboratory air voids, stability, flow, in-place density, grade and smoothness. Develop a Quality Control Testing Plan as part of the
Quality Control Program.
3.10.3.1 Gradation
Determine aggregate gradations a minimum of twice per lot from mechanical analysis of recovered aggregate in accordance with ASTM D5444. When asphalt content is determined by the ignition oven or nuclear method, aggregate gradation shall be determined from hot bin samples on batch plants, or from the cold feed on drum mix plants. For batch plants, test aggregates in accordance with ASTM C136/C136M using actual batch weights to determine the combined aggregate gradation of the mixture.
3.10.3.2 Additional Testing
Any additional testing, which the Contractor deems necessary to control the process, may be performed at the Contractor's option.
3.10.3.3 QC Monitoring
Submit all QC test results to the Contracting Officer on a daily basis as the tests are performed. The Contracting Officer reserves the right to monitor any of the Contractor's quality control testing and to perform duplicate testing as a check to the Contractor's quality control testing.
3.10.4 Sampling
When directed by the Contracting Officer, sample and test any material which appears inconsistent with similar material being produced, unless such material is voluntarily removed and replaced or deficiencies corrected by the
Contractor. All sampling shall be in accordance with standard procedures specified.
3.11 MATERIAL ACCEPTANCE
Testing for acceptability of work will be performed by an independent laboratory hired by the Contractor. Forward test results to the Contracting
Officer. Acceptance of the plant produced mix and in-place requirements will be on a lot to lot basis. A standard lot for all requirements will be equal to 2000 short tons.
3.11.1 Additional Sampling and Testing
The Contracting Officer reserves the right to direct additional samples and tests for any area which appears to deviate from the specification requirements.
3.11.2 Grade
The final wearing surface of pavement shall conform to the elevations and cross sections shown and shall vary not more than 0.05 foot from the plan grade established and approved at site of work. Finished surfaces at juncture with other pavements shall coincide with finished surfaces of abutting pavements. Deviation from the plan elevation will not be permitted in areas of pavements where closer conformance with planned elevation is required for the proper functioning of drainage and other appurtenant structures involved.
The grade will be determined by running lines of levels at intervals of 25 feet, or less, longitudinally and transversely, to determine the elevation of the completed pavement surface. Within 5 working days, after the completion of a particular lot incorporating the final wearing surface, test the final wearing surface of the pavement for conformance with the specified plan grade.
3.11.1 Surface Smoothness
Use one of the following methods to test and evaluate surface smoothness of the pavement. Perform all testing in the presence of the Contracting Officer.
Keep detailed notes of the results of the testing and furnish a copy to the Government immediately after each day's testing. Where drawings show required deviations from a plane surface (crowns, drainage inlets, etc.), the surface shall be finished to meet the approval of the Contracting Officer.
3.11.1.1 Smoothness Requirements
3.11.1.1.1 Straightedge Testing
The finished surfaces of the pavements shall have no abrupt change of 1/4 inch or more, and all pavements shall be within the tolerances of 1/4 inch in both the longitudinal and transverse directions, when tested with an approved 12 feet straightedge.
3.11.4.2.1 Straightedge Testing
Hold the straightedge in contact with the surface and move it ahead one-half the length of the straightedge for each successive measurement.
Determine the amount of surface irregularity by placing the freestanding
(unleveled) straightedge on the pavement surface and allowing it to rest upon the two highest spots covered by its length, and measuring the maximum gap between the straightedge and the pavement surface in the area between these two high points.
SECTION 32 17 23
PAVEMENT MARKINGS
08/16
1.1.1 Measurement
1.1.1.1 Pavement Striping and Markings
The unit of measurement for pavement markings is the number of square feet of striping or markings actually completed and accepted by the Contracting
Officer.
1.1.1.1 Raised Pavement Markers
The unit of measurement for raised pavement markers is the number actually placed as specified and approved by the Contracting Officer.
1.1.1.2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .