Attachment 2 SOW .pdf

PDF 97 KB Posted

Attached to
INSTALL BOILER, FORT COLLINS, CO Federal contract opportunity
Solicitation number
12805B20Q0100
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

View the file

Other files for this federal contract opportunity

Other files attached to INSTALL BOILER, FORT COLLINS, CO, newest first.
File Type Posted
Sol_12805B20Q0100_Amd_0002.pdf PDF
Sol_12805B20Q0100_Amd_0001.pdf PDF
Sol_12805B20Q0133_Amd_0001.pdf PDF
Sol_12805B20Q0100.pdf PDF
Attachment 3 Mechanical drawing boiler room 63.pdf PDF
Attachment 1 Wage Determination CO20190024.pdf PDF
Attachment 6 ARS-372.pdf PDF
Attachment 4 Roof Architectural drawing over boiler room 63.pdf PDF
Attachment 5 ARS-371.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work Connection of Existing Hot Water Boiler #2 at Crops Research Laboratory

Overview: This project is to complete the installation of the Hamilton EVO Boiler at the Crops Research Laboratory located at 1701 Centre Ave, Fort Collins CO 80526. This unit is located in the east Boiler room.

Scope of Work:

All labor and materials to:

1) Remove the existing 2” natural gas service to the two Hamilton heating water boilers and replace with a 3” service inclusive of 3” natural gas regulator, approximately 16’.

2) Rework hydronic piping to HWB #1 & 2 to allow for boiler #2 to be moved approximately 2” north by the installation of two RFSO flanges in each HWS and HWR boiler headers. Pipes may be removed from site to allow for the installation of flanges.

3) Furnish and install 8” CPVC schedule 80 boiler flue to atmosphere for HWB#2.

4) Furnish and install 8” air intake flue for HWB#2 from atmosphere outside of boiler room. Duct material to be in conformance to manufacturer’s specification.

5) Intake and exhaust flues to routed thru existing intake penetration on NW side of roof, work consists of removing existing damper and above roof deck intake ductwork, install new sheet metal covered plywood over penetration.

6) See attached floor plan and roof plan for locations of connections and equipment.

7) Commission boiler and verify operation controls of HWB #1 to HWB#2 and back.

8) Start up Boiler #2 with Boiler #1 manually off.