SKULL VALLEY SHADED FUEL BREAK PHASE 3 Federal contract opportunity
Solicitation number
140L6424Q0008
Issued by
Department of the Interior Bureau of Land Management Arizona Region

About this file

This statement of work and related solicitation describe a mechanical thinning project on Bureau of Land Management land in Arizona. The Bureau of Land Management seeks a contractor to manually thin approximately 50 acres in the Skull Valley area using chainsaws. Work must be completed between September 2024 and March 2025. The contractor will cut specified vegetation and pile materials according to guidelines. The selected contractor must furnish all necessary equipment and maintain work sites and camps. The statement of work provides operational details including work hours, cultural resource requirements, and specifications for equipment, fire prevention, and project scheduling. The related solicitation identifies this as opportunity 140L6424Q0008 for mechanical thinning of 50 acres in Skull Valley's Phase 3 shaded fuel break project through the Department of the Interior Bureau of Land Management Arizona Region.

View the file

Other files for this federal contract opportunity

Other files attached to SKULL VALLEY SHADED FUEL BREAK PHASE 3, newest first.
File Type Posted
Sol_140L6424Q0008_Amd_0001.pdf PDF
B09_Questions_Answers_0001.pdf PDF
Sol_140L6424Q0008.pdf PDF
Attachment_3_Value_Bid_Schedule.docx DOCX document
B03_Attachment_4_Wage_Determination.pdf PDF
Attachment_1_Combined_Synopsis_and_Solicitation_A1.pdf PDF
B08_Attachment_5__Contract_Clauses___Provisions.docx DOCX document
Attachment_6_Instructions_and_Evaluation_Criteria.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bureau of Land Management Skull Valley (Phase )

2023 Fuel Break Statement of Work

Purpose: The purpose of this order is to secure the services for mechanical (Chainsaw) of approximately 50 acres of chaparral communities within the Skull Valley unit near the communities of Skull Valley and Wilhiot, AZ (see attached map).

Vegetation: The primary plant community found within the Planning Area is Interior Chaparral.

The vegetation is dominated by shrubs with small, thick, evergreen leaves and wide-spreading, deep root systems. Historic fire was an important component of the ecosystem (Pase and Brown 1982a). As such, the shrubs are well adapted to fire and reproduce readily from heat-scarified seed that is stored in soil for decades. Some species readily sprout from root crowns after fire.

The dense compacted leafy growths of the shrubs are naturally flammable, which leads to a high fire hazard. The eastern portions of the planning area are dominated by bunch grass species, including side oats grama, ring muhly, black grama, and squirrel tail. Shrubs include snakeweed, Apache plume, and barberry. The western and rolling hill portions of the planning area are dominated by Sonoran scrub oak and catclaw mimosa. Shrub cover in the western portion of the planning area is nearly contiguous in many of the upland areas, particularly along north and western facing slopes. Other shrubs include desert ceanothus, snakeweed, and fairy duster.

Location: Work under contract is in Yavapai County, State of Arizona, as shown on location map. Project is located east and southeast of Skull Valley, northeast of Kirkland, Arizona, and northwest of Wilhoit, Arizona.

Access to the Work:

Project site is accessible in dry conditions with two-wheel drive, high clearance vehicle. In wet conditions four-wheel drive high clearance vehicle may be needed. Absolutely NO motorized travel will be authorized with-in the project site.

Site Tour: Prospective contractors are encouraged to conduct a site tour prior to submitting a bid.

Description of Work: The work shall be manual (chainsaw) of approximately 50 acres on mostly rolling hills and washes. Contractor will furnish all equipment to complete thinning project.

Specifics area as follows:

The BLM will mark the treatment area boundary with orange-ribbon flagging.

The BLM will flag areas within the treatment boundary where treatment is not allowed with pink-ribbon and or blue-ribbon flagging. The contractor will not treat or enter these areas.

No treatment will occur outside the marked treatment area.

Standing dead will be treated.

All brush is to be flush cut and piled:

All tree species 6- inches (DBH) and below will be flush cut and piled:

All tree species greater than 6-inches (DBH) and above will be limbed up to shoulder height.

No piles will be within 50-feet of the forest Boundary.

No piles will be constructed under the canopy of mature trees.

Whenever possible piles will be constructed with smaller materials (brush) underneath larger branches.

Piles not to exceed 8’x 8’ x 6’. Piles will be stacked on remaining stumps where possible.

Cut trees will not have stumps left exceeding six inches (6”) above the ground.

Off road vehicle travel is NOT permitted on this treatment The BLM may temporarily suspend work during periods of high fire danger.

The BLM may temporarily suspend work to mitigate concerns regarding migratory birds.

The BLM may temporarily suspend work to mitigate concerns regarding weather.

The BLM may temporarily suspend work to mitigate concerns regarding safety.

Complete work by 3/31/25.

Surface Conditions: Motorized vehicles shall not be operated on access roads when soil becomes wet, and the vehicle causes a three inch or greater rut. If such conditions are encountered, the Contractor shall stop work and notify the Contracting Officer or Contracting Officers Representative.

Terrain: Slope: The project area generally consists of rolling slopes no greater than 50% and may have loose footing.

Access to Work Site: Public or private access roads damaged by the contractor shall be restored, at the contractors’ expense, to the same condition they were in at the commencement of work.

Project Layout: The Government will flag or otherwise define areas to be treated by this Contract, as identified above. The Contractor is required to protect all section corners, benchmarks, and other markers and stakes. In case of destruction or removal by the contractor, they will be replaced by the Government and actual cost for replacement will be deducted from payment due the Contractor. The Contractor shall also avoid areas flagged in pink-ribbon flagging by the Government to preserve historical, archaeological, paleontological, wilderness, or other resources.

Cultural Considerations: Because cultural resources may be present in the area, project activities and any other action which causes disturbance of the earth’s surface shall be limited to those areas approved by the BLM. Deviations from routes flagged or shown on the drawings are not allowable without prior written approval of the Contracting Officer. The Contractor shall insure that he/she, employees, or representatives do not collect or disturb historic or prehistoric artifacts in accordance with the Archaeological Resources Protection Act (43 CFR 7). Should the condition of the cultural resources in the area be altered during construction due to unauthorized activity by the Contractor or his employees, the Contractor shall be responsible for all costs of mitigating the cultural resources involved. If deterioration of the archeological sites is found to be occurring during the construction phase, work on the project shall be terminated until a data recovery plan is prepared and completed in accordance with the National Historic Preservation Act (36 CFR 800). The Contractor shall immediately bring to the attention of the Contracting Officer all cultural resources including, but not limited to, historic and prehistoric sites or artifacts, buried artifacts, and buried features such as fire pits, burials, and house floors discovered as a result of drilling operations. The Contractor shall immediately suspend all activities in the immediate vicinity that might harm the object(s), notify the Contracting Officer, and shall leave such discoveries intact until instructed to proceed by the Contracting Officer.

Work Camps: The location of any work camps established by the contractor must be approved in advance by the Contracting Officer. Contractor shall maintain the camp in a sanitary, orderly manner, and upon vacating the camp, remove refuse and any other signs of occupancy. In the equipment maintenance area, special precaution shall be taken to contain spilled fuel, lubricants, and wash water.

Work Hours: Operations shall be permitted only during daylight hours unless additional working hours are authorized by the Contracting Officer.

CONTRACTOR PROVIDED EQUIPMENT

General: Contractor shall furnish at the worksite all equipment, labor, supplies, and materials required to complete the work within the specified performance time. The Contractor shall service and maintain such equipment as necessary to maintain satisfactory progress on the work.

Motor Vehicles: The Contractor shall finish motor vehicles for hauling equipment and personnel to the worksite.

Fire Prevention/Suppression: Contractor Shall:

Ensure all equipment diesel and/or gas engines are equipped with an approved spark arrester.

Spark arresters shall meet the requirements of the U.S. Forest Service Spark Arrester Guide, dated May 1985.

Have one shovel and a minimum of one 10-pound ABC fire extinguisher available.

Government furnished Property and Service: The BLM will:

Supply geo-referenced maps depicting project area.

The Government will flag or otherwise define areas to be treated by this Contract. The

Contractor is required to protect all section corners, benchmarks, and other markers and stakes. In case of destruction or removal by the contractor, they will be replaced by the Government and actual cost for replacement will be deducted from payment due the

Contractor. The Contractor shall also avoid areas flagged in orange flagging by the Government to preserve historical, archaeological, paleontological, wilderness, or other resources.

SEQUENCING AND SCHEDULING:

Work Schedule: The schedule shall be submitted at the pre-work conference. When requested, the Contractor shall submit an updated schedule within three (3) calendar days.

Start Date: Tentative start of work is upon award of contract

Performance Period: Work must start on or before September 1, 2024 and complete work by March 29, 2025.

Pre-work Conference: A pre-work conference will be held prior to the start of work. The Contractor will be notified in advance of meeting time, date and place. The purpose will be to review required work, project drawings and specifications, construction schedules, payroll and payments, and administrative provisions of the contract.

The Contractor, subcontractors, and the persons responsible for coordination of the work shall be present at the meeting.

The Contractor shall be prepared to summarize and explain procedures planned for the project.

Final Inspection: The meeting shall be held at the project site, or as determined by the Contracting Officer. The Contractor shall require his or her superintendent (if designated) to be present during the inspections. The Contractor shall correct any deficiencies noted and the project will be re-inspected by the Contracting Officer.

The Contractor shall notify the Contracting Officer, in writing, at least three (3) working days before the completion date so the Government can schedule a final inspection.

MOBILIZATION, MEASUREMENTS AND PAYMENTS

Mobilization: Includes all preparatory work and operations, including those necessary to the movement of personnel, equipment, supplies and incidentals to the project site; and for other work and operations which must be performed, or cost incurred prior to beginning work on the various items on the project site. All costs associated with mobilization will be incorporated into the cost per acre to be mowed.

Measurement and Payment: Measurement for payment for mowing will be the number of acres satisfactorily completed in accordance with these specifications. Measurements will be made from GPS Survey. Payment will be made at the unit price per acre specified in the Bid Schedule and shall include cost of all work described in these specifications. All measurements will be based on horizontal distances. Re-measurement of the acreage under this Contract will be made upon the written request of the Contractor. Request for re-measurement must be made in writing within 10 calendar days after cutting is complete. If re-measurement indicates a difference of not more than 5% from the original measurement, the Contractor shall pay the actual cost of the re-measurement. Payments will be based on the second measurement where the difference between measurements is more than 5%. Where the difference is less than 5% the results of the first measurement will be used.