This bid summary sheet and related federal contract opportunity are for a Cathedral Falls Trail Reconstruction project being conducted by the Department of Agriculture Forest Service. The bid summary sheet outlines the required line items and services for the base year of the contract, including mobilization, trailbed preparation and installation, concrete steps supply and installation, signage, parking lot improvements, and administrative building, child development facility, physical fitness center, and special cleaning services. Unit prices and totals are included for each line item. The related federal contract opportunity provides additional details on the solicitation number, name of the project, and indicates the requirement is for Cathedral Falls Trail reconditioning with more details available in the attached performance work statement and solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Performance Work Statement.pdf | ||
| Appendix 2 Trail Log GAOA Cathedral Falls Trail 12072019.pdf | ||
| 1240BF23Q0040 GAOA Cathedral Falls Trail Reconstruction.pdf | ||
| Appendix 1Drawings GAOA Cathedral Falls Trail 11162021.pdf | ||
| Appendix 3 Blasting Plans.pdf | ||
| Attachment 3 SCA WD.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BID SUMMARY SHEET
ONLY FILL OUT THE YELLOW HIGHLIGHTED CELLS THROUGHOUT THIS BID SHEET
Cathedral Falls Trail Reconstruction - GAOA Project
| SOLICITATION: 1240BF23Q0040 | |||||
| Company Name: | |||||
| Point of Contact (POC): | |||||
| CAGE Code: | |||||
| UEI Number: | |||||
| Address: | |||||
| Phone: | |||||
| E-mail: | |||||
| Fax | |||||
| Item Number | Description | Quantity | Unit of Issue | Unit Price | Total |
| 0001 | Mobilization | 1 | LS | $0.00 | |
| 0002 | Demolish and recondition Cathedral Falls trail | 1 | LS | $0.00 | |
| 0003 | Trailbed preparation and installation | 1 | LS | $0.00 | |
| 0004 | Concrete steps - supply, transport and install | 174 | EA | $0.00 | |
| 0005 | Signs | 5 | EA | $0.00 | |
| 0006 | Parking Lot Improvements | 1 | LS | $0.00 | |
| Grand Total: | $0.00 | ||||
| (a) Each (EA). One complete unit, which may consist of one or more parts. | |||||
| (b) Lump Sum (LS). The quantities that denote one complete unit of work as required by or described in the contract, including necessary materials, equipment, and labor to complete the job. |
Sheet1
| BASE YEAR | |||||||||
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | ||||
| 0002 | Category I Administrative Buildings | ||||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | |||||||||
| Period of Performance: 11 months (Base Year) | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0002AA | Category I Administrative Buildings Rest Room Cleans | 2,620,889 | sq. ft | $ 0.0408 | $ 106,932.25 | *55,026x47.63= 2,620,888.58 SF (11month period) | 55026.0041990342 | 52 | 2,861,352.22 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | 0 | 52 | 0.00 | ||||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ERROR:#VALUE! | 52 | ERROR:#VALUE! | |||
| 0002AB | Category I Administrative Buildings Hard Floor Cleans | 6,586,752 | sq. ft | $ 0.0231 | $ 152,153.97 | *94,515x47.63= 4,501,749.45 SF | 138289.986773042 | 52 | 7,191,079.31 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | 0 | 52 | 0.00 | ||||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ERROR:#VALUE! | 52 | ERROR:#VALUE! | |||
| 0002AC | Category I Administrative Buildings Carpet Floor Cleans | 1,204,420 | sq. ft | $ 0.0192 | $ 23,124.87 | *19,831x47.63= 944,550.53 SF | 25287.0098677304 | 52 | 1,314,924.51 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | $ 282,211.10 | 0 | 52 | 0.00 | |||||
| Period of Performance: 11 months (Base Year) | 0 | 52 | 0.00 | ||||||
| 0 | 52 | 0.00 | |||||||
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | 52 | 0.00 | ||
| 0003 | Category II Child Development Facilities | 52 | 0.00 | ||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | 52 | ||||||||
| Period of Performance: 11 months (Base Year). | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0003AA | Category II Child Development Facilities Hard Floor Cleans | 11,485,212 | sq. ft | $ 0.0252 | $ 289,427.35 | *390,060x238.15weeks = 9,302,139 SF | TOTAL: 11,485,212.42 SF | ||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | *7,639x285.78 weeks = 2,183,073 SF | ||||||||
| Period of Performance: 11 months (Base Year) | |||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||||||
| 0003AB | Category II Child Development Facilities Carpet Floor Cleans | 685,729 | sq. ft | $ 0.0194 | $ 13,303.14 | *1113x238.15 weeks = 265,060.95 SF | TOTAL: 685,729.11 | ||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | *1472x285.78 weeks = 420,668.16 SF | ||||||||
| Period of Performance: 11 months (Base Year) | $ 302,730.50 |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST | |||
| 0004 | Category III Physical Fitness Centers | |||||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). | ||||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | |||||
| 0004AA | Category III Physical Fitness Centers Hard Floor Cleans | 3,010,146 | sq. ft | $ 0.0344 | $ 103,549.02 | Bldg 3452(6W) 1,330,305.90 SF | 1W*Hockey 1,323x17.32 = 22,914.36 SF | 1,330,305.90 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity represents the square footage to be cleaned over an 11 month period. | Bldg 3709 (7W) 1,416,325.68 SF | 6W*Hockey 1,323x30.31= 240,600.00 SF | 1,416,325.68 | |||||
| Period of Performance: 11 months (Base Year). | 22,914.36 | |||||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | 240,600.00 | ||||
| 0004AB | Category III Continuous Cleaning Physical Fitness Center Bldg 3709 | 11 | monthly | $ 4,322.26 | $ 47,544.86 | Total Hours 1,657.05 | Provide locker room cleaning from 13:00-15:30 daily 1Male/1Female 2-1/2 hours each. | 3,010,145.94 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | ||||||||
| Period of Performance: 11 months (Base Year). |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0005 | Special /Emergency/Bio-Hazard Cleans | ||||
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. | |||||
| Period of Performance: 11 months (Base Year). | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AA | Special Cleaning | 40,538 | per sq. ft | $ 0.28 | $ 11,472.25 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 20% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). |
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AB | Emergency Cleaning | 22,296 | per sq. ft | $ 0.38 | $ 8,405.59 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Emergency Cleaning CLIN represents 11% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). | |||||
| QTY | UNIT | UNIT PRICE | TOTAL COST | ||
| 0005AC | Bio-Hazard Cleaning | 10,134 | per sq. ft | $ 1.13 | $ 11,471.69 |
| The Contractor shall furnish all supplies, equipment and services required to perform work under this contract that are not listed under Section 3 of the PWS. Technical Exhibit 1, Performance Requirements Summary, in the Performance Work Statement outlines the cleaning standards and references the specific paragraph(s) associated. The quantity of square footage reserved for the Special Cleaning CLIN represents 5% of the total square footage for the contract. | |||||
| Period of Performance: 11 months (Base Year). |
| CLIN # | DESCRIPTION | QTY | UNIT | UNIT PRICE | TOTAL COST |
| 0006 | CONTRACT MANPOWER REPORTING | 1 | EA | $ 100.0000 | $ 100.0000 |
| Contractor Manpower Reporting Costs: 1 May 2016 to 30 March 2017. The Contractor Manpower Reporting requirement is associated with the Office of the Assistant Secretary of the Army (Manpower and Reserve Affairs) requirement to obtain better visibility of the Contractor service workforce. | |||||
| The Contractor is required to enter data into the Contractor Manpower Reporting Application (CMRA) system as outlined in local information titled Contractor Manpower Reporting located with the clauses incorporated into the contract. Reporting period will be the period of performance not to exceed 12 months ending 30 September of each Government fiscal year and must be reported by 31 October of each calendar year. Data must be accurate and complete and entered into CMRA during the data gathering period of every year, or part of a year, for which the contract is in force. NOTE: If the reporting of Manpower Equivalents is not separately priced, insert “NSP in the blank shown. | |||||
| BASE YEAR TOTAL COST: | $ 767,485.01 |