Attachment 2 - Quality Assurance Surveillance Plan.docx
DOCX document 41 KB Posted
- Attached to
- X-ray diffractometer Preventative Maintenance: Utilizing FAR 6. 302-1 Authority Federal contract opportunity
- Solicitation number
- 15A00025R00000014
About this file
This is a Quality Assurance Surveillance Plan (QASP) for laboratory services and preventative maintenance of a Panalytical X-ray Diffraction instrument for the Bureau of Alcohol, Tobacco, Firearms and Explosives (ATF). The QASP outlines the systematic methods used to monitor contractor performance and ensure compliance with the Performance Work Statement (PWS) requirements.
The plan establishes roles for the Contracting Officer (CO) and Government Technical Representative (GTR), with the GTR responsible for technical administration and surveillance of contractor performance through random monitoring, 100% inspection, and periodic inspections. Performance standards require 100% compliance with no deviations across all tasks. The contractor must maintain a Quality Control Plan and submit monthly performance reports, which the GTR will review and document using standardized monitoring forms. Customer feedback and complaints will be tracked as performance indicators. The GTR will conduct regular reviews with the contractor to discuss performance evaluations, trends, and any necessary corrective actions.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 - Performance Work Statement.docx | DOCX document | |
| SF1449 - 15A00025R00000014.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
15A00025R00000014 – Attachment 2
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
Service, Preventative Maintenance, and Support Plan for Laboratory Services Panalytical X-ray Diffraction Instrument
TABLE OF CONTENTS
| 1 | INTRODUCTION | 3 |
| 1.1 | Purpose | 3 |
| 1.2 | Performance Management Approach | 3 |
| 1.3 | Performance Management Strategy | 4 |
| 2 | ROLES AND RESPONSIBILITIES | 4 |
| 2.1 | The Contracting Officer (CO) | 4 |
| 2.2 | The GTR | 4 |
| 3 | IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS | 5 |
| 4 | METHODOLOGIES TO MONITOR PERFORMANCE | 5 |
| 4.2 | Customer Feedback | 5 |
| 4.3 | Acceptable Quality Levels | 6 |
| 5 | QUALITY ASSURANCE DOCUMENTATION | 6 |
| 5.1 | The Performance Management Feedback Loop | 6 |
| 5.2 | Monitoring Forms | 6 |
| 6 | ANALYSIS OF QUALITY ASSURANCE ASSESSMENT | 6 |
| 6.1 | Determining Performance | 6 |
| 6.2 | Reporting | 6 |
| 6.3 | Reviews and Resolution | 7 |
| ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY | 8 | |
| ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM | 9 |
QUALITY ASSURANCE SURVEILLANCE PLAN (QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the performance work statement (PWS). This plan sets forth the procedures and guidelines the ATF will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and identify required documentation and resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and ensure the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of all members of the integrated project team (IPT), identifies the performance objectives, defines the methodologies used to monitor and evaluate the contractor’s performance, describes quality assurance documentation requirements, and describes the analysis of quality assurance monitoring results.
1.2 Performance Management Approach
1.2.1 The PWS structures the acquisition around what service or quality level is required, as opposed to how the contractor should perform the work (i.e., results, not compliance). This QASP will define the performance management approach taken to monitor and manage the contractor’s performance to ensure the expected outcomes or performance objectives communicated in the PWS are achieved. Performance management rests on developing a capability to review and analyze information generated through performance assessment. The ability to make decisions based on the analysis of performance data is the cornerstone of performance management; this analysis yields information that indicates whether expected outcomes for the project are being achieved by the contractor.
1.2.2 Performance management represents a significant shift from the more traditional quality assurance (QA) concepts in several ways. Performance management focuses on assessing whether outcomes are being achieved and to what extent. This approach migrates away from scrutiny of compliance with the processes and practices used to achieve the outcome. A performance-based approach enables the contractor to play a large role in how the work is performed, if the proposed processes are within the stated constraints. The only exceptions to process reviews are those required by law (federal, state, and local) and compelling business situations, such as safety and health. A “results” focus provides the contractor flexibility to continuously improve and innovate over the course of the contract if the critical outcomes expected are being achieved and/or the desired performance levels are being met.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed. The contractor measures that quality through the contractor’s quality control (QC) program. QC is work output, not workers, and therefore includes all work performed under this contract regardless of whether the work is performed by contractor employees or subcontractors. The contractor’s QCP will set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. The contractor will develop and implement a performance management system with processes to assess and report its performance to the designated government representative. The contractor’s QCP will also set forth the staffing and procedures for self-inspecting the quality, timeliness, responsiveness, customer satisfaction, and other performance requirements in the PWS. This QASP enables the government to take advantage of the contractor’s QC program.
1.3.2 The government representative(s) will monitor performance and review performance reports furnished by the contractor to determine how the contractor is performing against communicated performance objectives. The government will make determinations regarding incentives based on performance measurement metric data and notify the contractor of those decisions. The contractor will be responsible for making required changes in processes and practices to ensure performance is managed effectively.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer (CO)
The CO is responsible for monitoring contract compliance, contract administration, and cost control, and resolving any differences between observations documented by the Government Technical Representative (GTR) and the contractor. The CO will designate one full-time GTR as the government authority for performance management. The number of additional representatives serving as technical inspectors depends on the complexity of the services measured, as well as the contractor’s performance, and must be identified and designated by the CO.
2.2 The GTR
The GTR is designated in writing by the CO to act as their authorized representative to assist in administering a contract. GTR limitations are contained in the written appointment letter. The GTR is responsible for technical administration of the project and ensures proper government surveillance of the contractor’s performance. The GTR is not empowered to make any contractual commitments or authorize any contractual changes on the government’s behalf. Any changes the contractor deems may affect contract price, terms, or conditions must be referred to the CO for action. The GTR will have the responsibility for completing QA monitoring forms used to document the inspection and evaluation of the contractor’s work performance. Government surveillance may occur under the inspection of services clause for any service relating to the contract.
3 IDENTIFICATION OF REQUIRED PERFORMANCE STANDARDS/QUALITY LEVELS
The required performance standards and/or quality levels are included in the PWS and Attachment 1, Performance Requirements Summary.
4 METHODOLOGIES TO MONITOR PERFORMANCE
4.1 Surveillance Techniques
To minimize the performance management burden, simplified surveillance methods shall be used by the government to evaluate contractor performance when appropriate. The primary methods of surveillance are:
· Random monitoring, which shall be performed by the GTR designated inspector
· 100 percent inspection – Each month, the GTR shall review the generated documentation and enter summary results into the Surveillance Activity Checklist
· Periodic inspection – the GTR typically performs the periodic inspection] 4.1
4.2 Customer Feedback
The contractor is expected to establish and maintain professional communication between its employees and customers. The primary objective of this communication is customer satisfaction. Customer satisfaction is the most significant external indicator of the success and effectiveness of all services provided and can be measured through customer complaints.
Performance management drives the contractor to be customer focused through initially and internally addressing customer complaints and investigating the issues and/or problems, but the customer always has the option to communicate complaints to the CO or GTR, as opposed to the contractor.
Customer complaints, to be considered valid, must set forth clearly and in writing the detailed nature of the complaint, must be signed, and must be forwarded to the GTR. The GTR will accept those customer complaints and investigate.
Customer feedback may also be obtained either from the results of formal customer satisfaction surveys or from random customer complaints.
4.3 Acceptable Quality Levels
The acceptable quality levels (AQLs) included in Attachment 1 for contractor performance are structured to allow the contractor to manage how the work is performed while providing negative incentives for performance shortfalls.
5 QUALITY ASSURANCE DOCUMENTATION
5.1 The Performance Management Feedback Loop
The performance management feedback loop begins with the communication of expected outcomes. Performance standards are expressed in the PWS and assessed using the performance monitoring techniques shown in Attachment 1.
5.1
5.2 Monitoring Forms
The government’s QA surveillance, accomplished by the GTR, will be reported using the monitoring form in Attachment 2. The forms, when completed, will document the government’s assessment of the contractor’s performance under the contract to ensure the required results.
5.2.1 The GTR will retain a copy of all completed QA surveillance forms.
6 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
6.1 Determining Performance
6.1.1 The government shall use the monitoring methods cited to determine whether the performance standards/service levels/AQLs have been met. If the contractor has not met the minimum requirements, it may be asked to develop a corrective action plan to show how and by what date it intends to bring performance up to the required levels.
6.2 Reporting
6.2.1 At the end of each month, the GTR will prepare a written report summarizing the overall results of the quality assurance surveillance of the contractor’s performance. This report, which includes the contractor’s submitted monthly report and the completed quality assurance monitoring forms (Attachment 2), will become part of the QA documentation. It will enable the government to demonstrate whether the contractor is meeting the stated objectives and/or performance standards, including cost/technical/scheduling objectives.
6.3 Reviews and Resolution
6.3.1 The GTR may require the contractor’s project manager or designated alternate to meet with the GTR and other government IPT personnel as deemed necessary to discuss the performance evaluation. The GTR will define a frequency of in-depth reviews with the contractor, including appropriate self-assessments by the contractor; however, if the need arises, the contractor will meet with the GTR as often as required or per the contractor’s request. The agenda of the reviews may include:
· Monthly performance assessment data and trend analysis
· Issues and concerns of both parties
· Projected outlook for upcoming months and progress against expected trends, including a corrective action plan analysis
· Recommendations for improved efficiency and/or effectiveness
6.1 6.2 6.3 6.3.1
6.3.2 The QAR must coordinate and communicate with the contractor to resolve issues and concerns regarding marginal or unacceptable performance.
6.3.3 The GTR and contractor should jointly formulate tactical and long-term courses of action. Decisions regarding changes to metrics, thresholds, or service levels should be clearly documented. Changes to service levels, procedures, and metrics will be incorporated as a contract modification at the convenience of the procuring CO (PCO) or ACO.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Services (Task) Performance Standards Acceptable Quality Levels Methods of Surveillance
| Task 1 |
| Meet requirements in PWS. |
| 100% of the time (no deviation) |
| GTR periodic, random, and 100% inspection |
| Task 2 |
| Meet requirements in PWS. |
| 100% of the time (no deviation) |
| GTR periodic, random, and 100% inspection |
| Task 3 |
| Meet requirements in PWS. |
| 100% of the time (no deviation) |
| GTR periodic, random, and 100% inspection |
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint LEVEL OF SURVEILLANCE (check):
| Monthly | Quarterly | As needed | |
| PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: | ______ % |
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
| Service Provider’s Performance (check): | Meets Standards |
| Does Not Meet Standards |
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________