Attachment 2 - PWS.pdf

PDF 1007 KB Posted

Attached to
Replace Siding, Gutters, windows, and one door Federal contract opportunity
Solicitation number
12805B22Q0172
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

View the file

Other files for this federal contract opportunity

Other files attached to Replace Siding, Gutters, windows, and one door, newest first.
File Type Posted
Modification 3 - RFQ - 12805B22Q0172.pdf PDF
Modification 2 - RFQ - 12805B22Q0172.pdf PDF
Modification 1 - RFQ - 12805B22Q0172.pdf PDF
Attachment 4 - ARS-372.pdf PDF
RFQ - 12805B22Q0172.pdf PDF
Attachment 1 - Wage Determination.pdf PDF
Attachment 3 - ARS-371.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement (PWS) Replace outside siding on Cage, Receiving;

Asset #544700B009 03/30/2022

Version 1.0

Vision Statement

1 Introduction

1.1 Mission

1.2 Background

1.3 Scope

2 General Requirements

2.1 Non-Personal Services

2.2 Business Relations

2.3 Contract Administration and Management

2.3.1 Contract Management

2.3.2 Contract Administration

2.3.3 Personnel Administration

2.4 Subcontract Management

2.5 Contractor Personnel, Disciplines, and Specialties

2.6 Location and Hours of Work

2.7 Travel / Temporary Duty (TDY)

3 Performance Requirements

3.1 Remove all current siding on Building Asset #544700B009

3.2 Install new siding to Cage, Receiving; Asset #544700B009

3.3 Contractor must conduct a location site visit to place a bid on the project

3.4 Contractor will provide trained employees to perform all tasks on removing and installing siding

3.5 Contractor shall provide a qualified foreman to oversee laborers on-site

3.6 Removal and installation must be accomplished to ensure the building is secured at all times

3.7 Contractor shall complete the project 60 days from the contract start date

3.8 Contractor shall replace, at contractor's expense, anything broken by the contractor including but not limited to windows, doors, piping, card readers, wiring that is already existent in the current facility, etc

3.9 Contactor shall provide milestones of the project

4 Special Requirements

4.1 Security and Safety

4.1.1 Security

4.1.2 Safety

4.2 Transition

4.3 Government Furnished Materials

4.4 Environmental Requirements

4.5 Applicable Directives

4.6 Quality

4.6.1 Quality Control

4.6.2 Quality Assurance Surveillance Plan (QASP)

5 Deliverables

6 Related Documents

Performance Work Statement (PWS) Replace outside siding on Cage, Receiving; Asset #544700B009

Vision Statement Remove existing /steel siding of building 544700B009 and replace with /steel siding. Seal roof of breezeway (part of building 009) between building 009 and 012. Replace six windows and one personnel door of building 009.

1 Introduction Building (# 544700B009) requires new /steel siding.

1.1 Mission

Purpose of the contract is to install weather membrane and replace the exterior walls of building 009.

1.2 Background

Building 009 (544700B009) was constructed in 1967 (Source: Builder Report). The outside siding has seen wear and tear over the years including various sections of the walls cut out for ventilation and patched back together after those were no longer needed.

1.3 Scope

All four sides of the building need to be replaced. The roof of the breezeway, which is part of Building 009 (544700B009) and connects 009 with and Building 012 (544700B012) needs to be weather-sealed and closed. Six windows and one personnel door need to be replaced.

2 General Requirements This section describes the general requirements for this effort. The following sub-sections provide details of various considerations on this effort.

2.1 Non-Personal Services

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Procuring Contracting Officer (PCO) immediately.

2.2 Business Relations

The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.3 Contract Administration and Management

The following subsections specify requirements for contract, management, and personnel administration.

2.3.1 Contract Management

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at 2923 Medary Ave, Brookings, SD 57006 and the contractor's corporate offices.

2.3.2 Contract Administration

The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.3.3 Personnel Administration

The contractor shall provide the following management and support as required. The contractor shall provide for employees during designated Government non-work days or other periods where Government offices are closed due to weather or security conditions. The contractor shall maintain the currency of their employees by providing initial and refresher training as required to meet the PWS requirements. The contractor shall make necessary travel arrangements for employees. The contractor shall provide necessary infrastructure to support contract tasks on-site. The contractor shall provide administrative support to employees in a timely fashion (time keeping, leave processing, pay, emergency needs).

2.4 Subcontract Management

The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Procuring Contracting Officer (PCO) or Contracting Officer Representative (COR). Cross teaming may or may not be permitted.

2.5 Contractor Personnel, Disciplines, and Specialties

The contractor shall accomplish the assigned work by employing and utilizing qualified personnel with appropriate combinations of education, training, and experience. The contractor shall match personnel skills to the work or task with a minimum of under/over employment of resources. The contractor shall ensure the labor rates, and man-hours utilized in the performance of each Task Order (PWS line item) issued hereunder will be the minimum necessary to accomplish the task.

The Contractor shall provide the necessary resources and infrastructure to manage, perform, and administer the contract.

2.6 Location and Hours of Work

Accomplishment of the results contained in this PWS requires work at 2923 Medary Ave, Brookings, SD 57006. Normal workdays are Monday through Friday except US Federal Holidays. Workers typically work eight (8) hours per day, 40 hours per week. Core hours of work are from 0700 to 1600 daily. All employees are expected to be available during core hours. If there are any weather or security closures, the contractor will ensure that all buildings are secure and will prevent human or animal intrusion prior to leaving the site.

2.7 Travel / Temporary Duty (TDY)

Travel to other government facilities or other contractor facilities is not required.

3 Performance Requirements The following section specifies the Performance Objectives and Performance Elements for the contract.

3.1 Remove all existing exterior steel siding on Building 009 (Building Asset #544700B009) including Breezeway between Building 009 and Building 012 (#544700B012).

Building 009 is 40 feet wide by 72 feet long by 12 feet high.

The breezeway has two sides. Both are 11 feet wide by approximately 9.5 feet high. The south side has a personnel door (see figures below).

Performance Standards

a) STD: 100% of all current siding needs to be removed AQL: The building needs to remain secured from human, animal and weather intrusion each day prior to the contractor leaving at the end of the workday.

North Side

Figure 1. On the north side, keep PA system, LED light, and intake/exhaust for furnace (circled in blue).

Figure 2. This section below is considered part of Building 009. This siding also needs to be removed and replaced.

East Side

Figure 3.

East side includes the south side of the breezeway.

Remove and replace two windows

Remove and replace gutters and downspouts.

South Side

Gas lines, LED light, intake and exhaust for furnace, power feed (junction box) to soil shed on south side need to stay (circled in blue).

Junction box above gas line can be removed (circled in red).

Figure 4.

West Side

Keep HVAC condensing unit, power box disconnect and line set, LED light (circled in blue).

Remove exhaust fan; remove and replace four windows (circled in red).

Figure 5.

Figure 6. (West side continued)

3.1.1 The Contractor shall dispose of current /steel siding removed.

Performance Standards

a) STD: No siding or debris shall be left on USDA grounds.

AQL: 100% of debris removed.

3.1.1.1 The Contractor will remove and dispose all gutters and downspouts.

a) STD: No gutters or downspouts or debris shall be left on USDA grounds.

AQL: 100% of debris removed.

Figure 7

Figure 8

3.1.1.2. The Contractor will disengage electrical junction box from the southeast side, then re-engage the junction box after new siding is installed.

Figure 9

The Contractor will disengage the HVAC unit on the northwest side and light in the middle then re-engage the HVAC unit on northwest of the building and light once siding is installed.

Figure 10

3.1.1.2 The Contractor shall obtain dumpster from local waste collectors (Cooks Waste Paper and Recycling 605-693-3363; Brookings Dumpster Service 605-691- 9442; or a vendor of the contractor's choosing) to dispose of current siding

Performance Standards

a) STD: Position dumpster to the west of the facility where contractor is performing work.

AQL: Position dumpster at a convenient distance for contractor to the west of Building 009.

3.2 Install new /steel siding to Cage, Receiving; Building 009 (#544700B009). The Contractor shall procure commercial-grade siding to match existing. Submittals of proposed exterior siding system with technical specifications shall be provided for review and approval prior to material procurement.

Performance Standards

a) STD: Siding installed; ensure flawless seams with windows and doors.

AQL: 100% installed within 30 days.

3.2.1 The Contractor shall procure commercial-grade siding to match existing in thickness and fastening type.

3.2.2. Install new gutters and downspouts to Building 009 (#544700B009).

Performance Standards

a) STD: Gutters and downspouts installed; ensure flawless seams.

3.2.3 The Contractor shall procure commercial-grade gutters and downspouts on building. Submittals of proposed gutter system with technical specifications shall be provided for review and approval prior to material procurement.

3.2.3.1 gutters will run the length of the entire east side of Building 009.

3.2.3.2 Downspouts will be installed on the east side of the Building 009.

3.2.3.2.1 Two downspouts will be installed in the gutters and extend from the gutter to the ground. One downspout will be located on the northeast and one on the southeast side of the building.

Figure 11

3.2.4 The Contractor shall acquire/purchase siding to cover all walls of the facility. See pictures below. Contractor shall measure building to obtain precise amount of siding required.

3.2.5 The Contractor shall perform installation in accordance with county and state building code

Performance Standards

a) STD: Contractor will supply all tools, equipment, lifts, ladders necessary to complete the project

3.2.6 The Contractor shall furnish all tools and equipment to complete the job

3.2.7 The Contractor shall provide all installation materials (hardware, sealant, etc.) that meets all applicable county, state and federal code to affix siding to the current building structure

Performance Standards

a) STD: Weather tight.

AQL: 100% of the time, year round

3.2.8 The Contractor shall meet with USDA employees on site to discuss and select color of siding.

3.2.9 The Contractor shall ensure siding runs flesh up with current doors and windows and roof.

3.2.10 The Contractor shall seal all siding around doors, windows, roof and ground.

Performance Standards

a) STD: Sealing will be weather tight.

AQL: 100%

3.3 Contractor must conduct a location site visit on by contacting location contact for to place a bid on the project.

3.3.1 The Contractor shall visit the location at 2923 Medary Ave, Brookings, SD by contacting location contact to conduct a visual inspection of the work to be performed prior to submitting a quote

3.4 Contractor will provide trained employees to perform all tasks on removing and installing siding

3.4.1 The Contractor may have employees on the site between the hours of 0700 and 1600, Monday through Friday. Any alterations of those hours must be approved by the USDA Adminsistrative Officer from the Brookings, SD location.

3.5 Contractor shall provide a qualified foreman to oversee laborers on-site.

3.6 Removal and installation of siding must be accomplished to ensure the building is secured at all times.

3.6.1 The contractor shall ensure that at the end of each work day, the facility being worked on must be secured against personnel or animal entry and protected from the elements.

a) STD: Example: no gaps present in walls.

3.7 Contractor shall complete the project 60 days from the contract start date.

Performance Standards

a) STD: All old siding, gutters and downspouts removed and disposed. Six old windows removed, disposed and replaced. Personnel door removed and replaced. All new siding installed. Worksite, inside and out, cleared of debris. All debris removed.

3.8 Contractor shall replace, at contractor's expense, anything broken by the contractor including but not limited to windows, doors, piping, card readers, wiring that is already existent in the current facility, etc.

Performance Standards

a) STD: Addresses all errors and inadequacies AQL: Repairs of anything broken must be like for like and be completed within the time period of the contract. The contractor will not be paid for their work done on the existing contract until all broken items are replaced.

3.9 Contactor shall provide milestones of the project

3.9.1 The Contractor shall electronically provide a .pdf document of the milestones of the contract.

Performance Standards

a) STD: Provide milestones with dates from start to finish within 5 days of contract start date.

Performance Requirement Summary (PRS) Statements Standards/AQLs Incentive/Remedy

3.1 Remove all current

siding on Building Asset #544700B009

a) 100% of all current siding needs to be removed AQL: The building needs to remain secured at the end of each work day.

3.1.1 The Contractor shall

dispose of current

a) No siding or debris shall be left on USDA grounds.

siding removed. AQL: 100% of debris removed.

3.1.1.1 The Contractor shall

obtain dumpster from local waste collectors (Cooks Waste Paper and Recycling 605-693- 3363; Brookings Dumpster Service 605-691-9442; or a vendor of the contractor's choosing) to dispose of current siding

a) Position dumpster to the west of the facility where contractor is performing work.

AQL: Within 50 yards of building

Statements Standards/AQLs Incentive/Remedy

3.2 Install new siding to

Cage, Receiving;

Asset #544700B009

a) Siding installed; ensure flawless seams with windows and doors.

3.2.1 The Contractor shall

procure commercial-grade (need to research), industry standard siding (need to research) on building

3.2.2 The Contractor shall

acquire/purchase siding to cover all walls of the facility.

See pictures attached. Contractor shall measure building to obtain precise amount of siding required.

a) Contractor may request measurements

3.2.3 The Contractor shall

perform installation in accordance with county and state building code

a) Contractor will supply all tools, equipment, lifts, ladders necessary to complete the project

3.2.4 The Contractor shall

furnish all tools and equipment to complete the job

3.2.5 The Contractor shall a) Weather tight.

provide all hardware, sealant, etc. that meets all applicable county, state and federal code to affix siding to the current building structure

AQL: 100% of the time, year round

3.2.6 The Contractor shall

meet with USDA employees on site to discuss and select color of siding.

3.2.7 The Contractor shall

ensure siding runs flesh up with current doors and windows and roof.

3.2.8 The Contractor shall

seal all siding round doors, windows, roof and ground.

a) Sealing will be weather tight.

3.3 Contractor must

conduct a location site visit to place a bid on the project

3.3.1 The Contractor shall

visit the location at 2923 Medary Ave, Brookings, SD by contacting the location contact to conduct a visual inspection of the work to be performed prior to submitting a quote

3.4 Contractor will

provide trained employees to perform all tasks on removing and installing siding

3.4.1 The Contractor may

have employees on the site between the hours of 0700 and 1600, Monday through Friday. Any alterations of those hours must be approved by the

USDA

Adminsistrative Officer from the Brookings, SD location.

3.5 Contractor shall

provide a qualified foreman to oversee laborers on-site.

3.6 Removal and

installation must be accomplished to ensure the building is secured at all times.

3.6.1 The contractor shall

ensure that at the end of each workday, the facility being worked on must be secured against personnel or animal entry and protected from the elements.

a) No gaps present in walls.

3.7 Contractor shall

complete the project 60 days from the contract start date.

a) All old siding removed and disposed. All new siding installed.

Worksite, inside and out, cleared of debris. All debris removed.

3.8 Contractor shall

replace, at contractor's expense, anything broken by the contractor including but not limited to windows, doors, piping, card readers, wiring that is already existent in the current facility, etc.

a) Addresses all errors and inadequacies AQL: Repairs of anything broken must be like for like and be completed within the time period of the contract. The contractor will not be paid for their work done on the existing contract until all broken items are replaced.

3.9 Contactor shall

provide milestones of the project

3.9.1 The Contractor shall

electronically provide a .pdf document of the milestones of the contract.

a) Milestones with dates from start to finish within 5 days of contract start date.

4 Special Requirements This section describes the special requirements for this effort. The following sub-sections provide details of various considerations on this effort.

4.1 Security and Safety

This section describes the security and safety for this effort. The following sub-sections provide details of various considerations on this effort.

4.1.1 Security

DD Forms 254: Overarching security requirements and Contractor access to classified information shall be as specified in the basic DD Form 254, which will be further identified in the DD Form 254 for each TO, as required. All contractor personnel with access to unclassified information systems, including e-mail, shall have at a minimum a favorable National Agency Check (NAC).

Visitor Group Security Agreement. The contractor shall sign a Contractor Visitor Group Security Agreement to protect classified information involved in performance under this contract or Task

Order. The Agreement will outline responsibilities in the following areas: Contractor security supervision; Standard Practice Procedures; access, accountability, storage, and transmission of classified material; marking requirements; security education; personnel security clearances;

reports; security checks; security guidance; emergency protection; protection of government resources; DD Forms 254; periodic security reviews; and other responsibilities, as required.

4.1.2 Safety

Contractor Compliance: The contractor and its subcontractors shall comply with Public Law 91- 596 (Occupational Safety and Health Act (OSHA)) and the Environmental, Safety, and Occupational Health (ESOH) (DODD 4715.1E). These requirements shall be incorporated into the contractor’s safety and health program. The Department of Defense (DoD) participates in the OSHA Voluntary Protection Program (VPP). Contractor personnel performing services on a DoD installation shall participate in the local VPP. Information on the VPP is available at http://www.osha.gov/dcsp/vpp/index.html.

Mishap Notification and Investigation: The contractor and its subcontractors (if applicable) shall promptly report pertinent facts regarding mishaps involving Government property damage or injury to Government personnel and to cooperate in any resulting safety investigation. The contractor shall notify (via telephone) the cognizant contracting officer, the contracting officer’s representative, and/or other applicable members within four (4) hours of all mishaps or incidents. The Government person notified by the contractor will in-turn notify the Safety office.

Contractor notifications made after duty hours shall be reported to the appropriate installation Command Post. If requested by the cognizant contracting officer, the contracting officer’s representative, and/or the cognizant program manager, the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records until released by the investigating safety office. If the Government investigates the mishap, the contractor and the subcontractors shall cooperate fully and assist the Government personnel until the investigation is completed.

4.2 Transition

The contractor shall follow the transition plan submitted as part of the proposal and keep the Government fully informed of status throughout the transition period. Throughout the phase-in/phase-out periods, it is essential that attention be given to minimize interruptions or delays to work in progress that would impact the mission. The contractor must plan for the transfer of work control, delineating the method for processing and assigning tasks during the phase-in/phase-out periods.

4.3 Government Furnished Materials

N/A

4.4 Environmental Requirements

The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. Compliance with documents listed as non-mandatory is the contractors' option.

Mandatory compliance (list)

Non-Mandatory document (list)

4.5 Applicable Directives

The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. Compliance with documents listed as non-mandatory is the contractors' option.

Mandatory compliance (list)

Non-Mandatory document (list)

4.6 Quality

This section describes the Quality Control components for this effort. The following sub-sections provide details of various considerations on this effort.

4.6.1 Quality Control

The Contractor shall develop a Task/Delivery Order QCP and maintain an effective quality control program to ensure services are performed in accordance with the IDIQ contract and this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractors QCP is the means by which he assures himself that his work complies with the requirement of the contract.

The finalized QCP will be accepted by the Government at the time of the award of the Task/Delivery Order. The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the Contracting Officer for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Governments review and approval. The Government may find the QCP "unacceptable" whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."

4.6.2 Quality Assurance Surveillance Plan (QASP)

The Government shall monitor the Contractors performance under this Task/Delivery Order in accordance with the Government’s QASP.

5 Deliverables The contractor shall provide deliverables as described in subsequent task orders. Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be outlined in CDRLs and/or other means TBD.

Key Deliverables

Item No.

Deliverable

Objective

Due

1 Proposed Project Plan

Defining the responsibilities, timeline, risks, and milestones of contract objectives.

No later than five

(5) business days after contract award

2 Weekly Status Report

Report documenting tasks & issues weekly.

Weekly, every Friday, by 3:00 pm (CST) unless until the contract expires

6 Related Documents The following Documents are related to this project. N/A

7. Final Inspection:

The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. COR and contractor shall compile a “punch list” prior to final acceptance of the installation and submit completed warranty documentation to manufacturer.

8. Warranty:

In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design.

The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.

9. Notification and Compliance: The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.

10. Latent Defects:

The Warranty specified herein shall not limit the Government’s rights with respect to latent defects, gross mistake, or fraud.

11. Acceptance:

Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project.

Minor unfinished items of work may be listed on the certificate and accepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment.

All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor

Vision Statement
1 Introduction
1.1 Mission
1.2 Background
1.3 Scope
2 General Requirements
2.1 Non-Personal Services
2.2 Business Relations
2.3 Contract Administration and Management
2.3.1 Contract Management
2.3.2 Contract Administration
2.3.3 Personnel Administration
2.4 Subcontract Management
2.5 Contractor Personnel, Disciplines, and Specialties
2.6 Location and Hours of Work
2.7 Travel / Temporary Duty (TDY)
3 Performance Requirements
3.1 Remove all existing exterior steel siding on Building 009 (Building Asset #544700B009) including Breezeway between Building 009 and Building 012 (#544700B012).
3.2 Install new /steel siding to Cage, Receiving; Building 009 (#544700B009). The Contractor shall procure commercial-grade siding to match existing. Submittals of proposed exterior siding system with technical specifications shall be provided for r...
3.3 Contractor must conduct a location site visit on by contacting location contact for to place a bid on the project.
3.4 Contractor will provide trained employees to perform all tasks on removing and installing siding
3.5 Contractor shall provide a qualified foreman to oversee laborers on-site.
3.6 Removal and installation of siding must be accomplished to ensure the building is secured at all times.
3.7 Contractor shall complete the project 60 days from the contract start date.
3.8 Contractor shall replace, at contractor's expense, anything broken by the contractor including but not limited to windows, doors, piping, card readers, wiring that is already existent in the current facility, etc.
3.9 Contactor shall provide milestones of the project
4 Special Requirements
4.1 Security and Safety
4.1.1 Security
4.1.2 Safety
4.2 Transition
4.3 Government Furnished Materials
4.4 Environmental Requirements
4.5 Applicable Directives
4.6 Quality
4.6.1 Quality Control
4.6.2 Quality Assurance Surveillance Plan (QASP)
5 Deliverables
6 Related Documents