Attachment 2 - HF HVAC-MACC Ordering Guide_DRAFT.pdf
PDF 713 KB Posted
- Attached to
- Hurlburt Field HVAC MACC Federal contract opportunity
- Solicitation number
- FA441725R0017
About this file
This document is an Ordering and Administration Guide for the Hurlburt Field Air Force Base (HF-AFB) Heating, Ventilation and Air Conditioning Multiple Award Construction Contract (HVAC-MACC), a multiple-award Indefinite Delivery/Indefinite Quantity (IDIQ) contract. The guide outlines the procedures for issuing task orders (TOs), which will be firm-fixed price and range from $1,000 to $3,000,000, with a total contract ceiling of $5,000,000 per contract and a combined ceiling of $25,000,000. Contractors are required to maintain an 80% participation rate in task order competitions, self-perform at least 15% of work, and can be subject to "Off Ramping" (removal from the contract) for poor performance, non-responsiveness, or failure to meet contractual requirements.
The MACC is a total small business set-aside for firms registered in NAICS code 238220 with a $19M size standard, targeting approximately five contractors located within a 300-mile radius of Hurlburt Field, FL. Task orders will be awarded using various source selection processes including Tradeoff and Lowest Price Technically Acceptable methods, with the government assessing contractor performance through quality assessments. Contractors must be registered in the System for Award Management (SAM) and have a current NIST SP 800-71 assessment. The contract will have a five-year ordering period, and nonperforming contractors may be removed from the program through the Off Ramping process.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1- Hurlburt HVAC MACC SOW-DRAFT.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HURLBURT FIELD AIR FORCE BASE (HF-AFB)
MULTIPLE AWARD CONSTRUCTION CONTRACT (MACC)
Heating, Ventilation and Air Conditioning - Multiple Award Construction Contract
(HVAC-MACC)
ORDERING AND ADMINISTRATION GUIDE
(Including Off-Ramping)
27 May 2025
1. General Information: During the ordering period of this Multiple Award Indefinite Delivery/Indefinite Quantity (IDIQ) contract, the Government will implement the process set forth to develop and issue Task Orders (TOs) for performance under this IDIQ. The procedures for selecting Offerors for order awards under this contract are governed by FAR 16.505 and supplements. Unless otherwise specified in a Task Order Proposal Request (TOPR), the following guidance defines the process by which fair opportunity will be afforded and how TOs will be evaluated and awarded. Orders processed under this IDIQ contract will be decentralized, meaning installation Contracting Officers (Ordering Contracting Officer) will solicit active IDIQ holders for local requirements and administer the resulting orders. Orders may only come from Contracting Officers assigned to Hurlburt Field, FL. All contract clauses contained in the IDIQ shall be considered incorporated in each proposal request unless otherwise specified in the TOPR and resultant TO. If conflict exist between the contract clauses and the information contained in the TO, the IDIQ language shall take precedence.
2. Task Order Procedures: As the need exists for performance under the terms of this contract, the Ordering Contracting Officer from the prospective base will notify each Prime Contractor in the active pool of an existing requirement with a TOPR, unless the Ordering Contracting Officer determines that an exception to Fair Opportunity applies. TOs will be awarded hereunder within the scope of the terms and conditions of this contract IAW FAR 16.505, the fair opportunity principles at FAR 16.505(b), and DFARS 216.505. The Offeror shall submit a proposal IAW the individual terms of TOs specified by the Ordering Contracting Officer in the individual TOPR.
TOPRs will indicate funds availability. Orders shall be issued on a Firm-Fixed Price (FFP). The Contract Line-Item Number (CLIN) structure shall be identified at the individual TO level.
3. Participation: Each Offeror is required to submit a response or proposal to all TOPRs to maintain an 80% participation. Offerors are not obligated to propose on all TOs; however, they are required to contact the Ordering Contracting Officer prior to the proposal due date in writing if they cannot participate in the walk through or submit an offer. Failure to provide this notification may lead to Off Ramping from the IDIQ. Offerors shall maintain a minimum of an 80% participation rate per year. Failure to meet the 80% participation rate will be considered in the Government's evaluation of the Offeror's performance and may result in Off Ramping of an Offeror.
4. Only One Proposal Received: If no proposal or only one proposal is received, the Government, at its discretion, may revalidate the TOPR requirement. The validation process may
DRAFT
include communication with some or all the Offerors to determine whether there are concerns about the TOPR requirement. Should the requirement be validated, the Ordering Contracting Officer may reissue the TOPR package. After the Government revalidates the TOPR requirement and if only one proposal is received, the Ordering Contracting Officer must follow the procedures at DFARS 215.371.
7. TOPR Package: The TOPR shall include at minimum the following documents:
1. Description of the specified work required (SOW for specific requirements and/or specifications and drawings)
2. CLIN Structure
3. Contract Type FFP
4. Location of the Work
5. Period of Performance
6. Magnitude of Project
7. Liquidated Damages Rates
8. Proposal Validity Date
9. Proposal Response Time
10. Questions and Answers due date
11. Bonding Requirements
12. If a site visit is scheduled, the TOPR shall identify the specific schedule and limitations
13. Proposal preparation instructions and selection criteria
14. Any other pertinent information for the Offeror
Award will only be made upon receipt of certified funds; unless specifically authorized by the Ordering Contracting Officer, the Offeror shall not commence performance or incur in any costs until a fully executed TO is issued.
The Prime Contractor and any Subcontractor or lower tier Subcontractor performing construction on the HF-AFB HVAC MACC Program shall be responsible for compliance with all contract clauses cited within the contract.
8. Proposal Cost: Costs for preparation of proposals and pre-award activities shall be the sole responsibility of the Offeror. Offerors will not be reimbursed for attendance during negotiations, site visits, walk-throughs, or any other pre-award activities/expenses.
9. Canceling TOPR: The Ordering Contracting Officer reserves the right to withdraw or cancel the proposed TOPR package. In such event, Offerors will be notified via letter or email of the Ordering Contracting Officer's decision, and the decision shall be final and conclusive and shall not be subject to the "Disputes" clause or the "Contract Disputes Act".
10. Pricing Data: TOs that exceed the threshold at FAR 15.403-4 can be subject to certified cost or pricing data and/or other than certified cost or pricing data can be required to support all proposals.
11. Design Fee: For TOs requiring design efforts (i.e. Design-Build requirements), the price for fee for the production and delivery of designs, plans, drawings, and specifications (i.e. Direct Costs) cannot exceed 10% of the estimated construction as imposed by 10 U.S.C 2306(d) and 41 U. S.C. 254(b) excluding those for requirements funded using Non-Appropriated Funds (NAF).
12. Source Selection Processes: TOs may be awarded based on the utilization of any of the following source selection processes: Tradeoff, Lowest Price Technically Acceptable (LPTA), or any other evaluation process identified in the TOPR depending on the unique requirements of each TO.
13. Protest: In accordance with FAR 16.505(a)(10)(i) and (ii) no protest under FAR subpart 33.1 is authorized in connection with the issuance or proposed issuance of an order under a task-order contract or delivery-order contract, except for a protest on the grounds that the order increases the scope, period, or maximum value of the contract; or a protest of an order valued in excess of $25 million (10 U.S.C. 2304c(e)). Protests of orders in excess of the thresholds stated in FAR 16.505(a)(10)(i)(B) may only be filed with the Government Accountability Office, in accordance with the procedures at FAR 33.104.
14. Administration of TO: Only the Ordering Contracting Officer that issued the TOs to the Offeror, shall provide specific authorization or direction to perform work within the scope of the contract and as specified in the requirement documents. Unless specifically authorized by the Ordering Contracting Officer, the Offeror shall not commence work until a fully executed TO has been awarded and a notice to proceed has been issued. The Ordering Contracting Officer that issued the TO is the only person authorized to approve changes or modify any of the TOs issued under this contract, and notwithstanding any provisions contained elsewhere in this contract, the said authority remains solely with the Ordering Contracting Officer. In the event the Offeror effects any such changes at the direction of any person other than the Ordering Contacting Officer, the change will be considered made without authority and no adjustment will be made in the contract price to cover increase in costs incurred as a result thereof.
15. Modifications: Modifications to TOs will be issued on Standard Form (SF) 30 by the Ordering Contracting Officer.
16. Designated Project Manager: Upon receipt of the TO, the designated Project Manager at the Ordering Contracting Officer location shall be responsible for the oversight and management of the TO and shall be the POC for the Government's Project Manager.
17. Off Ramping General Conditions:
Off Ramping: is defined as removing an active contract holder from the fair opportunity process.
Removal from MACC Program: Once Off Ramped, Offerors will be completely removed from the MACC Program and will no longer be eligible to compete for future TO awards. Work on previously awarded TOs is expected to continue to completion, but the contractor will be ineligible to propose on future TOs under the IDIQ.
Participation: Contract holders are expected, in good faith, to participate in TO competitions, and if successful, to deliver quality projects on schedule and at cost, to include management and supervision of Subcontractors. Failure to participate in good faith and/or an overall performance CPAR Rating of Marginal or Unsatisfactory may result in the Offeror being Off Ramped from the MACC IDIQ program.
Quality Assessments: Periodically, the Government will assess the quality of performance by each IDIQ holder, the number, value and complexity of work assigned to each holder and amount of competition achieved. In addition, the Government will assess the internal transaction cost for issuing each TO.
Off Ramp Procedures: The Off Ramp process under the MACC Program encompasses a procedure by which the Government may exercise its unilateral right to remove an Offeror from the pool of active IDIQ contract awardees. The Government, at its sole discretion, reserves the right to Off Ramp an Offeror by enforcing a contract termination at the end of performance of the last active awarded TO, at no cost to the Government, for the reasons below as applied to the Offeror or any of its Subcontractors:
a) Failure to provide good faith, competitive proposals or responses for at least 80% of TOPR requests over a twelve-month period of performance (It is the responsibility of the Offeror to track percentage submitted.)
b) Failure to self-perform at least 15% of the work over a twelve-month period of performance
c) Late performance of TO workload
d) Failure to maintain and provide required data requested by the Contracting Officer
e) Inability of Prime Contractor or Subcontractors performing work to maintain proper certification
f) Failure to participate in the annual program management review
g) Consistently poor TO performance as evidence by customer feedback to the Contracting Officer
h) Unresponsiveness to warranty work
i) Failure to provide responsive customer service
j) Unsafe site conditions
k) Any other reason seen suitable by the Contracting Officer
30 Day Notice: The Government will provide a 30-day written notice if it intends to Off Ramp an IDIQ Offeror. However, it is the Government's intent to maintain a strategic relationship with all IDIQ Offerors for the duration of the IDIQ ordering period. Off Ramping of Offerors utilizing the Off Ramping procedures shall not constitute a basis of contractual adjustment or a claim under the Disputes clause. Additional Procedures to remove an Offeror from the pool of active IDIQ contract awardees includes FAR Part 49 for contracts or orders.
18. Exclusion from specific opportunities or requirements. IAW FAR 16.505(b)A contractor can be excluded from specific opportunities or requirements if they fail to perform satisfactorily on similar requirements, even if they are not being entirely off-ramped. This approach allows the Government to address performance issues more precisely without completely removing the contractor from all future opportunities.
File details come from the government source that posted it. Updated .