Attachment_2_-_GAOA_Depression_Dam_Drawings.pdf

PDF 9 MB Posted

Attached to
GAOA DEPRESSION DAM MAINTENANCE Federal contract opportunity
Solicitation number
140L3623Q0016
Issued by
Department of the Interior Bureau of Land Management

View the file

Other files for this federal contract opportunity

Other files attached to GAOA DEPRESSION DAM MAINTENANCE, newest first.
File Type Posted
Amendment_01_0001.pdf PDF
Sol_140L3623Q0016_Amd_0001.pdf PDF
Attachment_5_-_Past_Performance_Questionnaire.pdf PDF
Attachment_6_-_SF25A_Payment_Bond.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF
Attachment_1_-_GAOA_Depression_Dam_SOW.pdf PDF
Sol_140L3623Q0016.pdf PDF
Solicitation_Package.pdf PDF
Attachment_4_-_Reference_List.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WORK LOCATION

DIRECTIONS FROM BLM BILLINGS FIELD OFFICE, 5001 SOUTHGRATE DR, BILLINGS, MT 59101:

1. HEAD EAST ON SOUTHGATE DR

1.1. 0.2 MI

2. TURN RIGHT ONTO KING AVE E

2.1. 436 FT

3. TURN RIGHT AT THE 1ST CROSS STREET ONTO S BILLINGS BLVD

3.1. 495 FT

4. TURN RIGHT TO MERGE ONTO I-90 W TOWARD BUTTE

4.1. 0.3 MI

5. MERGE ONTO I-90 W

5.1. 12.6 MI

6. TAKE EXIT 434 FOR US-212/US-310 TOWARD LAUREL/RED LODGE

6.1. 0.3 MI

7. TURN LEFT ONTO US-212 W/US-310 E

7.1. 12.7 MI

8. TURN LEFT ONTO US-310 E

8.1. 19.3 MI

9. TURN LEFT ONTO PRYOR MOUNTAIN RD

9.1. 1.4 MI

10. SLIGHT RIGHT TO STAY ON PRYOR MOUNTAIN RD

10.1. 0.4 MI

11. TURN LEFT AT THE 1ST CROSS STREET TO STAY ON PRYOR MOUNTAIN RD

11.1. 5.1 MI

12. ARRIVE AT ACCESS ROAD. FOLLOW ACCESS ROAD TO PROJECT WORK SITE

12.1. 0.67 MI

GENERAL NOTES:

1. WORK IS ANTICIPATED TO START AFTER JULY 15, 2023.

2. CONTRACTOR TO REMOVE ALL UNDESIRABLE VEGETATION ON THE UPSTREAM SLOPE, DOWNSTREAM SLOPE, DAM CREST, DAM ABUTMENTS, DAM UPSTREAM AND

DOWNSTREAM GROINS, AND WITHIN A 20-FOOT FOOT PRINT OF THE DAM.

3. CONTRACTOR RESPONSIBLE TO DISPOSE OF REMOVED VEGETATION OFF GOVERNMENT LAND. STOCKPILING AND/OR BURNING OF UNDESIRABLE VEGETATION ON

GOVERNMENT LAND WILL NOT BE ALLOWED.

4. CONTRACTOR IS RESPONSIBLE FOR ALL PUBLIC AND PRIVATE UTILITY LOCATES. COORDINATE WITH MONTANA 811 AND ANY OTHER NECESSARY ENTITIES.

5. SITE PLAN AERIAL MAY NOT FULLY REPRESENT THE EXISTING SITE CONDITIONS AT THE SITE, AND IS SHOWN FOR INFORMATIONAL PURPOSES ONLY. REMOVE

VEGETATION ACCORDING TO THE BOUNDARY FLAGGING STAKED IN THE FIELD.

6. IT IS RECOMMENDED THAT THE CONTRACTOR ATTEND THE PRE-BID SITE TOUR TO BETTER UNDERSTAND EXISTING SITE CONDITIONS, PRIOR TO BIDDING.

7. ALL QUANTITIES SHOWN ARE FOR INFORMATIONAL REFERENCE ONLY AND MAY NOT REFLECT THE TOTAL AREA OF UNDESIRABLE VEGETATION TO BE REMOVED AND

DISPOSED OF, OR THE TOTAL NUMBER OF TREES TO BE REMOVED AND DISPOSED OF. CONTRACTOR TO FIELD VERIFY TOTAL UNDESIRABLE VEGETATION AND TREES TO BE REMOVED PRIOR TO BIDDING. CONTRACT WILL BE PAID FOR BY LUMP SUM, AND NO MONIES WILL BE ADDED TO THE CONTRACT DUE TO ISSUES THAT ARISE

FROM THE CONTRACTOR'S LACK OF UNDERSTANDING OF THE EXISTING SITE CONDITIONS.

8. QUANTITIES ARE FOR INFORMATIONAL PURPOSES ONLY. WORK WILL BE PAID FOR PER THE STATEMENT OF WORK AND SCHEDULE OF ITEMS.

9. UNDESIRABLE TREES AND VEGETATION SHALL BE DEFINED AS WEEDS, SHRUBS, TREES, BRUSH, WOODY VEGETATION, TALL GRASS, AND OTHER SIMILAR VEGETATION

CONTAINING TAP-ROOT SYSTEMS. EXAMPLES OF WOODY VEGETATION ARE TO INCLUDE BUT NOT BE LIMITED TO: SILVER SAGEBRUSH, BIG SAGEBRUSH, RUBBER

RABBITBRUSH, GREASEWOOD, SALTBRUSH, WILLOWS, SUMAC, COTTONWOOD, PINE, ETC.

DEPRESSION DETENTION DAM MAINTENANCE3

DepressionDam-1-Cover-Cover Sheet
Sheets and Views
Cover Sheet
DepressionDam-2-ProjectMaps-Project Maps
Sheets and Views
Project Maps
DepressionDam-3-SitePlan-PLAN
Sheets and Views
PLAN

File details come from the government source that posted it. Updated .