Attachment 2 Conceptual Layouts.pdf

PDF 385 KB Posted

Attached to
Mobile Ground Control Station CONEX Box Federal contract opportunity
Solicitation number
80AFRC21SS0001
Issued by
National Aeronautics and Space Administration Armstrong Flight Research Center

About this file

This document includes a statement of work and conceptual layouts for the acquisition of three custom mobile ground control station conex boxes by the National Aeronautics and Space Administration Armstrong Flight Research Center. Interested parties are invited to submit capability statements for the purposes of determining the appropriate level of competition and potential small business subcontracting goals. The statement of work and conceptual layouts provide details on the required floor plans, wall configurations, workstations, servers, network equipment, and antenna layouts for the conex boxes. Interested firms must submit documentation by March 2, 2021 to be considered for the potential small business set-aside and inclusion in any resultant solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to Mobile Ground Control Station CONEX Box, newest first.
File Type Posted
Attachment 1 Statement Of Work.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MGCS Conex Conceptual Layouts

C2 Conex

Top View – Floor Plan

Aisle

Desk

1U space for KVM Extenders and cables

28” min

Workstation B Workstation BWorkstation A Workstation A

Personnel Area

C2 Server Area

Sh el f

Sh el f

Sh el f

Cargo Door Cargo Door ECS/Egress Wall

COMSEC Wall

Personnel Access WallCOMSEC Door

Personnel Access Door

Cable Pass-through

Top View - Ceiling Features

Personnel Area

C2 Server Area

Approximate Location of LED Ceiling Light

Approximate Location HVAC Plenum

Approximate Location of LED Ceiling Light

Lifting Points

Lifting Points

Lifting Points

Lifting Points

ECS/Egress Wall - Exterior

ECS

Inlet

ECS

Inlet

ECS

Outlet

ECS

Outlet

Pass- Through

Plate

Flood Light

Cam-Lok Power Connectors

NEMA 5R-15

Plugs

HVAC Power Connector

ECS/Egress Wall - Interior

Inlet

ECS

Inlet

ECS

Outlet

ECS

Outlet

Pass- Through

Plate MGCS Power Connectors

Auto Transfer Switch

Electric Service Panel

COMSEC Wall – C2 Server Area Side

Pass

Through

ECS

Pass

Through

COMSEC Door (Open Away)

(Hinged on the Right)

Under Floor Cable & ECS Return Pass Through

Light Switch for C2 Server Area overhead lights

COMSEC Wall – Personnel Area Side

Pass

Through

ECS

Pass

Through

COMSEC Door (Open Toward)

(Hinged on the Left)

Under Floor Cable & ECS Return Pass Through

Desk

Personnel Area overhead lights

Egress Wall - Interior

Personnel Access Door (Open Outward)

(Hinged on the Right)

Under Floor Cable & ECS Return Pass Through

Desk

Light Switch for:

Personnel Area overhead lights Front Exterior Lights Rear Exterior Lights

Egress Wall - Exterior

Personnel Egress Door (Open Toward)

(Hinged on the Left)

Flood Light

NEMA 5R-15

C2 Server Area – Shelf Wall

Shelf 1 Shelf 2 Shelf 3

RJ 45

Patch Panel

Fiber Panel

C2 Server Area – Aisle Wall Lifting Points

Anchor Points

NEMA 5R-15 Plugs

HVAC Control Panel

Personnel Area – Desk Wall

Workstation B

Workstation B

Workstation A

Workstation A

Vesa Mount w/27” Monitor

Vesa Mount w/27” Monitor

Vesa Mount w/27” Monitor

NEMA 5-15R

Vesa Mount w/27” Monitor

Vesa Mount w/27” Monitor

Vesa Mount w/27” Monitor

Ethernet Jacks

Fiber Jacks

19” Rack Mount

19” Rack Mount

Personnel Area – Aisle Wall

Shelf View

Direction

Shelf 1 Shelf 2 Shelf 3

FAC

PDU A

FAC

PDU B

FAC

Intercom

FAC

Support

Computer

FAC

Storage

FAC

Network

COMM

GLRA

COMM

AGI-T

COMM

Comms

Processor

COMM

UI

C2

WS-3

C2

CGWY

C2

DC

Server

C2

WS-3

C2 Simulation

Payload Conex

Top View – Floor Plan

Cargo Door Cargo DoorECS/Egress Wall

Server Wall

Personnel Access WallServer Access Door Personnel Access

Door

Aisle

28” min

Workstation B

Personnel AreaServer Area

Sh el f

Sh el f

Workstation B Workstation B Workstation B Workstation B Workstation B

Desk

Top View - Ceiling Features

Personnel Area

Server Area

Approximate Location of LED Ceiling Light

Approximate Location HVAC Plenum

Approximate Location of LED Ceiling Light

Lifting Points

Lifting Points

Lifting Points

Lifting Points

ECS/Egress Wall - Exterior

Inlet

ECS

Inlet

ECS

Outlet

ECS

Outlet

Pass- Through

Plate

Flood Light

Cam-Lok Power Connectors

NEMA 5R-15

HVAC Power Connector

ECS/Egress Wall - Interior

Inlet

ECS

Inlet

ECS

Outlet

ECS

Outlet

Pass- Through

Plate MGCS Power Connectors

Auto Transfer Switch

Electric Service

Server Wall – Server Area Side

Pass

Through

ECS

Pass

Through

Server Door (Open Away)

(Hinged on the Right)

Under Floor Cable & ECS Return Pass Through

Server Area overhead lights

Sever Wall – Personnel Area Side

Pass

Through

ECS

Pass

Through

Server Door (Open Toward)

(Hinged on the Left)

Under Floor Cable & ECS Return Pass Through

Desk

Personnel Area overhead lights

(Open Outward)

(Hinged on the Right)

Under Floor Cable & ECS Return Pass Through

Desk

Light Switch for:

Personnel Area overhead lights Front Exterior Lights Rear Exterior Lights

Personnel Egress Door (Open Toward)

(Hinged on the Left)

Flood Light

NEMA 5R-15

Server Area – Shelf Wall

Shelf 1 Shelf 2

RJ 45

Patch Panel

Server Area – Aisle Wall

Anchor Points

HVAC Control Panel

Personnel Area – Desk Wall

B

Workstation B

Vesa Mount w/27” Monitor

NEMA 5-15R

Vesa Mount w/27” Monitor

Ethernet Jacks

19” Rack Mount

Workstation B

Workstation B

Workstation B

B

Personnel Area – Aisle Wall

Direction

Shelf 1

FAC

PDU A

FAC

PDU B

Pay Mission Support Servers

Pay Team

Workstation

FAC

Network 2

Shelf 2

Antenna Group

Antenna Group – Floor Plan

Cargo DoorECS/Access Wall Personnel Access Door

Aisle

M in

28” min

Sh el f

Sh el f

Antenna Group Area

Antenna Group – Ceiling View

HVAC #1

Lifting Points

Antenna Group Area

Approximate Location of LED Ceiling Light

HVAC #2

Cam-Lok Power Connectors

Pass- Through

Plate

HVAC #1

HVAC #2

NEMA 5R-15

Plugs

Flood Light

Personnel Egress Door (Open Toward)

(Hinged on the Left)

(Open Outward)

(Hinged on the Right)

Light Switch for:

Antenna Group Area overhead lights Front Exterior Lights

Pass-Through Plate

Auto Transfer Switch

Electric Service Panel

Under Floor Cable Pass Through

HVAC

Control

Shelf Wall

Shelf 1 Shelf 2

MGCS Power Connectors

Aisle Wall

HVAC #1 HVAC #2

NEMA 5R-15 Plugs

Anchor Points

Direction

Shelf 1 Shelf 2

SAT AG

All AG

UHF AG

FAC

Network

AG

FAC

Radio

C2 Iridium

PAY

Iridium

C2

UHF

C2

UHF

C2 Antenna

Group Interface

FAC

PDU A

FAC

PDU B