This is a material submittal schedule for two fire alarm system replacement projects for Thompson Hall and Cody Hall at an Air Force base. The schedule outlines 16 required submittals from the contractor, including hazardous materials questionnaires and reports, warranty documentation, electrical and fire alarm system components, and notification devices. Submittals are due 20 days following notice to proceed and must be returned to the contractor for resubmittal if not approved. Final approval of all submittals is required before the contractor can commence work on the fire alarm replacement projects under Solicitation FA301021R0012 issued by the Department of the Air Force Air Education and Training Command.
View the file
Other files for this federal contract opportunity
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule Project Number:
MAHG211013
MAHG211015 Project Title:
Replace Fire Alarm Thompson Hall Replace Fire Alarm Cody Hall Solicitation / Contract Number:
[ enter here ]
| Line Number | (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||||||||
| Number of Copies Required (if not electronically submitted) | Remarks | |||||||||||||||||||||
| Item or Description of Item, Contract Reference, Type of Submittal | Certificate of Compliance | Shop Drawings | Samples | Color Selection | Manufacturer's Recommendation | Warranty-Manufacturer and/or Workmanship | Catalog Data | Operating Instructions | Schedules, Listings, Reports, Plans | Technical Data | Test Reports | Field Reports | Required Submission Date | Date Received in Contracting | Date to Civil Engineering | Return Suspense Date | Submittal Numbers | Date Contractor | ||||
| Notified | Contractor Resubmittal | Final Approval | ||||||||||||||||||||
| Approved | Disapproved | |||||||||||||||||||||
| 1 | HazMat Questionnaire | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 2 | HazMat MSDS | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 3 | Hazmat Reporting Entry Form | 1 | 5 Days Prior to Start Date | |||||||||||||||||||
| 4 | Hazmat Reporting Entry Form | 1 | End of Contract | |||||||||||||||||||
| 5 | Recycling and Landfill Report | 1 | End of Contract | |||||||||||||||||||
| 6 | Warranty (Manufacturer's) | 1 | End of Contract | |||||||||||||||||||
| 7 | 1-Year Warranty (Contractor) | 1 | End of Contract | |||||||||||||||||||
| 8 | Misc. Electrical Material | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 9 | Fire Alarm Panel | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 10 | Mass Notification Panel | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 11 | Conduit | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 12 | Wire | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 13 | MNS Antenna | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 14 | Fire Alarm Devices | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 15 | MNS Devices | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 16 | Electrical Breakers | 1 | 1 | 20 days following NTP | ||||||||||||||||||
| 17 | ||||||||||||||||||||||
| 18 | ||||||||||||||||||||||
| 19 | ||||||||||||||||||||||
| 20 | ||||||||||||||||||||||
| 21 | ||||||||||||||||||||||
| 22 | ||||||||||||||||||||||
| 23 | ||||||||||||||||||||||
| 24 | ||||||||||||||||||||||
| 25 |
&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).
&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
File details come from the government source that posted it. Updated .