Attachment 1 - USCGC SYCAMORE DS FY 24 - Work Items.xls
XLS spreadsheet 66 KB Posted
- Attached to
- USCGC SYCAMORE Dock-side FY24 Federal contract opportunity
- Solicitation number
- 70Z08524RIBCT0003
About this file
This solicitation requests proposals for dockside repairs to USCGC SYCAMORE in fiscal year 2024. The Coast Guard seeks repairs including cleaning and inspection of fuel, water, lube oil and other tanks; overhaul of diesel engines and generators; modification of lifelines and fittings; and upgrade of steering and other systems. The solicitation is set aside 100% for small businesses. Proposals are due by February 8, 2024 and award is anticipated on or around March 4, 2024. Pricing shall be in U.S. dollars and offerors must provide a minimum 60-day warranty on all repair work. To be considered technically compliant, offerors must submit qualifications for welders and other personnel, a property control system description, and lists of subcontractors and certified chemists. Relevant past performance from the last three years is also required. The solicitation includes templates for pricing schedules, labor rates, and other cost estimate details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - USCGC SYCAMORE DS FY 24 SPECS - REV 2.pdf | ||
| SFLC STD SPEC 3101.pdf | ||
| Questions and Answers - Sycamore DS FY 24.docx | DOCX document | |
| Attachment 2 - USCGC SYCAMORE DS FY 24 SPECS - Updated.pdf | ||
| RFP USCGC SYCAMORE DS FY 24 - 70Z08524RIBCT0003.pdf | ||
| Attachment 5 - USCG Ombudsman Notice.pdf | ||
| Attachment 4 - Request for Clarification Form.docx | DOCX document | |
| Attachment 2 - USCGC SYCAMORE DS FY 24 SPECS.pdf | ||
| Attachment 3 - Past Performance Information Form.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC SYCAMORE (WLB-225B) DOCKSIDE AVAILABILITY FY2024 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Fire Prevention Requirements | JOB | $0.00 | ||
| D-002 | Tanks, MP Fuel Stowage and Overflow, Clean and Inspect | JOB | $0.00 | ||
| D-003 | Tanks, MP Fuel Service, Clean and Inspect | JOB | $0.00 | ||
| D-004 | Tanks, Hydraulic Oil Stowage and Service, Clean and Inspect | JOB | $0.00 | ||
| D-005 | Tanks, Potable Water, Clean and Inspect | JOB | $0.00 | ||
| D-006 | Tanks, Lube Oil, Clean and Inspect | JOB | $0.00 | ||
| D-007 | Tanks, Ballast, Clean and Inspect | JOB | $0.00 | ||
| D-008 | Voids, Accessible, Clean and Inspect | JOB | $0.00 | ||
| D-009 | Tanks, Dirty Oil and Waste, Clean and Inspect | JOB | $0.00 | ||
| D-010 | Main Diesel Engine, MDE, Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-011 | Ship Service Diesel Generator, SSDG, Exhaust Piping, Commercial Clean | JOB | $0.00 | ||
| D-012 | Potable Water Pneumatic Tanks, Clean and Inspect | JOB | $0.00 | ||
| D-013 | Compressed Air Receivers and System Valves, All, Clean, Inspect, Hydro and Lift | JOB | $0.00 | ||
| D-014 | Thruster Generator, Overhaul | JOB | $0.00 | ||
| D-015 | Lifelines and Ancillary Fittings, Modify | JOB | $0.00 | ||
| D-016 | Steering System PLC, Upgrade | JOB | $0.00 | ||
| D-017 | Vents,Ducts,Laundry Exhaust,Commercial Cleaning | JOB | $0.00 | ||
| D-018 | Steering Ram Seals, Renew | JOB | $0.00 | ||
| O-019 | Tanks (Potable Water), Preserve "Partial" | JOB | $0.00 | ||
| O-020 | Accessible Void(s), Preserve "Partial" | JOB | $0.00 | ||
| O-021 | Tanks (Ballast), Preserve "100%" | JOB | $0.00 | ||
| O-022 | Tanks (Ballast), Preserve "Partial" | JOB | $0.00 | ||
| O-023 | Tanks (Dirty Oil and Waste), Preserve "100%" | JOB | $0.00 | ||
| O-024 | Tanks (Dirty Oil and Waste), Preserve "Partial" | JOB | $0.00 | ||
| O-025 | Tanks (MP Fuel Service), Preserve "Partial" | JOB | $0.00 | ||
| O-026 | Boat Deck (Port & Starboard) Removable Lifeline Latches, Modify | JOB | $0.00 | ||
| D-027 | Watertight Hatches (External DC Deck and Above), Renew | JOB | $0.00 | ||
| O-00A | Composite Labor Rate | Hour | 500 | 0 | |
| D-00B | GFP Report | NSP | EA | NSP | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(8/15/2023) Draft-0 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .