Attachment 1- Twin Ponds General Specifications.pdf

PDF 536 KB Posted

Attached to
Twin Ponds Paving Project Federal contract opportunity
Solicitation number
12445221Q0037
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Twin Ponds Paving Project, newest first.
File Type Posted
Attachment 1 - A0002 Twin Ponds Specifications.pdf PDF
Attachment 3 - A0002 SOW Twin Ponds Paving Project.pdf PDF
Amendment 0002 12445221Q0037.pdf PDF
Attachment 2 -Project Map.jpg JPG image
Request for Quote 12445221Q0037.pdf PDF
Attachment 3 -SOW Twin Ponds Paving Project.pdf PDF
Attachment 4 - Wage Determinations.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Twin Ponds Paving Project

Table of Contents Preface

101 - Terms¸ Format¸ and Definitions

101.01 Meaning of Terms

101.01 Meaning of Terms

101.03 Abbreviations

101.04 Definitions

102 - Bid¸ Award¸ and Execution of Contract

Delete Section 102

103 - Scope of Work

Delete Subsections 103.02, 103.03, 103.04, 103.05

104 - Control of Work

Delete Subsections 104.01, 104.02, 104.04

104.03 Specifications and Drawings

104.06 Use of Roads by Contractor

105 - Control of Material

105.02(a) Government-provided sources

105.02(c) Contractor-located sources

105.02 (a) Government-provided sources

105.05 Use of Material Found in the Work

106 - Acceptance of Work

106.01 Conformity with Contract Requirements

106.02 Visual Inspection

106.07 Partial and Final Acceptance

107 - Legal Relations and Responsibility to the Public

107.02 Protection and Restoration of Property and Landscape

Delete Subsection 107.05

107.08 Sanitation, Health, and Safety

108 - Prosecution and Progress

Delete Section 108. .................................................................................... Error! Bookmark not defined.

109 - Measurement and Payment

Delete Subsections 109.06, 109.07, 109.08, 109.09

109.01 Measurement of Work

109.02 Measurement Terms and Definitions

109.03 Weighing Procedures and Devices

152 - Construction Survey and Staking

152.04 General

152.05 Survey and Staking Requirements

Table 152-1 Construction Survey and Staking Tolerances

153 - Contractor Quality Control

153.02 Qualifications

153.03 Quality Control Plan

153.07 Records and control charts

155 - Schedules for Construction Contracts

Delete Section 155

156 - Public Traffic

Section 156. – PUBLIC TRAFFIC

157 - Soil Erosion and Sediment Control

157.04 General

207 - Earthwork Geotextiles

207.04(c)(1) First layer placement and compaction

208 - Structure Excavation and Backfill for Selected Major Structures

208.07 Dewatering

211 - Roadway Obliteration

211 – Full Recontour Roadway Obliteration

Description

213 - Subgrade Stabilization

213.05 General

302 - Minor Crushed Aggregate

302.04 Placing Crushed Aggregate

302.05 Compacting and Finishing Crushed Aggregate

303 - Road Reconditioning

303.07 Roadway Reconditioning

314 - Stockpiled Aggregates

314.01 Description

314.04 Stockpile Site

407 - Chip Seal

407.01 Description

407.07 Weather Limitations

407.08 Production Start-Up Procedures

407.09 Asphalt Application

407.11 Placing and Finishing. Table 407-1

407.12 Double and Triple Course Chip Seal. .............................................. Error! Bookmark not defined.

407.12 Double and Triple Course Chip Seal. Table 407-2. ........................ Error! Bookmark not defined.

407.12 Double and Triple Course Chip Seal. Table 407-2a. ...................... Error! Bookmark not defined.

407.15 Payment

409 - Micro Surfacing

409.07 Weather Limitations

411 - Asphalt Prime Coat

411.05 Weather Limitations

411.08 Maintenance

411.09 Acceptance

412 - Asphalt Tack Coat

412.05 Weather Limitations

413 - Asphalt Pavement Milling

413.01 Description

413.03 Milling

413.05 Measurement

413.06 Payment

703 - Aggregate

703.05 (c) Surface course aggregate. (3) Plastic Index

703.05 Subbase, Base, Surface Course, and Screened Aggregate

703.09 Chip Seal Aggregate

Preface Preface_wo_04_08_2021

Delete all but the first paragraph and add the following:

The Forest Service, US Department of Agriculture has adopted FP-14 for construction of National Forest System Roads.

101 - Terms¸ Format¸ and Definitions 101.01_National_3_15_2017

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the FAR (Federal Acquisition Regulations) in the specifications when incorporating into 2400-6(T) Timber Sale or 2400-13(T) Stewardship contracts.

101.01_National_11_9_2016

Add the following paragraph to Subsection 101.01:

101.01 Meaning of Terms.

Delete all references to the TAR (Transportation Acquisition Regulations) in the specifications.

101.03_National_11_9_2016

Add the following to Subsection 101.03:

101.03 Abbreviations.

(a) Acronyms.

AGAR — Agriculture Acquisition Regulations

AFPA — American Forest and Paper Association

FSAR — Forest Service Acquisition Regulations

MSHA — Mine Safety and Health Administration

NESC — National Electrical Safety Code

WCLIB — West Coast Lumber Inspection Bureau

(f) Miscellaneous unit abbreviations.

MP — milepost location ppm — parts per million volume

STA station location

101.04_National_1_22_2020

Make the following changes to Subsection 101.04:

101.04 Definitions.

Delete these definitions and replace the following:

Bid Schedule — The Schedule of Items.

Bridge — A structure, including supports, erected over a depression or an obstruction such as water along a road, a trail, or a railway and having a deck for carrying traffic or other loads.

Contractor — The individual or legal entity contracting with the Government for performance of prescribed work. In a timber sale contract, the contractor is the “Purchaser”.

Culvert — Any structure with a bottom, regardless of fill depth, depth of invert burial, or presence of horizontal driving surface, or any bottomless (natural channel) structure with footings that will not have wheel loads in direct contact with the top of the structure.

Drawings — (Public Works Contracts) Design sheets or fabrication, erection, or construction details submitted to the CO by the Contractor according to FAR Clause 52.236-21 Specifications and Drawings for Construction. Also refers to submissions and submittals.

Notice to Proceed — (Public Works Contracts) Written notice to the Contractor to begin the contract work.

Right-of-Way — A general term denoting (1) the privilege to pass over land in some particular line (including easement, lease, permit, or license to occupy, use, or traverse public or private lands), or (2) Real property necessary for the project, including roadway, buffer areas, access, and drainage areas.

Solicitation—(Public Works Contracts) The complete assembly of documents (whether attached or incorporated by reference) furnished to prospective bidders.

Add the following definitions:

Adjustment in Contract Price — “Equitable adjustment,” as used in the Federal Acquisition Regulations, or “construction cost adjustment,” as used in the Timber Sale Contract, as applicable.

Change — “Change” means “change order” as used in the Federal Acquisition Regulations, or “design change” as used in the Timber Sale Contract.

Forest Service — The United States of America, acting through the Forest Service, U.S. Department of Agriculture.

Neat Line — A line defining the proposed or specified limits of an excavation or structure.

Pioneer Road — Temporary construction access built along the route of the project.

Purchaser — The individual, partnership, joint venture, or corporation contracting with the Government under the terms of a Timber Sale Contract and acting independently or through agents, employees, or subcontractors.

Protected Streamcourse — A drainage shown on the plans or timber sale area map that requires designated mitigation measures.

Road Order — An order affecting and controlling traffic on roads under Forest Service jurisdiction. Road Orders are issued by a designated Forest Officer under the authorities of 36 CFR, part 260.

Shop Drawings — (Timber and Stewardship Contracts) Referred to as “Drawings” in FP-14, include drawings, diagrams, layouts, schematics, descriptive literature, illustrations, lists or tables, performance and test data, and similar materials furnished by Purchaser to explain in detail specific portions of the work required by the contract.

Utilization Standards —

The minimum size and percent soundness of trees described in Public Works contract specifications or Timber Sale and IRTC contract provisions to determine merchantable timber.

Add Figure 101-1—Illustration of road structure terms:

Figure 101-1—Illustration of road structure terms.

102 - Bid¸ Award¸ and Execution of Contract 102.00_National_11_9_2016

Delete Section 102 in its entirety.

Delete Section 102.

103 - Scope of Work 103.00_National_11_9_2016

Delete all of Section 103 except Subsection 103.01 Intent of Contract.

Delete Subsections 103.02, 103.03, 103.04, 103.05.

104 - Control of Work 104.00_National_11_9_2016

Delete Subsections 104.01, 104.02, and 104.04.

Delete Subsections 104.01, 104.02, 104.04.

104.03_National_3_3_2021

Delete Subsection 104.03 and replace with the following:

104.03 Specifications and Drawings.

Refer to B(T) 5.211 in the 2400-6(T)) or the 2400-13(T) contracts for requirements under this subsection.

104.06_National_11_9_2016

Add the following to Subsection 104.06:

104.06 Use of Roads by Contractor.

The Contractor is authorized to use roads under the jurisdiction of the Forest Service for all activities necessary to complete this contract, subject to the limitations and authorizations designated in the Road Order(s) or described in the contract, when such use will not damage the roads or national forest resources, and when traffic can be accommodated safely.

105 - Control of Material 105.02_National_11_1_2016

Add the following to Subsection 105.02(a):

105.02(a) Government-provided sources.

Government-provided sources for this project are identified as follows:

There are no Government-provided mandatory sources.

105.02_National_11_1_2016

Add the following to Subsection 105.02c:

105.02(c) Contractor-located sources.

All material (e.g., soil, gravel, sand, borrow, aggregate, etc.) transported onto National Forest System land or incorporated into the work shall be weed-free. The Contracting Officer may request written documentation of methods used to determine the weed-free status of any and all materials furnished by the contractor. Contractor-provided expertise and methods to establish weed-free status must be appropriate for the weeds of concern in the local area. If weed species are present in the proposed source, appropriate mitigation measures may allow conditional use of the source as required by the Contracting Officer.

105.02_National_7_18_2017

Add the following to Subsection 105.02 (a):

105.02 (a) Government-provided sources.

Complete any pit or quarry development specified for a designated source, even when material is not obtained from the source.

105.05_National_6_29_2020

105.05 Use of Material Found in the Work.

Delete 105.05 (a) and (b) and the last sentence of the second paragraph and substitute the following:

Materials produced or processed from Government lands in excess of the quantities required for performance of this contract are the property of the Government. Place excess material safely at government-approved location, at no additional cost to government.

106 - Acceptance of Work 106.01_National_7_18_2017

Delete Subsection 106.01 and replace with the following:

106.01 Conformity with Contract Requirements.

Follow the requirements of FAR Clause 52.246-12 Inspection of Construction.

References to standard test methods of AASHTO, ASTM, GSA, and other recognized standard authorities refer to the methods in effect on the date of solicitation for bids.

Perform all work to the lines, grades, cross-sections, dimensions, and processes or material requirements shown on the plans or specified in the contract.

Incorporate manufactured materials into the work according to the manufacturer’s recommendations or to these specifications, whichever is more strict.

Plan dimensions and contract specification values are the values to be strived for and complied with as the design values from which any deviations are allowed. Perform work and provide material that is uniform in character and reasonably close to the prescribed value or within the specified tolerance range. The purpose of a tolerance range is to accommodate occasional minor variations from the median zone that are unavoidable for practical reasons.

When standard manufactured items are specified (such as fence, wire, plates, rolled shapes, pipe conduits, etc., that are identified by gauge, unit mass, section dimensions, etc.), the identification will be considered to be nominal masses or dimensions. Unless specific contract tolerances are noted, established manufacturing tolerances will be accepted.

The Government may inspect, sample, or test all work at any time before final acceptance of the project.

When the Government tests work, copies of test reports are furnished to the Contractor upon request.

Government tests may or may not be performed at the work site. If Contractor testing and inspection is verified by the Government, the Contractor’s results may be used by the Government to evaluate work for acceptance. Do not rely on the availability of Government test results for process control.

Acceptable work conforming to the contract will be paid for at the contract unit bid price. Four methods of determining conformity and accepting work are described in Subsections 106.02 to 106.05 inclusive.

The primary method of acceptance is specified in each Section of work. However, work may be rejected at any time it is found by any of the methods not to comply with the contract.

Remove, repair, or replace work that does not conform to the contract, or to prevailing industry standards where no specific contract requirements are noted. Removing, repairing, or replacing work;

providing temporary traffic control; and any other related work to accomplish conformity will be at no cost to the Government.

(a) Disputing Government test results. If the accuracy of Government test results is disputed, promptly inform the CO. If the dispute is unresolved after reasonable steps are taken to resolve the dispute, further evaluation may be obtained by written request. Include a narrative describing the dispute and a proposed resolution protocol that addresses the following:

1. Sampling method;

2. Number of samples;

3. Sample transport;

4. Test procedures;

5. Testing laboratories;

6. Reporting;

7. Estimated time and costs; and

8. Validation process.

If the evaluation requires additional sampling or testing be performed, mutually agree with the Government on witnessing procedures and on sampling and testing by a third party laboratory. Use a third party laboratory accredited by the AASHTO accreditation program. Provide proof of the laboratory’s accreditation for the test procedures to be used. Do not use the same laboratory that produced the disputed Government test results or that produced the test results used as a basis for the dispute.

The CO will review the proposed resolution protocol and may modify it before final approval and execution.

The Government will use the approved resolution protocol test results to determine the validity of the disputed testing. If the Government test results are validated, the Contractor will be responsible for all costs associated with developing and performing the resolution protocol. If the Government test results are not validated, the Government will be responsible for all costs associated with developing and performing the resolution protocol. If the validity of the Government test results cannot be determined, the Contractor and Government will equally share all costs associated with developing and carrying out the resolution protocol.

(b) Alternatives to removing and replacing non-conforming work. As an alternative to removal and replacement, the Contractor may submit a written request to:

1. Have the work accepted at a reduced price; or

2. Be given permission to perform corrective measures to bring the work into conformity.

The request must contain supporting rationale and documentation. Include references or data justifying the proposal based on an evaluation of test results, effect on service life, value of material or work, quality, aesthetics, and other tangible engineering basis. The CO will determine disposition of the nonconforming work.

106.02_National_11_9_2016

Delete Subsection 106.02 and replace with the following:

106.02 Visual Inspection.

Acceptance is based on visual inspection of the work for compliance with the specific contract requirements. Use prevailing industry standards in the absence of specific contract requirements or tolerances.

106.07_National_11_1_2016

Delete Subsection 106.07.

106.07 Partial and Final Acceptance.

107 - Legal Relations and Responsibility to the Public 107.02_National_11_1_2016

Add the following to Subsection 107.02:

107.02 Protection and Restoration of Property and Landscape.

Contractor shall protect government property and is responsible for damages. No work shall take place in streams or other waterbodies. All water bodies shall be protected from sedimentation.

107.05_National_7_18_2017

Delete Subsection 107.05.

Delete Subsection 107.05.

107.08_National_3_3_2021

Delete Subsection 107.08 and replace with the following:

107.08 Sanitation, Health, and Safety.

Refer to specific provisions under B(T) 6.0 in the 2400-6(T) or the 2400-13(T) contracts for requirements under this subsection.

108 - Prosecution and Progress 108.00_National_11_9_2016

Deleted.

109 - Measurement and Payment 109.00_National_11_9_2016

Delete Subsections 109.06, 109.07, 109.08, and 109.09:

Delete Subsections 109.06, 109.07, 109.08, 109.09.

109.01_National_2_22_2019

Delete the third paragraph and Table 109-1 of Subsection 109.01 and replace with the following:

109.01 Measurement of Work.

Take measurements as described in Subsection 109.02 unless otherwise modified by the Measurement Subsection of the section controlling the work being performed. Table 109-1 indicates the accuracy required for quantities of the various pay units used in the Schedule of Items. Use this guide to determine the decimal placement in the final payment.

Table 109-1

Decimal Accuracy of Quantities for Final Payment

Pay Item Level of Precision Linear Foot 1

Exception--Timber, Steel, and concrete Piles 0.1 Station 0.1 Mile 0.01 Square Foot 0.1 Square Yard 0.1 Each 1 Acre 0.01 Gallon 1 M-Gals. 0.1 Cubic Yard 1

Exception--Structure Excavation; Sheathing Materials; Bedding, Bed Course, and Backfill Materials; Gabions;

0.1

Exception--Concrete; Masonry 0.01 Pound 1 Ton 0.1

Exception--Calcium Chloride; 0.01

Sodium Chloride; Hydrated Lime;

Bituminous Materials; Pavements;

Bed Course Materials

Hour 0.1

MFBM 0.01

Station Yard 1 Cubic Yard Mile 1 Ton Mile 1

109.02_National_11_9_2016

Add the following sentence to Subsection 109.02(b):

109.02 Measurement Terms and Definitions.

(b) Contract quantity.

Contract quantities will be adjusted only when there are errors in the original design of 15% or more.

109.03_National_11_1_2016

Add the following to Subsection 109.03(c):

109.03 Weighing Procedures and Devices.

(c) Project weighing system.

For aggregates weighed for payment, adjust scale weights of material to deduct the daily average moisture content in excess of 2 percentage points over optimum moisture as determined by AASHTO T 99 or the designated compaction method. If moisture determination is necessary, determine the daily average moisture content in accordance with AASHTO T 255, from not less than three representative samples of aggregate taken at random intervals each day that aggregate is being weighed.

Manual scales may be used if approved in writing by the CO and if the method of weighing meets all other contract requirements.

152 - Construction Survey and Staking 152.00_National_12_12_2016

Add the following to Subsection 152.04(c):

152.04 General.

(c) Material.

Use required stake dimensions and materials. Pre-paint the top 2 inches of all stakes and lath, or mark them with plastic flagging. Use designated colors for paint or flagging. Mark all stakes with a stake pencil that leaves a legible imprint, or with waterproof ink.

Do not use aerosol spray paints.

Use moisture-resistant paper for survey notes. Keep notes in books with covers that will protect the contents and retain the pages in numerical sequence.

Make the following changes to Subsection 152.05:

152.05 Survey and Staking Requirements.

Delete Subsection 152.05(d)(2) and replace with the following:

(d) Slope and reference stakes.

(2) Conventional survey methods. When required, locate slope stakes on designated portions of the road. Locate the slope stake catch points and use them to establish clearing limits and slope stake references.

Mark slope stakes with the station, the amount of cut or fill, the horizontal distance to centerline, and the slope ratios.

Place slope reference stakes at least 10 feet outside the clearing limit and mark with the offset distance to the slope stake. Place sight stakes when required.

Prior to clearing and grubbing operations, move the slope stake outside the clearing limit to the slope reference stake. After clearing and grubbing and before excavation, reset the slope stakes in their original position.

Use the designated method to establish the slope stake catchpoint.

Method I—Computed Method. Use the template information shown in the plans or other Government-provided data to calculate the actual location of the catchpoint. The slope stake “catchpoint distance” provided may be used as a trial location to initiate slope staking.

Recatch slope stakes on any section that does not match the staking report within the tolerances established in Table 152-2.

Method II—Catchpoint Measurement Method. Determine the location of slope stake catchpoints by measuring the catchpoint distances shown in the plans or other Government-provided data.

Add the following to Subsection 152.05(e):

(e) Clearing and grubbing limits.

Mark the clearing limits with flagging or tags on trees to be left standing, or on lath. Make markings intervisible, and no more than 90 feet apart.

After establishing clearing limits, move the location line stake outside the clearing limits for station identification purposes, and mark it with horizontal distance to location line.

Replace Table 152-1 with the following:

Table 152-1 Construction Survey and Staking Tolerances Table 152-1

Construction Survey and Staking Tolerances (1)

Staking Phase Horizontal Vertical

Control points set from existing Government control points- Tolerance Class A

±0.03 feet (±10 millimeters)

±0.01 feet × N

(±3 millimeters × N )(2)

Mapping, topography, and cross-section Points- Tolerance Class A

±0.16 feet (±50 millimeters)

±0.16 feet (±50 millimeters)

Centerline points (3) including (PC), (PT), (POT),(POC), and references- Tolerance Class A

±0.06 feet (±20 millimeters)

±0.06 feet (±20 millimeters)

Slope-stake and slope-stake references- Tolerance Class A (4)

±0.16 feet (±50 millimeters)

±0.16 feet ±50 millimeters)

Culverts, ditches, and minor drainage structures stakes- Tolerance Class A

±0.16 feet (±50 millimeters)

±0.06 feet (±20 millimeters)

Retaining walls stakes ±0.06 feet (±20 millimeters)

±0.03 feet (±10 millimeters)

Curb and gutter stakes ±0.06 feet (±20 millimeters)

±0.03 feet (±10 millimeters)

Bridge substructures stakes ±0.03 feet (±10 millimeters)(5)

±0.03 feet (±10 millimeters)

Bridge superstructures stakes ±0.03 feet (±10 millimeters)(5)

±0.03 feet (±10 millimeters)

Clearing and grubbing limit stakes- Tolerance Class A

±1.00 feet (±300 millimeters)

Roadway subgrade finish stakes- Tolerance Class A (6)

±0.16 feet (±50 millimeters)

±0.03 feet (±10 millimeters)

Roadway finish grade stakes (6) ±0.16 feet (±50 millimeters)

±0.03 feet (±10 millimeters)

Table 152-1 Construction Survey and Staking Tolerances (continued) (1)

Staking Phase Horizontal Vertical

Control points set from existing Government control points –Tolerance Class B (7)

±0.16 feet (±20 millimeters)

±0.16 feet ×

(±20 millimeters × )(2)

Mapping, topography, and cross-section points–Tolerance Class B (7)

±1.00 feet (±300 millimeters)

±0.50 feet (±150 millimeters)

Centerline points including (PC), (PT), (POT),(POC), and references–Tolerance Class B (7)

±0.16 feet (±20 millimeters)

±0.16 feet (±20 millimeters)

Slope-stake and slope-stake references– Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet ±50 millimeters)

Culverts, ditches, and minor drainage structures stakes–Tolerance Class B (7)

±0.50 feet (±150 millimeters)

±0.16 feet (±20 millimeters)

Clearing and grubbing limit stakes–Tolerance Class B (7)

±2.00 feet (±600 millimeters)

Roadway subgrade finish stakes–Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet (±10 millimeters)

Roadway finish grade stakes–Tolerance Class B (7)

±0.50 feet (±50 millimeters)

±0.16 feet (±10 millimeters)

(1) At statistical 95 percent confidence level. Tolerances are relative to existing Government control points.

(2) N is the number of instrument setups.

(3) Centerline points: PC - point of curve, PT - point of tangent, POT - point on tangent, POC - point on curve.

(4) Take the cross-sections normal to the centerline ±1 degree.

(5) Bridge control is established as a local network and the tolerances are relative to that network.

(6) Includes paved ditches.

(7) Tolerance Class B for Very Low Volume Roads with an aggregate or native finished surface.

N

153 - Contractor Quality Control 153.02_National_11_1_2016

Delete Subsection 153.02 and replace with the following:

153.02 Qualifications.

Submit the following for approval with the quality control plan:

(a) Quality control manager (QCM). Furnish a QCM who has at least 2 years’ experience in construction, inspector, quality control and material testing on construction projects of similar type and scope.

(b) Testers. Provide testers with at least one year experience in the type of sampling and testing required, and with one of the following for the type of sampling and testing performed:

(1) NICET Level II certification in highway material or equivalent state or industry certification;

(2) Certification by a regional certification program (such as Western Alliance for Quality Transportation Construction (WAQTC), Northeast Transportation Technician Certification Program (NETTCP), Southeast Task Force for Technician Training and Qualification (STFTTQ), or Multi Regional Training and Certification (M-TRAC)); or

(3) At least one year employment by an AASHTO accredited laboratory performing equivalent sampling and testing.

153.03_National_11_1_2016

Add the following paragraph to the end of Subsection 153.03(b):

153.03 Quality Control Plan.

(b) Quality Control Procedures.

Submit written proposals for approval of alternate AASHTO or State approved test methods. Alternate methods may be allowed based on documented equivalence to the specified method.

153.07_National_11_1_2016

Delete Subsection 153.07 and replace with the following:

153.07 Records and control charts.

Maintain complete testing and inspection records by pay item number and make them accessible to the

CO.

155 - Schedules for Construction Contracts 155.00_National_11_9_2016

Delete Section 155 in its entirety.

Delete Section 155.

156 - Public Traffic 156.00_National_2_5_2019

Delete Section 156 in its entirety and replace with the following:

Section 156. – PUBLIC TRAFFIC Description

156.01 This work consists of controlling and protecting public traffic adjacent to and within the project.

Material

156.02 Conform to the MUTCD and the following Sections and Subsections:

Permanent Traffic Control 633

Traffic Signing and Marking Material 718

Concrete Barriers and Precast Guardwalls 618

Temporary plastic fence 710.11

Construction Requirements

156.03 General. Accommodate traffic according to MUTCD, approved traffic control plan and this section. Perform work in a manner that ensures safety and convenience of the public. Unless otherwise provided for in Table 156-1, keep existing roads open to all traffic during road improvement work, and maintain them in a condition that will adequately accommodate traffic. Delays may not exceed <number> minutes at any one time followed by an open period of no less than <number> minutes.

Accommodate public traffic on roads adjacent to and within the project until the project is accepted according to Subsection 106.07(b).

Submit traffic control plan at least 30 days prior to intended use. Perform no work that interferes or conflicts with traffic or existing access to the roadway surface until a traffic control plan has been approved.

Post construction signs and traffic control devices in conformance with MUTCD and Forest Service EM 7100-15. All required signs will be in place and approved prior to beginning work on project.

If the Contractor agrees in writing to allow public traffic to use a new road being constructed prior to completion, it will be considered an existing road for traffic control purposes.

156.04 Temporary Traffic Control. Install and maintain temporary traffic control devices adjacent to and within the project as required by the approved traffic control plan and the MUTCD. Install and maintain traffic control devices as follows:

(a) Furnish and install traffic control devices before the start of construction operations.

(b) All detours outside of clearing limits will be approved in writing by the Contracting Officer as part of the traffic control plan.

(c) Install only those traffic control devices needed for each stage or phase.

(d) Relocate temporary traffic control devices as necessary.

(e) Remove devices that no longer apply to the existing conditions.

(f) Immediately replace any device that is lost, stolen, destroyed, or inoperative.

(g) Keep temporary traffic control devices clean.

(h) Remove all temporary traffic control devices upon contract completion or when approved.

(i) When required, use flaggers certified by the American Traffic Safety Services Association, the National Safety Council, the International Municipal Signal Association, a state agency, or other acceptable organization. Perform the work described under MUTCD Part 6. Use type III, VII, VIII, or IX retroreflective sheeting on flagger paddles. Do not use flags. Flaggers must wear high visibility safety apparel as required by MUTCD 6E.02.

156.05 Temporary Closures. Road segments may be closed as shown in Table 156-1. The maximum consecutive days of closure shall be followed by a minimum number of consecutive days open to traffic as shown. Maintain traffic control devices during closure period(s). Appropriate barricades and signs will be erected and maintained as shown in the traffic control plan or as otherwise designated.

Prior to closing roads during construction, give written notice to the Contracting Officer at least 10 days in advance.

Table 156-1 Temporary Road Closures

Road Number From Terminus To Terminus

Maximum Consecutive Days of Closure

Minimum Consecutive Days Open

<number> <MP or description>

<MP or description> <number> <number>

156.06 Acceptance. Public traffic work will be evaluated under Subsection 106.02.

Measurement and Payment

156.07 Do not measure Public Traffic for payment. Payment for contract work is provided indirectly. See Subsection 109.05.

157 - Soil Erosion and Sediment Control 157.04_National_11_1_2016

Delete Subsection 157.04 and replace with the following:

157.04 General.

Thirty (30) days prior to the start of construction, submit a written plan according to subsection 104.03 with all necessary permits that provides permanent and temporary erosion control measures to minimize erosion and sedimentation during and after construction. Do not begin work until the necessary controls for that particular phase of work have been implemented. Do not modify the type, size, or location of any control without approval.

When erosion control measures are not functioning as intended, take corrective action to eliminate or minimize pollutants in storm water discharges from the project.

207 - Earthwork Geotextiles 207.04_National_11_8_2016

Delete third sentence of Subsection 207.04 and replace with the following:

207.04(c)(1) First layer placement and compaction.

Spread the end-dump pile of cover material maintaining <number> inch(es) lift over the geosynthetic.

208 - Structure Excavation and Backfill for Selected Major Structures

208.07_National_11_8_2016

Add the following to Subsection 208.07:

208.07 Dewatering.

Construct diversions according to Subsection 157.10 Diversions. Submit dewatering plans according to Subsection 104.03.

211 - Roadway Obliteration 211.01_Forest_4_18_2018

211 – Full Recontour Roadway Obliteration 211.01_0402_03_01_2011

Delete Section 211 in its entirety and replace with the following.

Description.

211.01 This work consists of obliterating or decommissioning roads, including decompaction to 16 inches or to the depth of compaction, recontouring to the natural slope profile, mulching and planting with native material, and other incidental work. This includes furnishing all labor, equipment, supervision, transportation, supplies, and incidentals.

This work also consists of the removal of culverts and restoration of stream channels, including pumping or diverting of live streams, in channel rock placement, and other miscellaneous items required for execution of the work.

Roadway obliteration methods are designated as follows:

(a) Method 1. Obliterate the roadway by restoring to approximate original ground contours. Keep excavated material within the original construction limits. Finish slopes to provide gradual transitions in slope adjustments without noticeable breaks.

The finished surface shall remain rough not allowing water to flow directly down the fall line of the finished slope.

211.02 Definitions

(a) Coarse woody debris – woody material greater than 3-inch diameter on the small end and longer than 6 feet in length, including live trees removed from the roadway.

(b) Native mulch – includes topsoil, organic material, and coarse woody debris broken into smaller pieces that exist in the vicinity of the road.

(c) Soil and vegetative transplants – vegetation, which includes the plant or organic matter on the surface of the ground and the root system, transplanted from the roadway or adjacent area onto prepared (decompacted and recontoured) roadway. Transplanted material contains sufficient root mass and surrounding soil to maintain and incorporate nutrients, soil microbes and other organisms. Vegetative material includes native shrubs, sod, and bunch grass.

Obliteration Requirements

211.03 Conform to the following when obliterating roadways:

(a) Vegetation removal. Remove vegetation including dead woody debris, trees, stumps, roots and other vegetation within the limits of the immediate obliteration area prior to starting excavation operations and pile temporarily until recontouring has been completed. Preserve suitable vegetation in road prism to be transplanted after compacted soil has been loosened. Place clearing slash back on top of recontoured road segments and completed channel side slopes in stable positions that do not interfere with stream channel flow according to Subsection 211.03(e).

(b) Decompaction of roadbed. Loosen compacted soil down to 16 inches over the entire width of the roadbed and ditches through the use of a trackhoe excavator bucket.

(c) Recontouring of roadway. Following decompaction of the roadway, pull the fill material up and place on the loosened roadbed between the top of cut and original ground, forming a slope approximating natural contours as shown on the plans, but also retaining a rough surface to slow the flow of water across the new fill slope. Fill in all ditches and other water traps, and remove all berms. Blend all finished slopes to match the surrounding terrain. Notify the inspector a minimum of 48 hours in advance of areas where full recontouring may not be achievable. If full recontouring is determined not to be practical or attainable by the CO, the CO may approve a partial recontour at a specific site.

(d) Transplanting of vegetative material. Transplant soil and vegetative material clumps from the road surface and adjacent areas into the recontoured road prism at a minimum rate of 30 plantings per 100 lineal feet of roadway measured along centerline. Excavate transplanting clumps of sufficient size to maintain root systems and adequate soil to enhance favorable growth. If the soil and vegetative clump breaks up and cannot be maintained, transplant the loose material right side up as best as possible.

(e) Treatment of the recontoured roadway surface. Cover the disturbed area with a combination of transplants, native mulch, coarse woody debris, or agricultural straw (certified weed-free). If the transplants, native mulch, and course woody debris cannot meet the minimum coverage requirements of 50% coverage then coverage will be augmented with agricultural straw to obtain a minimum of 50% to a maximum of 80% ground coverage. The priority of coverage is as follows; soil and vegetative transplants, native mulch, and coarse woody debris, then apply agricultural straw at a rate of 1 bale per 400 square feet only when necessary to achieve the required coverage. Avoid burying any cover material. The end goal of the treatment should be to match the adjacent landscape coverage as closely as possible.

Place the course woody debris in various size classes over the recontoured roadway in a perpendicular pattern to the newly constructed slope to impede and slow the flow of water across the new slope.

Do not leave vegetation removed under Subsection 211.03(a) "hung-up" in remaining live vegetation.

(f) Treatment of stream channel crossings. For intermittent and perennial stream channels remove all fills and recontour to the original ground slopes.

(1) Stream channel crossings with culverts. Notify the inspector a minimum of 48 hours in advance for stream channel work to ensure the inspector is present. For live stream crossings, install one or more sedimats at an approved location downstream of the culvert that span the entire width of the stream prior to starting work. Construct a stream diversion using pipe, a lined open channel, pumps, or other approved methods to dewater the crossing prior to culvert removal. Dispose of metal culverts by removal from National Forest land. Treat removed log culverts as coarse woody debris and use as directed in Subsection 211.03(e).

3.

4. Reconstruct the stream channel width, depth, and banks after the drainage structure has been removed to have approximately the same dimensions and general shape as those outside the crossing area. Remove all bedding materials and incorporate into the surrounding recontouring work. Construct a uniform grade from the natural stream channel above the inlet location to the natural channel below the outlet to create a free draining, unconstricted channel for the entire length unless otherwise noted on the plans. Incorporate excavated material into the adjacent recontouring areas. Conserve suitable rock encountered for construction of stream grade control structures and individual rock placement in the new channel as shown on the plans and as directed by the engineer.

5.

6. Re-water the newly constructed channel slowly. Remove all stream diversion materials prior to final site rehab and remove the sedimats from the impacted stream channel and lay them out flat on the adjacent recontoured roadbed.

7.

(2) Stream channel crossings without culverts. Notify the inspector a minimum of 48 hours in advance for stream channel work to ensure inspector is present. Prior to crossing open stream channels with live water where the culvert has been previously removed, install one or more sedimats at an approved location downstream of the crossing that span the entire width of the stream prior to starting work. Place logs suitable for support of crossing equipment in the channel parallel to the stream bank.

Provide sufficient spacing between the logs so that the stream flow is not constricted.

Remove all fill material down to original ground and incorporate into the surrounding recontouring work.

Remove the crossing logs following the final equipment crossing and utilize as coarse woody debris as directed in Subsection 211.03(e). Remove the sedimats from the stream channel and lay them out flat on the adjacent recontoured roadbed, Rehabilitate all disturbed stream channel side slopes and adjacent recontoured roadway areas that drain onto the stream channel side slopes using soil and vegetative transplants, native mulch, and certified weed free straw as necessary to obtain a minimum ground coverage of 95%.

(g) Treatment of ditch relief culverts. Treat ditch relief culverts as follows:

Remove vegetation and decompact the roadway in accordance with Subsections 211.03(a) and (b).

Remove the culvert and appurtenances in its entirety and dispose of by removal from National Forest land.

Perform the work required by Subsections 211.03(c) through 211.03(e).

(h) Treatment of seeps and wet areas. Treat seeps and wet areas as follows:

Remove vegetation and decompact the roadways in accordance with Subsections 211.03(a) and (b).

Shape the hillslope to drain water across the roadway. Rehabilitate all disturbed wet area and drain side slopes and adjacent recontoured roadway areas using soil and vegetative transplants, native mulch, and certified weed free straw as necessary to obtain a minimum ground coverage of 80%.

211.04 Acceptance. Roadway obliteration will be evaluated under Subsection 106.02

Measurement

211.05 Measure the Section 211 items listed in the bid schedule according to Subsection 109.02.

Payment

211.06 The accepted quantities will be paid at the contract price per unit of measurement for the Section 211 pay items listed in the bid schedule. Payment will be full compensation for the work prescribed in this Section. See Subsection 109.05. Payment for treatment of stream channel crossings, treatment of seeps and wet areas, treatment of ditch relief culverts, and removal and disposal of culverts is indirect to Pay Item 21101.

Proposed Pay Items:

Item Number Description Unit of Measurement *21101 Roadway Obliteration, Method 1 Mile

* Item is Contract Quantity per FP-14, subsection 109.02(b)

213 - Subgrade Stabilization 213.05_National_11_2_2016

Delete the second paragraph in Subsection 213.05 and replace with the following:

213.05 General.

Prepare the subgrade according to Subsection 303.05. Scarify or pulverize the subgrade to the required depth. Adequately blend the material to produce a homogeneous mixture within 2 percent of the optimum moisture content.

302 - Minor Crushed Aggregate 302.04_National_7_18_2017

Add the following to Subsection 302.04 and 302.04(a)

302.04 Placing Crushed Aggregate.

Written approval of the surface is required before placing aggregate.

(a) Roadway aggregate.

For pit run or grid-rolled material, furnish material smaller than the maximum size, no gradation will be required otherwise. After processing on the road, remove all oversize material from the road and dispose as directed by the CO.

302.05_National_6_11_2020

Replace the first paragraph of subsection 302.05(a) with the following:

302.05 Compacting and Finishing Crushed Aggregate

(a) Roadway aggregate. Unless otherwise specified compact according to method 2. Finish surface according to Subsection 301.06.

303 - Road Reconditioning 303.07_National_7_18_2017

Add the following to Subsection 303.07:

303.07 Roadway Reconditioning.

Remove cattleguard decks. Clean the deck and the area beneath the cattleguard of soil and other material to the bottom of the original foundation over the entire width of the installation. Dispose of waste at designated sites or according to Subsection 204.14. Reinstall the cattleguard deck.

314 - Stockpiled Aggregates 314.00_National_7_18_2017

Add the following to Subsection 314.01:

314.01 Description.

Pit or quarry development work consists of clearing, grubbing, stripping topsoil, removing overburden, constructing access roads, conducting restoration activities, and performing other incidental work required for pit or quarry development.

Add the following to Subsection 314.04 after the first sentence of second paragraph:

314.04 Stockpile Site.

Submit a plan of operation according to Section 105.02. Perform the work in accordance with MSHA 30 CFR, part 56.

407 - Chip Seal 407.01_National_7_18_2017

Delete the first sentence of Subsection 407.01 and replace with the following:

407.01 Description.

407.01 This work consists of applying a single, double, or triple course chip seal with emulsified asphalt.

407.07_National_5_17_2017

Delete Subsection 407.07 (b) and (e) replace with the following:

407.07 Weather Limitations.

(b) Surface temperature in the shade is 60 °F (16 °C) and rising.

(e) Rain or temperatures below 40 °F (4 °C) are not forecast or anticipated for at least 24 hours after application;

407.08_National_5_17_2017

Delete the second paragraph of Subsection 407.08 and replace with the following:

407.08 Production Start-Up Procedures.

On the first day of placement of each surface treatment layer, or whenever there is a change in the surface texture or aggregate gradation, construct a 500-foot control strip that is one-lane wide.

Construct the control strip using material, lay-down, and compaction procedures intended for the remainder of the surface treatment according to subsection 407.09 and 407.10. Cease production after construction of the control strip until the material and the control strip are evaluated and accepted.

407.09_National_5_17_2017

Add the following to Subsection 407.09:

407.09 Asphalt Application.

On existing aggregate surfaces, prime the surface according to Section 411. Allow the primed surface to cure at least 5 days for cutback asphalt or 24 hours for asphalt emulsions. Ensure that the primed surface is dry for surface treatments using asphalt binder or slightly damp for surface treatments using emulsified asphalt.

407.11_National_3_8_2021

Delete Table 407-1 and replace with the following:

407.11 Placing and Finishing. Table 407-1.

Table 407-1 Approximate Quantities of Material for

Single-Course Chip Seal

D es ig na tio n Nominal

Maximum Size of Aggregate

Aggregate Gradation (1)

Estimated Quantity of Aggregate (2) pounds/yd2

Estimated Quantity of Emulsified Asphalt (3) gallons/yd2

Estimated Quantity of Asphalt Binder (3) gallons/yd2

1A 3/4 inch A 40 – 49 0.40 – 0.55 0.27 – 0.38

1B 1/2 inch B 26 – 29 0.31 – 0.44 0.20 – 0.31 1C 3/8 inch C 20 – 26 0.20 – 0.35 0.13 – 0.24 1D No. 4 D 15 – 20 0.15 – 0.22 0.11 – 0.18

(1) See Table 703-7 for aggregate gradations.

(2) Aggregate masses are for aggregates having a bulk specific gravity of 2.65, as determined by AASHTO T 84 and T 85. Make proportionate corrections when the aggregate furnished has a bulk specific gravity above 2.75 or below 2.55.

(3) Adjust the asphalt content for the condition of the road.

407.12_National_5_17_2017

Rename Subsection 407.12

407.15_National_5_17_2017

Delete Subsection 407.15 and replace with the following:

407.15 Payment.

407.15 The accepted quantities will be paid at the contract price per unit of measurement for the Section 407 pay items listed in the bid schedule. See Subsection 109.05.

409 - Micro Surfacing 409.07_National_11_4_2016

Delete Subsection 409.07(b) and replace with the following:

409.07 Weather Limitations.

(b) Surface temperature in the shade is 45 °F (7 °C) and rising;

411 - Asphalt Prime Coat 411.05_National_7_17_2017

Delete Subsection 411.05(d) and replace with the following:

411.05 Weather Limitations.

(d) Weather is not forecasted to be foggy or rainy 24 hours following application.

411.08_National_11_4_2016

Delete the second paragraph of Subsection 411.08 and replace with the following:

411.08 Maintenance.

Spread additional blotter to cover unabsorbed cut-back asphalt. Spread additional choker aggregate to cover unabsorbed emulsified asphalt. Remove excess blotter or choker aggregate after the asphalt is absorbed.

411.09_National_11_4_2016

Delete the second sentence of Subsection 411.09 and replace with the following:

411.09 Acceptance.

Crushed aggregate, blotter, and choker aggregate will be evaluated under Subsection 106.03.

412 - Asphalt Tack Coat 412.05_National_11_4_2016

Delete Subsection 412.05(b) and replace with the following:

412.05 Weather Limitations.

(b) Ambient air temperature is above 40 °F (5 °C) and rising; and

413 - Asphalt Pavement Milling 413.00_National_7_17_2017

Add the following to Subsection 413.01:

413.01 Description.

This work also includes cutting asphalt pavement.

Make the following changes to Subsection 413.03:

413.03 Milling.

Add the following to the end of the first paragraph:

Prior to milling, cut existing asphalt pavement at the locations and to the extent shown on the plans.

Cut the asphalt pavement to form a vertical face in unfractured asphalt surfacing.

Delete the first sentence of paragraph five and replace with the following:

Remove and completely recover all loose milled material.

Delete the second paragraph of Subsection 413.05and replace with the following:

413.05 Measurement.

Do not measure asphalt pavement milling or asphalt pavement cutting.

Delete the first sentence of Subsection 413.06 and replace with the following:

413.06 Payment.

Payment is indirect to Section 403 pay items listed in the Schedule of Items.

703 - Aggregate 703.05_National_7_18_2017

Delete Subsection 703.05(c)(3) and Replace with the following:

703.05 (c) Surface course aggregate. (3) Plastic Index

(3) Plastic Index, AASHTO T 90

If the percent passing the No. 200 sieve is less than 12% 2 to 9 If the percent passing the No. 200 sieve is greater than 12% Less than 2

703.05_National_3_17_2021

Delete 703.05 and replace with the following:

703.05 Subbase, Base, Surface Course, and Screened Aggregate.

(a) Subbase or base aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-2

(2) Liquid limit, AASHTO T 89 25 max.

(3) Plastic limit, AASHTO T 90 Nonplastic

(4) Los Angeles abrasion, AASHTO T 96 40% max.

(5) Sodium sulfate soundness loss (5 cycles), 12% max.

AASHTO T 104

(6) Durability index (coarse), AASHTO T 210 35 min.

(7) Durability index (fine), AASHTO T 210 35 min.

(8) Fractured faces, ASTM D 5821 50% min.

(9) Free from organic matter and lumps or balls of clay

Do not use material that breaks up when alternately frozen and thawed or wetted and dried.

Obtain the aggregate gradation by crushing, screening, and blending processes as necessary. Fine aggregate, material passing the No. 4 sieve, shall consist of natural or crushed sand and fine mineral particles.

(b) Surface course aggregate. Furnish hard, durable particles or fragments of crushed stone, crushed slag, or crushed gravel conforming the following:

(1) Gradation Table 703-3

(2) Liquid limit, AASHTO T 89 35 max.

(3) Plastic Index, AASHTO T 90

a) If the percent passing the No.

This is the start of the file's text. The full file is on GovTribe.