Attachment 3 - A0002 SOW Twin Ponds Paving Project.pdf

PDF 2 MB Posted

Attached to
Twin Ponds Paving Project Federal contract opportunity
Solicitation number
12445221Q0037
Issued by
Department of Agriculture Forest Service

View the file

Other files for this federal contract opportunity

Other files attached to Twin Ponds Paving Project, newest first.
File Type Posted
Attachment 1 - A0002 Twin Ponds Specifications.pdf PDF
Amendment 0002 12445221Q0037.pdf PDF
Attachment 2 -Project Map.jpg JPG image
Request for Quote 12445221Q0037.pdf PDF
Attachment 1- Twin Ponds General Specifications.pdf PDF
Attachment 3 -SOW Twin Ponds Paving Project.pdf PDF
Attachment 4 - Wage Determinations.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF AGRICULTURE

FOREST SERVICE REGION 8

FRANCIS MARION NATIONAL FOREST

FRANCIS MARION RANGER DISTRICT

Twin Ponds Paving Project

Forest Engineer Date District Ranger Date Planning, Engineering, and Date Recreation Staff Officer Forest Supervisor Date

Amendment 0002

TWIN PONDS PAVING PROJECT

Francis Marion Ranger District

TWIN PONDS PAVING PROJECT

GENERAL REQUIREMENTS

SUMMARY OF WORK

1. PROJECT LOCATION – The Twin Ponds Rifle Range Road is located on the Francis Marion Ranger District on the Francis Marion National Forest.

a. LATTITUDE/ LONGITUDE: 33.049190, -79.640045

2. SUMMARY OF WORK – Contractor shall provide all labor, equipment, materials, tools, transportation, supplies (including safety), supervision, and perform all work necessary to pave the road connecting the Rifle Range. Construction will be performed at the Francis Marion Ranger District in accordance with plans, and specifications. Work shall include but not be limited to the following:

A. Mowing B. 1000 Tons of Aggregate grade FLBC C. Recondition Base Aggregate and Compaction

- Place Prime Coat on Roadbed.

- Place Surface Asphalt - the Asphalt surface must be 18 feet wide with a thickness of 2 inches and a 2% crown.

(Use SC Type #1 aggregate surface, see Surface composition Mix Table)

Mobilization is considered an indirect cost of this contract and will not be compensated as a separate work item.

0 1

File details come from the government source that posted it. Updated .