Attachment 1 Statement of work FA930123Q0018.pdf
PDF 413 KB Posted
- Attached to
- Waste Baler - Edwards, CA Federal contract opportunity
- Solicitation number
- FA930123Q0018
About this file
This statement of work outlines the requirements for a trash baler removal and installation project at Edwards Air Force Base in California. The contractor shall remove the existing baler and dispose of it in a 40-yard bin provided by the government. The contractor must then install a new baler meeting the following specifications: a minimum 80HP motor; a 10-inch cylinder; a 95x56-inch feed opening; a maximum 60x45x30-inch bale chamber; a cycle time of minimum 15 seconds and 4 cycles per minute; a minimum baling capacity of 14 tons per hour; and a 480V, 200-250AMP hopper/conveyor system. The related federal contract opportunity is solicitation number FA930123Q0018 for a waste baler installation at Edwards Air Force Base, issued by the Department of the Air Force Materiel Command Test Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Consolidated QA-FA930123Q0018.docx | DOCX document | |
| Solicitation - FA930123Q0018.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
FOR REMOVAL OF EXISTING TRASH
BALER AND INSTALLATION OF NEW
AT EDWARDS AFB, CALIFORNIA
Contract # FA9301-23-Q-0018 Date:
FA9301-23-Q-0018 Page 2 of 2
Scope of Work: The Contractor shall furnish all labor, materials, tools, equipment, supervision and applicable licenses and permits necessary to perform the Removal and Installation of a trash Baler at Edwards Air Force Base in a manner that will ensure the neat, orderly and professional appearance of facility 7996. The Contractor shall be responsible for the removal of the existing baler and placed into 40yd bin provided by the government and installation of the new baler.
Contractors will ensure appropriate disposal of items in addition to ensuring all areas are clean during removal/installation and after completion. Contractor shall be responsible for all HAZWASTE clean-up and must be state certified. Contractors will follow 412th CES Infrastructure flight directions.
Baler specifications are as follows:
a. HP- minimum 80HP
b. Cylinder- minimum 10”
c. Feed Opening- minimum 95”x56”
d. Bale Chamber- maximum 60”x45”x30”
e. Seconds per Cycle- minimum 15seconds
f. Cycles per minute-minimum 4
g. Tons per hour- minimum 14
h. Hopper/Conveyor System- required
i. 480V- minimum
j. 200-250 AMPS
File details come from the government source that posted it. Updated .