Attachment 1 - Statement of Work.pdf

PDF 109 KB Posted

Attached to
8 Sept 22-Amendment 1, Q&A Document added to Attachments Pot and Pan Washers Installation/Removal Federal contract opportunity
Solicitation number
FA301622U0286
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Other files attached to 8 Sept 22-Amendment 1, Q&A Document added to Attachments Pot and Pan Washers Installation/Removal, newest first.
File Type Posted
SAM RFQ Amendment 1-QA.pdf PDF
SAM RFQ-Pot and Pan.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

REMOVAL AND INSTALLATION OF POT and PAN

WASHING MACHINES

AT

BUILDING 9110, 6592

JOINT BASE SAN ANTONIO LACKLAND

1. SCOPE: Contractor shall provide all personnel, equipment, tools, materials, labor, transportation, and supervision necessary to remove old Pot & Pan Washing machines and hardware, provide and install new Pot & Pan Washing machines and hardware, and ensure machines operate properly in the following buildings:

Building 9110, 1315 Truemper Street, JBSA Lackland, TX 78236-5552 Building 6592, 1621 Luke BLVD, JBSA Lackland, TX 78236-5545

a. All dishwashers will initially be delivered to the address below. The government will transport the dishwashers to the appropriate buildings prior to installation and the contractor installation crew will complete the installation.

410 N. Frank Luke drive Bldg. 1530-North end, Bay E, Door 22 San Antonio, TX 78226 Phone: 210-925-5111

b. All activities shall be coordinated with the Food Service Staff Office and Dining Facility Managers. All work shall be accomplished in accordance with product manufacturer’s recommendations and industry standards, and meet all municipal, state, and federal codes, standards, and guidelines.

2. DESCRIPTION OF WORK: The contractor shall remove old Pot & Pan Washing machine and hardware. Then install new hardware and new Pot & Pan Washing machine in the facilities identified in Paragraph 1.

The steps described below may not be all inclusive, the contractor is required to complete removal and installation to endure properly functioning equipment before leaving the site.

The contractor shall:

a. Install only during non-feeding times; see (b.) feeding hours below

b. Bldg. 9110 and 6592:

Breakfast: M-F (0600-0830) Sat-Sun (0600-0800) Lunch: M-F (1130-1400) Sat-Sun (1130-1330) mailto:william.moulder.1@us.af.mil

Dinner: M-F (1700-1930 Sat-Sun (1700-1900)

c. Turn off all power to the Pot & Pan Washing machine, and disconnect power from Pot & Pan Washing machine from the facility.

d. Disconnect all plumbing i.e., water lines, drain lines booster water lines.

e. Disconnect all ventilation lines, and any and all soap dispenser.

f. Once all connections are disconnected, remove the Pot& Pan Washing machine and place it/them on the loading dock at the rear of the Dining Facility. The Government will remove the machine(s) and dispose of them from the loading dock area.

g. Place new Pot & Pan Washing machines in the locations where the old machines were, run all plumbing lines and hardware.

h. Expand/Modify dish table if necessary

i. Reconnect all electrical and Soap and other dispensers that were disconnected.

j. Start up the machine(s) ensuring it/they operate as the manufacture’s guidance states.

k. Ensure water lines do not leak, all drain lines are lined up correctly and drain water goes down the drains per plumbing requirement/standards.

l. Ensure all electrical is wired to meet electrical standards.

3. SAFETY: The contractor shall ensure compliance with OSHA Safety and Health Regulations, prior to daily commencement of work, the contractor shall properly secure the work site and locate and secure tools, equipment, and material as necessary to ensure the safety and protection of personnel, equipment and property.

4. ENVIRONMENTAL COMPLIANCE: The contractor shall be responsible for the removal and disposal of all waste generated from unpacking and installation of these products. The Contractor shall notify the HAZMAT Pharmacy of any hazardous chemicals.

5. WORKMANSHIP AND REGULATORY COMPLIANCE. This is an occupied building.

Materials on site must be kept in such a manner that continuing working operations is not impaired. The contractor shall take precautions to prevent damage to government property. The contractor shall repair or replace damaged items at no additional cost to the government. All analysis, workmanship, and quality control performed under this contract shall conform to published and recognized authoritative sources of good industry standard and practices in compliance with OSHA Standard 1926 Subparts H and O. The contractor will be responsible for any additional cost required to ensure compliance to said standards and practices.

6. WASTE DISPOSAL AND ENVIRONMENTAL PROTECTION. At the end of each work day, the contractor shall remove all residual equipment, components, materials, and /or debris generated and disposed of in appropriate government containers. All areas shall be cleaned of debris at the end of each working day and prior to final acceptance of the work.

7. SECURITY AND CLEAN-UP. All facilities shall be secured at the end of each day. The contractor shall ensure that all work accomplished is limited to the terms and conditions outlined in this SOW. The contractor shall coordinate with the government representative(s) designated during the pre-con upon arrival and prior to leaving the work site each day. The government representative(s) will be located in building 7065, Suite 228.

8. WARRANTIES. Installation shall be warranted from defect for one year, and all standard system warranties shall apply. Warranty shall begin the day of completion and acceptance by 802 Force Support Group.

9. RECORDS MANAGEMENT. The Contractor shall manage all data created for

Government use or legally controlled by the Government, in support of the functional activity or required by AF publication, IAW the AF Records Management procedures in Air Force Instruction (AFI) 33-322, Air Force Manual (AFMAN) 33- 363 and Air Force Instruction (AFI) 33-364 (or their subsequent replacements).

10. COMPLETION OF WORK. The contractor shall ensure that work for this project is performed in accordance with the criteria herein, and that all equipment and systems shall be fully operational at the completion of work for this project. All surfaces shall be cleaned; tiled floors swept & mopped.

II. GENERAL INFORMATION

1. POINTS OF CONTACT. Upon award, the contractor will provide to the contracting officer a list of all contract personnel who will be performing services on this contract.

2. NORMAL HOURS OF WORK: Monday-Friday 07:30 AM to 4:30 PM, except government holidays.

3. GOVERNMENT FURNISHED SERVICES.

3.1 UTILITIES. The government will provide utilities (water and electricity) and emergency, fire and security police response services.

3.2 POLICE PROTECTION. The 802d Security Forces Squadron shall provide security and law enforcement response and service to the contractor.

3.3 FIRE PROTECTION. The Lackland Fire Departments shall provide initial response, EMS, and fire protection services to the contractor.

4. TRAFFIC REGULATIONS. The contractor employees shall comply with all base traffic regulations, and are subject to random vehicle speed control checks. The contractor’s personnel cited for speeding on the installation may suffer loss of base driving privileges, debarment from the base, or other administrative action. The use of cell phones, except hand-free phones, is prohibited while driving on military installations in San Antonio, TX.

5. QUALITY ASSURANCE. The government will evaluate the contractor’s performance during various phases of the project. Quality assurance may be performed randomly by 802d TRW/SE (Wing Safety), 802d FSS/FSVF (Food Service), and /or the contracting officer and representatives. They may observe performance to monitor quality of work, insure cleanliness, and compliance with safety and security procedures. At the time of award, the contractor shall designate a program manager who will be available throughout the project to discuss with the government inspectors any quality issues that may arise.

6. INSPECTION AND ACCEPTANCE. All services performed under this SOW are subject to inspection by the government at the completion of each task. The contractor, at no additional expense to the government, shall promptly correct unsatisfactory services.