Attachment 1 Statement of Work.docx

DOCX document 69 KB Posted

Attached to
Remove and Replace Furnace, A/C, and Ductwork in Sidney, MT Federal contract opportunity
Solicitation number
12805B23Q0784
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

About this file

This statement of work outlines requirements for a federal contract to remove and replace a furnace, air conditioner, and ductwork at the Northern Plains Agricultural Research Laboratory in Sidney, Montana. The selected contractor will be responsible for furnishing all labor, materials, and equipment to remove an old furnace and ductwork and install a new 100,000 BTU 95% efficient furnace, 4-ton 13.8 SEER air conditioner and coil, and new ductwork system. The contractor must meet all applicable building codes and standards and obtain any required permits. Additional requirements include coordinating utility outages, submitting material submittals for approval, cleaning up the site upon completion, and providing a one-year warranty on all work.

View the file

Other files for this federal contract opportunity

Other files attached to Remove and Replace Furnace, A/C, and Ductwork in Sidney, MT, newest first.
File Type Posted
Questions from Industry -15 Aug 2023.pdf PDF
12805B23Q0784 Combined Synopsis Solicitation.pdf PDF
Attachment 2 Wage Determination - 2015-5395 Rev 20 Dated 25 July 2023.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Furnace and ac install

Soil prep AC and furnace install

Northern Plains Agricultural Research Laboratory USDA-ARS Sidney, MT

Project Title: furnace and ac install

1. Government Points of Contact

a) Contracting Specialist (CS):

David Hildebrand 785-712-3224 david.hildebrand@usda.gov

b) Occupational Health and Safety Representative:

Shanna Henk 970-492-7033 shanna.henk@usda.gov

c) Engineer Project Manager (EPM)/Contracting Officer’s Representative (COR):

Mark McWilliams
(970) 631-7513
mark.mcwilliams@ars.usda.gov

d) Location Monitor (LM):

Eric Steinbeisser 406-433-9421 eric.steinbeisser@usda.gov

2. Location: The site of work is the Northern Plains Agricultural Research Laboratory, located in Sidney, MT.

3. Site Visit: A site visit and inspection tour is highly encouraged. Interested vendors may contact Eric Steibeisser with the information provided above to schedule a site visit. Drawings for this locations are not available.

4. Project Requirements: install furnace and AC in soil prep

Description of Work

5. scope of work.

The work consists of furnishing all labor, materials, equipment and performing all work to remove old furnace and ductwork and install new 100,000 BTU 95% efficient or better furnace and 4 ton 13.8 seer or better 3phase AC unit and coil and new ductwork system and controls.

Work and materials for the installation of furnace and AC shall meet the uniform building code, state of Montana building code, and local building code.

6. Utility Outages: The contractor is fully responsible for coordinating utility outages needed for the performance of this task order. Contractor shall up-date the COR and LM with all relevant details of any outages or challenges related to the utility provider coordinated outages. Contractor is responsible for any fees associated with planned/scheduled utility outages.

7. References & Standards: All construction shall comply with ARS Facilities Design Standards (ARS Manual 242.1, 5-01-12), ARS Energy, Water, and Sustainability Policy (ARS Policy & Procedures 134.2, 11-12-13), ARS Energy, Water, and Sustainability Policy Bulletin (ARS Policy & Procedures Bulletin 15-134.2), governing Building Codes, and all applicable local, regional, State, and Federal regulations. Where one or more Codes or regulations conflict, the more stringent shall apply.

8. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, the Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the obligation of the Contractor.

9. Existing Installations/Demolition:

a) Contractor shall modify existing installations as needed to accommodate the new installation. Where applicable contractor shall coordinate demolition or modification of existing installations with the Owner. All disturbances of existing systems shall be thoroughly coordinated with the Owner to prevent disconnecting equipment that may potentially jeopardize in-progress research.

10. Quality Control: The work performed under this contract shall be subject to continuous audit by the Location Monitor. Quality control is the exclusive responsibility of the Contractor.

11. Temporary Facilities:

a) Temporary utilities (water and electricity) may be furnished to the Contractor by the Government, if so requested. The Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through its own negligence.

b) Should the Contractor require any power or utility shutdowns during construction, the Contractor shall obtain approval for such shutdown from the Location Monitor three working days prior to the need

12. Site Cleanup: The construction site shall be kept clean and free of debris at all times. Restore areas disturbed as nearly as possible to the original appearance and condition. Upon completion of the project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the COR.

13. Submittals:

a) For all proposed material, where applicable, contractor shall provide concrete mix design, relevant illustrations, standard schedules, performance charts, instructions, brochures, diagrams, manufacturer descriptive literature, or catalog data.

b) The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.

c) Submittals are required for all building materials and equipment and shall be provided to the CO and COR for review and approval.

d) Contractor is responsible for any costs incurred for equipment ordered without prior approval.

14. Final Inspection:

a) The Contractor shall notify the Contracting Officer and Owner in writing 10 days prior to the date that the project will be ready for final inspection. An inspection of the project will be made by the Contracting Officer and Contractor at a mutually agreed upon time. COR and contractor shall compile a “punch list” prior to final acceptance of the installation and submit completed warranty documentation to manufacturer.

15. Warranty:

a) In addition to any other warranties set out elsewhere in this contract, the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect of equipment, material or design furnished, or workmanship performed by the Contractor or any of his subcontractors or suppliers at any tier. Such warranty shall continue for a period of one year from the date of final acceptance of the project. Under this warranty, the Contractor shall remedy at his own expense any such failure to conform or any such defect. In addition, the Contractor shall remedy at his own expense any damage to Government owned or controlled real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements or any such defect of equipment, material, workmanship, or design. The Contractor shall also restore any work damaged in fulfilling the terms of this clause. The Contractor's warranty with respect to work repaired or replaced hereunder will run for one year from the date of such repair or replacement.

16. Notification and Compliance: The Government shall notify the Contractor in writing within a reasonable time after the discovery of any failure, defect, or damage. Should the Contractor fail to remedy any failure, defect, or damage within a reasonable time after receipt of notice thereof, the Government shall have the right to replace or repair and have the cost billed to the Contractor.

17. Latent Defects:

a) The Warranty specified herein shall not limit the Government’s rights with respect to latent defects, gross mistake, or fraud.

18. Acceptance:

a) Upon satisfactory submittal of the above documents the Contracting Officer shall issue to the Owner a certificate recommending final acceptance of the project. Minor unfinished items of work may be listed on the certificate and accepted from final acceptance. A sum sufficient to cover the cost of completing these unfinished items of work will be withheld by the Owner from the final payment. All other funds including retainage shall be due and payable upon receipt by the Owner of the Contracting Officer's certificate. Upon certification by the Contracting Officer that the items of work have been completed, all monies withheld by the Owner shall be due the Contractor.

END