Attachment_1_Statement_of_Work_April_2021_(2).pdf

PDF 236 KB Posted

Attached to
PXAO PARKING LOT Federal contract opportunity
Solicitation number
140R3021Q0064
Issued by
Department of the Interior Bureau of Reclamation

View the file

Other files for this federal contract opportunity

Other files attached to PXAO PARKING LOT, newest first.
File Type Posted
Sol_140R3021Q0064_Amd_0001.pdf PDF
140R3021Q0064_0001.pdf PDF
Attachment_2_Drawings.pdf PDF
Attachment_6_-_Site_Photos.pdf PDF
Attachment_5_WBR_1432_903-1a_Construction_Payment.docx DOCX document
Attachment_3_Wage_Determination.pdf PDF
140R3021Q0064.pdf PDF
Attachment_4_DI-137_Release_of_Claims_Mar_2017_(1).pdf PDF
Sol_140R3021Q0064.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation – 140R3021Q0064

1 | P a g e

ATTACHMENT 1 – STATEMENT OF WORK

PHOENIX AREA OFFICE

Parking lot Stabilized Decomposed Granite

I. BACKGROUND

The Bureau of Reclamation Phoenix Area Office currently has 18,675 square feet of ¼” minus decomposed granite (DG) surfacing. Most of the surfacing is under shade canopies with a +/- 8’1” clearance. The existing material was installed between 2004-2005 and has had minimal maintenance during its lifetime. Erosion has been concentrated to where the shade canopies end and rains have dripped onto the surface, eroding the decomposed granite as deep as 3 inches in places.

II. SCOPE OF WORK

The contractor shall provide all resources necessary to accomplish the task and deliverables described in this Statement of Work. The principle components of work to be performed includes, but is not limited to the following:

1. Removal and offsite disposal of existing decomposed granite pavement section (LS)

2. Installation of 4” thick layer of stabilized DG (Approx. 17,965 sq.ft.)

3. Installation of 80mm stone paving. (Approx. 710 sq.ft.)

4. Removal & reinstallation of existing raised parking space markers (LS)

5. Removal and reapplication of 5 handicap markings with government furnished stencil and paint. Concrete pads shall be salvaged. (LS)

The following acronyms apply to this SOW and construction drawings:

1. CO: Contracting Officer

2. CS: Contract Specialist

3. COR: Contracting Officer’s Representative

4. NTP: Notice to Proceed

5. DG: Decomposed Granite

6. CLIN: Contract Price Schedule Line Item

III. SPECIFIC REQUIREMENTS/TASKS

A. Civil Site Improvements I Stabilized Decomposed Granite

1. The Contractor shall perform all work required to remove existing DG.

a. Remove the existing 4” layer of DG in the parking lot as shown in the drawings 344-331-60080-RD-3 and dispose of the material.

After removing the existing DG from site, inform Reclamation if

2 | P a g e material was used on another project, recycled, or taken to landfill by completing the Form E provided by Reclamation.

2. The Contractor shall furnish and install 4” thick layer of ¼” compacted Stabilized DG flush with all concrete driveways, disability platforms and walkways.

a. Thoroughly blend stabilizer binder product and water into DG to create homogenous mix and moisture per manufacturer’s instructions.

i. Decomposed Granite Binder shall be Stabilizer® as manufactured by Stabilizer Solutions, Inc. 33 South 28th St., Phoenix, AZ 85034; phone (602) 225-5900, (800) 336- 2468; fax (602) 225-5902; website stabilizersolutions.com;

email info@stabilizersolutions.com or approved equivalent with the following salient characteristics:

(1) Non-toxic, organic binder that is a colorless and odorless concentrated powder that binds decomposed granite or crushed 3/8” or ¼” minus aggregate.

(2) Product to have 64% pre-consumer recycled content or approved equal.

b. DG shall be free of clay lumps, organic materials, or other deleterious substances.

c. DG shall consist of angular and durable stone particles presenting a uniform appearance.

d. DG color shall be Stabilizer Solutions Inc. Gray or approved equivalent.

i. Submit sample of DG color a minimum of 7 days prior to installation.

e. Gradation of DG shall match product data submission as defined on Table A within this SOW.

f.

Table A

Gradation of DG should be as follows or equal (ASTM C136)

Sieve Percent Passing

3/8” 100%

#4 65-85%

#8 48-63%

#16 40-49%

#30 30-40%

#50 20-27%

#100 10-18%

#200 10-12%

3 | P a g e

g. Contractor shall install DG in (2) 2” lifts.

i. Compaction can be achieved by a 5-ton double-drum roller making 4 passes.

(1) Do not begin compaction for 72 hours after placement or as directed by manufacturer specifications.

(2) Avoid turning on material with roller.

ii. Plate compactor shall be used on edges and hard to access areas.

(1) If near wall, column or other feature hand tamp may be necessary.

iii. The finished DG grade shall be uniform and free from loose materials with a smooth and uniform texture.

iv. Do not install in rainy conditions.

II 80mm Stone Paving with Bedding & Joint Sand

1. Contractor shall install stone paving as shown on drawings on a sand bed adjacent to the concrete driveway.

a. Pavers must meet or exceed industry standard specification

ASTM-C936. All units shall be sound and free of defects that would interfere with the proper placing of unit or impair the strength or permanence of the construction.

b. Pavers shall be dark brown Holland Stone 80mm or approved equal.

i. Pigment in Pavers shall conform to ASTM C979.

c. Paver dimensions shall be 3 7/8 in. W x 7 13/16 in. L x 3 1/8 in. H.

i. Verify base is dry to support sand, edge restraints, and pavers.

(1) Where not otherwise retained, provide edge restraints installed around the perimeter of all paving areas.

(2) Paving shall be placed in a running bond pattern, see drawing 344-331-60080-RD-3 Detail B, or approved equal.

(3) Joints between pavers shall be between 1/16 in. and 3/16 in. with no more than 5% of joints exceeding 1/4 in. wide to achieve straight bond lines. Fill joints with sand.

(a) Joint bond lines shall not deviate more than

+/- 1/2 in. over 50ft.

(4) No greater than 1/8 in. difference in height between adjacent pavers.

(5) Final paver surface elevation shall not exceed 1/8

in. above adjacent DG and concrete driveway.

4 | P a g e

(6) Where required, cut pave stones with an approved cutting device to fit accurately, neatly, and without damaged edges.

(a) All cut pavers shall be no smaller than one-third of a whole paver.

2. Contractor shall install a uniform 1” bed of sand and fill paver joints with sand completely.

a. Bedding sand shall conform to grading requirements of ASTM

C33.

Table B.1

Gradation of Bedding Sand shall be as follows (ASTM C33)

Sieve Percent Passing

3/8” 100%

#4 95-100%

#8 80-100%

#16 50-85%

#30 25-60%

#50 5-30%

#100 0-10%

#200 0-3.0%

b. Joint sand shall conform to grading requirements of ASTM C144

Table B.2 Gradation of Natural Joint Sand shall be as follows (ASTM C144)

Sieve Percent Passing

#4 100%

#8 95-100%

#16 70-100%

#30 40-75%

#50 10-35%

#100 2-15%

#200 0-5.0%

c. Sand shall be clean, non-plastic, free from deleterious or foreign matter, natural or manufactured from crushed rock.

i. Limestone screenings or stone dust shall not be used.

5 | P a g e

d. Sand shall be covered with waterproof covering to prevent exposure to rainfall or removal by wind. The covering shall be secured in place.

e. The sand shall not be compacted, walked on, or watered down.

f. Contractor is responsible for any earthwork materials or aggregate base quantities needed for the sub-grade preparation.

i. Do not use the bedding sand to fill depressions in the sub-grade.

(1) Existing DG can be used for subgrade replacement if subgrade is over-excavated.

g. The subgrade shall be uniform and free from debris with a smooth and uniform texture and moistened prior to placement of Stone Paving & Bedding Sand.

h. Tamp paving with a plate compactor or equivalent, uniformly level, true to grade and free of movement. Minimum centrifugal compaction force of 5000 lbs must be reached by compaction equipment.

i. A minimum of 3 passes with a plate compactor or equivalent is required.

ii. All work to within 3 ft. of the laying face must be left fully compacted with sand-filled joints at the completion of each day.

i. Remove excess sand from surface when installation is complete and swept clean after removal.

III Raised Parking Lot Markers

1. Existing markers shall be removed and re-used for installation

a. The contractor shall furnish new markers, steel plates, or rebar equivalent to existing materials if existing markers, steel plates, or rebar are damaged during removal resulting in insufficient markers detailed in drawing #344-331-60081-RD-2 or at the direction of the COR.

i. Reference drawing #344-331-60080-RD-3 Detail 3

ii. If new Raised Parking Marker is furnished, submit product data submittal

b. Raised Parking Marker detail in drawing #344-331-60080-RD-3

Detail 3

i. Reference ADOT Standard Drawing No. M-19 pages 1 & 2

c. Marker Adhesive shall be Structurbond resin with 550 hardener as manufactured by United Resin Corporation, 4359 Normandy Court, Royal Oak, MI 48073 or equal with the following characteristics:

i. Minimum 7-day shear strength: 3,000 PSI

ii. Minimum Compression strength: 21,000 PSI

iii. Color: white or clear

2. Contractor shall remove 250 existing markers and install proposed 153 markers.

6 | P a g e

a. Contractor shall be responsible to verify quantities.

B. CONTRACTOR RESPONSIBILITIES

1. The Contractor shall exercise management and operational control and retain full responsibility for performance and quality of the work set forth in the Statement of Work.

2. The Contractor is responsible for conducting a site survey to determine existing conditions.

3. Hold weekly on-site toolbox/coordination meetings with Reclamation.

4. The Contractor use areas are designated per drawing 344-331-60079-RD-

1. The use areas shall be used for equipment loading/staging areas, the storage of equipment and materials, parking, and other work-related activities.

a. Upon completion of work the Contractor shall remove from the worksite and Contractor’s use area, all Contractor furnished facilities, rubbish, unused materials, and other like items belonging to or used by the Contractor or its subcontractors.

b. All work areas shall be restored to the original conditions subject to the approval of Reclamation.

5. Report damage to existing utility lines or any existing infrastructure to Reclamation field personnel immediately upon detection of damage this includes but is not limited to sidewalks, curbs, disability access ramps, signs, etc. Damage to existing facilities caused by the Contractor activities will be repaired at the Contractor’s expense to the satisfaction of the Government.

6. Existing roads are available for access to the site. The contractor shall comply with all conditions imposed upon the use of the existing roads by those entities having jurisdiction.

7. Ingress and egress to PXAO must always be maintained for Reclamation government vehicles during construction as shown in drawing 344-331- 60079-RD-1. Any required disruption of access must be scheduled and approved in advance of the disruption.

a. Schedule must show how the work will impact specific parking areas to allow Government to inform employees of parking restrictions. Revisions to the parking restriction schedule must be made 2 days prior to performing that specific work.

b. Install protective barricades or other equivalent forms of protection for excavation areas, DG watering period, and DG compaction period.

8. The Contractor shall provide all the labor, equipment, and materials required to prevent dust nuisance or damage to persons, property, or activities including but not limited to recreational activities, traffic, and similar conditions. Methods of handling and storing decomposed granite shall include means of eliminating atmospheric discharge of dust.

7 | P a g e

IV. WARRANTY

1. Submit a written warranty executed by the contractor agreeing to repair or replace components of Stabilized DG and pavers that fail in material or workmanship within the specified warranty period of 2 years. Failures include, but are not limited to, the following:

a. Premature wear and tear provided the material is maintained in accordance with manufacturer’s written maintenance instructions.

b. Failure of system to meet performance requirements.

V. SAFETY REQUIREMENTS

The Contractor shall fully comply with the U.S. Department of Labor in Title 29 CFR, Parts 1910 and 1926, Occupational Safety and Health Acts of 1970 guidelines and Reclamation Safety and Health Standards (RSHS) amendments and revisions. The more stringent provision shall prevail. Reclamation Safety and Health Standards including revisions posted at http://www.usbr.gov/ssle/safety/RSHS/rshs.html This applies to all aspects of the Contractors operations including mobilization, construction activities, and project clean-up.

1. The Contractor shall cleanup and dispose of all waste materials and rubbish. The waste materials and rubbish shall be disposed of in accordance with applicable Federal, State, and local laws and regulations and in accordance with applicable requirements of the “Reclamation Safety and Health Standards”. Should there be a conflict in the requirements for cleanup and disposal of waste materials, the most stringent requirement shall apply. After removing the existing DG from site, inform Reclamation if material was used on another project, recycled, or taken to landfill by completing the Form E provided by Reclamation. The Government will inspect the site for adherence to required cleanup regulations.

2. Materials or wastes defined as hazardous by 40 CFR 261.3 and Federal Standard 313, as amended; or by other Federal, State, and local laws and regulations and used by the Contractor shall be disposed of in accordance with the applicable Federal, State, and local laws and regulations. Waste materials known or found to be hazardous shall be disposed of in an approved treatment or disposal facility. Hazardous wastes shall be recycled whenever possible. A copy of all hazardous/non-hazardous waste manifests shall be submitted to the Contracting Officer for record purposes.

3. The Contractor is responsible for adhering to all applicable rules, regulations, and laws relating to safety and health, including environmental quality control (i.e., dust control, hazardous materials, etc.). This applies to all aspects of the Contractors operation including mobilization, construction activities, and project clean-up.

4. The Contractor shall not require any employee to work in surroundings or working conditions that are unsanitary, hazardous, or dangerous to health and safety. The Contractor shall furnish or require personal safety apparel and equipment needed for the specified work and as required by the Department of Labor and Health Regulations (OSHA) as published in 29 CFR and in compliance with the Bureau of Reclamation’s “Reclamation Safety and Health Standards”.

http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.usbr.gov/ssle/safety/RSHS/rshs.html http://www.usbr.gov/ssle/safety/RSHS/rshs.html

8 | P a g e

5. Such responsibilities shall apply to the Contractor’s operations as well as any subcontractor operations. The Contractor shall immediately correct any safety or health violations.

6. The Contractor shall comply with all Federal, State, and local laws when hauling construction materials to and from the jobsite. The hauling of construction materials over public highways, roads, or bridges shall be in compliance with applicable local regulations and shall be such as to minimize interference with or congestion of local traffic. Where haul routes cross public highways or roads, the Contractor shall provide barricades, flagmen, and other necessary precautions for the safety of the public.

7. During the performance of work, the Contractor shall comply with applicable Federal, State, and local laws and regulations, with applicable requirements from the “Reclamation Safety and Health Standards” and as outline in this item regarding the prevention, control, and abatement of dust pollution. Should a conflict exist in the requirements for dust abatement, the most stringent requirement shall apply. The Contractor shall be responsible for all damages resulting from dust originating from construction operations under this Statement of Work.

8. Contractor Safety Representative shall be onsite during all construction activities and work hours.

9. The Contractor shall submit a Job Hazard Analysis (JHA) for each distinct phase of work in accordance with the RSHS, Appendix 4B: Job Hazard Analysis.

10. The Contractor shall submit a list of JHAs to be submitted throughout the project.

11. See the Safety and Health required submittals in section XII within this SOW.

VI. LOCATION OF WORK

The Phoenix Area Office is located at 6150 W Thunderbird Road, Glendale AZ 85306, which is on the NW corner of the SRP Arizona Canal and Thunderbird Rd. intersection. Refer to drawing 334-331-60079-RD-1 for location map and drawing 334-331-60081-RD-2 for project footprint.

9 | P a g e

VII. USE OF SITE

A. For each Contractor use site on Government Land.

1. Submit a diagram showing use of location and extent of impact. Uses include but are not limited to the following:

a. Areas for processing, storing, and disposing of waste materials from construction operations.

b. Temporary fences.

c. Sanitary facilities

i. Restroom facilities will not be available to Contractor personnel. Contractor shall provide sanitary facilities.

2. Utilities

a. Electricity – Power is available from the office building for contractor use.

b. Water – Potable water is available at outside hose bibs for contractor use.

VIII. SITE ACCESS

Access to the site and work areas is shown per drawing and consists of all-weather paved roads.

During non-business hours, vehicle access onto the facility is restricted with a traffic gate and will be coordinated with Reclamation. Access within the building is restricted and will require an escort while on the premises.

IX. WORK HOURS

Schedule all work between the hours of 6:00 AM to 6:30 PM, Monday through Friday. Any request for weekend work or work outside of the specified work hours must be submitted to Reclamation for approval 2 days prior to the activity.

X. PERIOD OF PERFORMANCE

The Period of Performance is 45 calendar days after issuance of the Notice to Proceed (NTP) from the Contracting Officer (CO).

XI. INSPECTION

Reclamation will provide inspection to ensure the work complies with the SOW.

XII. SUBMITTALS

Required submittals shall be emailed, mailed or hand delivered to the following:

Department of the Interior

10 | P a g e

Bureau of Reclamation To be determined at time of award

Reclamation will require five (5) working days for review of submittals, unless otherwise specified in Submittal Table. Results of the review will be emailed to the Contractor. Submittals not approved shall be resubmitted to Reclamation within five (5) working days of notice of disapproval. Work activities requiring submittals shall not proceed without approval of the applicable submittals. Table C lists the required submittals. Submittals may be in the form of hard copy, including standard manufacturer products, or electronic files. If electronic, they should be compatible with (readable/usable by) Microsoft Office 2010 or later, Adobe Acrobat X or later, and/or AutoCAD 2010 or later formats; and conveyed either by electronic mail transmission or in the form of CD/DVDs readable on Windows Operating Systems, version 7 or later.

Submittal Types:

A – Action: Government will respond as to adequacy of submittal.

I – Informational: The Government will acknowledge receipt of Informational submittals. The Government may reject an Informational submittal when the submittal does not comply with the contract. The Contractor shall correct mistakes or deficiencies in rejected Informational submittals and resubmit.

Table C - List of Submittals

Clause or Section

Title Submittals required Due date or delivery time Type

No. of sets to be sent to :*

CO/CS

No. of sets to be sent to: * COR

Safety and Health (WBR 1452.223-81)

Safety Program Submitted and accepted before commencing onsite work. See section 3 of RSHS

A 1 1

Safety and Health (WBR 1452.223-81)

Monthly Accident Summary Report

Final day of work. See paragraph

3.8 of RSHS.

I 1 1

Safety and Health (WBR 1452.223-81)

Representative Information

At least 7 days prior to starting on-site work.

I 1 1

Safety and Health (WBR 1452.223-81)

Job Hazard Analysis List Submitted and accepted before commencing onsite work. See section 3 of RSHS

A 1 1

Use of Site Land Use and Landscape Rehabilitation Plan

At least 10 days before use of Government land

A 1 1

Schedule Baseline Schedule At least 7 days prior to starting on-site work.

A 1 1

Schedule Updated Schedule Weekly starting the first day of on-site work.

I 1 1

FAR 52.228-13 Payment Bonds 100% of the contract price

10 days after Award. Before NTP. A 1

11 | P a g e

Clause or Section

Title Submittals required Due date or delivery time Type

No. of sets to be sent to :*

CO/CS

No. of sets to be sent to: * COR

FAR52.228-5 Insurance Work on Government Installations

Before commencing work A 1 1

Safety Data Sheets

Complete LHM and

SDS

At least 7 days before jobsite delivery of hazardous material.

I 1 1

Safety Data Sheets

Updated LHM and SDS At least 7 days before jobsite delivery of hazardous material not previously listed.

I 1 1

Safety Job Hazard Analysis At least 7 days before performing phase of work

I 1 1

Safety List of Job Hazard Analysis to be completed

At least 7 days before starting work. Update JHAs as required.

I 1 1

Decomposed Granite

Product Data including gradation and installation instructions, color and 1-gallon Ziploc bag sample.

At least 7 days prior to starting on-site work.

A 1 1

Decomposed Granite & Pavers

Contractor Warranty and Maintenance Instructions

Within 7 days of completion of work

A 0 1

Bedding Sand Product Data including sieve analysis per ASTM C136

At least 7 days prior to starting on-site work.

A 1 1

Join Sand Product Data including sieve analysis per ASTM C136

At least 7 days prior to starting on-site work.

A 1 1

Pavers Product Data including paver type, dimensions, and color

At least 7 days prior to starting on-site work.

A 1 1

Pavers One full size paving unit to indicate color and shape selections

At least 7 days prior to starting on-site work.

A 1 1

Parking Lot Marker

Epoxy Product Data At least 7 days prior to starting on-site work.

A 1 1

Parking Lot Marker

Raised Pavement Marker Product Data

At least 7 days prior to starting on-site work.

A 1 1

Construction Methods, General

Waste production disposal records (Form E)

At least 7 days prior to waste disposal

I 1 1

(WBR)1452.20

4-70

Release of Claims (DI- 137)

After completion of work and prior to final payment

A 1 0

XIII. PAYMENT

12 | P a g e

Lump sum price offered in the schedule of furnishing and installing Decomposed Granite mixed with stabilizer, furnishing and installing parking space markers & stone paving, demolition and removal of existing DG.

1. Incidental Work

a. The cost for all work indicated on the contract Drawings, or listed within these specifications, required to complete the project as specified, that is not explicitly included within a CLIN for payment in the price schedule shall be considered incidental to the cost of the contract. The cost for such incidental work shall be included in the prices for other items of work listed in the price schedule.

2. Contract Price Schedule Line Items (CLIN’s)

a. Bonds & Insurance

i. Bonds and insurance shall include the cost for all bonds, insurance, and associated submittals required by the Contract prior to the issuance of the notice to proceed.

ii. Payment for bonds and insurance shall be included in the prices for the other items of work listed in the price schedule.

b. Mobilization

i. Mobilization shall include all activities and associated costs for transportation of contractor’s personnel, equipment, and operating supplies to the site.

ii. Payment will be made in a lump sum.

c. Removal and offsite disposal of existing DG pavement section.

i. Payment will be made in a lump sum.

d. Installation of 4” thick layer of Stabilized DG.

i. Payment will be made in square feet.

e. Installation of 80mm stone paving with.

i. Payment will be made in square feet.

1. Square footage price offered in schedule for furnishing and installing stone paving, bedding sand, and joint sand.

f. Removal and reinstallation of existing raised parking space markers.

i. Payment will be made in a lump sum.

g. Removal and reapplication of five handicap markings.

i. Payment will be made in a lump sum.

XIV. LIST OF DRAWINGS

Table D - List of Drawings

Sheet No.

Drawing No. Title

1 344-331-60079-RD-1 Location Map/Contractor Use Area

2 334-331-60081-RD-2 Civil Site Improvements

3 334-331-60080-RD-3 Sections/Details

I. BACKGROUND
II. SCOPE OF WORK
III. SPECIFIC REQUIREMENTS/TASKS
A. Civil Site Improvements
B. CONTRACTOR RESPONSIBILITIES
IV. WARRANTY
V. SAFETY REQUIREMENTS
VI. LOCATION OF WORK
VII. USE OF SITE
A. For each Contractor use site on Government Land.
1. Submit a diagram showing use of location and extent of impact. Uses include but are not limited to the following:
a. Areas for processing, storing, and disposing of waste materials from construction operations.
b. Temporary fences.
c. Sanitary facilities
i. Restroom facilities will not be available to Contractor personnel. Contractor shall provide sanitary facilities.
2. Utilities
a. Electricity – Power is available from the office building for contractor use.
b. Water – Potable water is available at outside hose bibs for contractor use.
VIII. SITE ACCESS
IX. WORK HOURS
X. PERIOD OF PERFORMANCE
XI. INSPECTION
Reclamation will provide inspection to ensure the work complies with the SOW.
XII. SUBMITTALS
XIII. PAYMENT
XIV. LIST OF DRAWINGS

File details come from the government source that posted it. Updated .