140R3021Q0064_0001.pdf
PDF 674 KB Posted
- Attached to
- PXAO PARKING LOT Federal contract opportunity
- Solicitation number
- 140R3021Q0064
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R3021Q0064_Amd_0001.pdf | ||
| Attachment_2_Drawings.pdf | ||
| Attachment_6_-_Site_Photos.pdf | ||
| Attachment_5_WBR_1432_903-1a_Construction_Payment.docx | DOCX document | |
| Attachment_3_Wage_Determination.pdf | ||
| Attachment_1_Statement_of_Work_April_2021_(2).pdf | ||
| 140R3021Q0064.pdf | ||
| Attachment_4_DI-137_Release_of_Claims_Mar_2017_(1).pdf | ||
| Sol_140R3021Q0064.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. Department of the Interior 2021
Solicitation No. 140R3021Q0064/Purchase Order No. TBD
Phoenix Area Office Parking Lot Resurfacing, 100% Set-Aside for Small Business
This page intentionally left blank.
Foreword RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot Resurfacing
FOREWORD
The Bureau of Reclamation, Interior Region 8: Lower Colorado Basin, has a requirement for the resurfacing, removal and offsite disposal of decomposed granite of the existing parking lot at the Phoenix Area Office in Glendale Arizona. The parking lot consists of approximately 17,965 square feet of ¼” minus decomposed granite surfacing, and the existing material was installed between 2004-2005 which there has been minimal maintenance during the lifetime. The majority of the surfacing is under shaded canopies and there has been erosion concentrated where the canopies end, and the erosion is as deep as 4” in places.
MAGNITUDE OF CONSTRUCTION PROJECTS: In accordance with Federal Acquisition Regulation (FAR) 36.204 Disclosure of the Magnitude of Construction Projects, this construction project is estimated to be between $25,000. and $100,000.
SITE VISIT: Due to the current situation and inability to gather in large numbers, an organized site visit WILL NOT be scheduled. Photos and drawings of the site are included as Attachments (see Section J.2).
Failure to view the attachments by prospective quoters of the site will not relieve prospective quoters from the responsibility of properly estimating the difficulty or cost of successfully performing the work in accordance with the contract requirements.
WRITTEN QUESTIONS: Reclamation will only accept written questions for this RFQ. Please submit all written questions pertaining to this RFQ to Jennifer Garcia, via email, jgarcia@usbr.gov, no later than 5:00 p.m., Eastern Time, August 17, 2021. The subject line shall clearly reference the RFQ Number associated with this RFQ. No questions will be entertained after this date. ONLY WRITTEN
QUESTIONS WILL RECEIVE A RESPONSE.
QUOTE DUE DATE AND TIME. Quotes are due by 5:00 p.m., Eastern Time, August 30, 2021. Quotes shall be submitted electronically via email to the Contract Specialist, jgarcia@usbr.gov. No paper quotes (hand delivered or mail submission) shall be accepted for this solicitation. Quoters are required to submit a copy of the SF 18 and Schedule B from Section B, Page B-1.
BASIS FOR AWARD. For this solicitation, it is the Government’s intent to award a purchase order to the responsible offeror whose quote is the lowest price.
OTHER NOTES TO VENDORS:
For information regarding Bureau of Reclamation’s publication “Reclamation Safety and Health Standards" (2009 Edition as revised, with revisions at http://www.usbr.gov/ssle/safety/RSHS/rshs.html) which is applicable to work under this contract, see clause WBR 1452.223-81 Safety and Health.
mailto:jgarcia@usbr.gov mailto:jgarcia@usbr.gov http://www.usbr.gov/ssle/safety/RSHS/rshs.html
Foreword RFQ No.
Project Title: Phoenix Area Office Parking Lot Resurfacing
This page left intentionally blank
Table of Contents
RFQ No.
Project Title: Phoenix Area Office Parking Lot Resurfacing i
TABLE OF CONTENTS
Foreword
Table of Contents i
Section A - Request for Quotations, SF-18 A-1
Section B – Supplies or Services and Prices B-1
Section C – Description and Specifications C-1
Section D – Packaging and Marking – THERE IS NO ADDITIONAL INFORMATION IN THIS SECTION D-1
Section E – Inspection and Acceptance E-1
Section F -- Deliveries or Performance F-1
Section G -- Contract Administration Data G-1
Section H -- Special Contract Requirements – THERE IS NO ADDITIONAL INFORMATION IN THIS
SECTION
H-1
Section I -- Contract Clauses I-1
Section J – List of Documents, Exhibits and Other Attachments
J-1
Section K – Representations, Certifications and Other Statements of Offerors
K-1
Section L – Instructions, Conditions and Notices to Bidders L-1
Section M – Evaluation Factors for Award M-1
Table of Contents
RFQ No.
Project Title: Phoenix Area Office Parking Lot Resurfacing ii
This page intentionally left blank
Section A – Solicitation, Offer and Award
RFQ No.
A-1
SECTION A – SOLICITATION, OFFER AND AWARD
[Insert SF 18 here]
Section A – Solicitation, Offer and Award
RFQ No.
A-2
Section B – Supplies or Services and Prices
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot Resurfacing
B-1
SECTION B – PRICE SCHEDULE
B.1 THE REQUIREMENT
(a) The Contractor shall furnish the items identified in this Section, in accordance with the terms, conditions, and specifications contained in the contract.
(b) Vendors are cautioned to carefully review the quote submission requirements contained in Section L.11. Failure to comply with these requirements may result in a quote being determined unacceptable.
(c) Quotes will be considered for award on the schedule in Paragraph B.2, but no quote will be considered for award for only a part of the schedules or a part of any single schedule. Quotes for only a part of the schedules or parts of a single schedule may be determined unacceptable.
(d) Vendors shall complete the schedule(s) in Section B and Request for Quotes, SF-18 form.
(e) The Section I clause entitled "Payment for Mobilization and Preparatory Work" applies to Schedule item(s) for Mobilization and Preparatory Work. Also, see the Section L provision entitled “Instruction for Mobilization and Preparatory Work Schedule Line Item.”
(f) IMPORTANT NOTE: The requirement for submission of payment bonds is applicable only for construction projects greater than $35,000.00 but not greater than $150,000.00. Performance bonds are not required below $150,000.00
B.2 PRICE SCHEDULE
CLIN
ID CLIN ESTIMATED
QUANTITY UNIT UNIT PRICE TOTAL
1-1 BONDS 1 LS
1-2 MOBILIZATION 1 LS
1-3 Removal and offsite disposal of existing Decomposed Granite
(DG)
1 LS
1-4 Installation of 4” thick layer of Stabilized DG 17,965 SF
1-5 Installation of 80 mm stone paving 710 SF
1-6 Removal and reinstallation of existing raised parking space markers
1 LS
1-7 Removal and reapplication of five handicap markings 1 LS
TOTAL FOR PRICE SCHEDULE: $ __________________________
Section B – Supplies or Services and Prices
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
B-2
Section C - Descriptions and Specifications
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
C-1
SECTION C -- DESCRIPTIONS AND SPECIFICATIONS
C.1 STATEMENT OF WORK/SPECIFICATIONS/WORK STATEMENT
The Contractor shall furnish the necessary personnel, materials, equipment, services, and facilities (except as otherwise specified) to perform the requirement specified in the Statement of Work and Drawings contained in Attachment No. 1 and No. 2 of this RFQ.
Section C - Descriptions and Specifications
RFQ No.
140R3021Q0064
C-2
Section D - Packaging and Marking
RFQ No.
140R3021Q0064
D-1
SECTION D – PACKAGING AND MARKING
(There is no additional information in this section)
Section D - Packaging and Marking
RFQ No.
140R3021Q0064
D-2
Section E - Inspection and Acceptance
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
E-1
SECTION E – INSPECTION AND ACCEPTANCE
E.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following addresses:
FAR Clauses - https://www.acquisition.gov/browse/index/far
The following referenced clauses are hereby incorporated into and made a part of this contract.
Clause Title Date 52.246-12 Inspection of Construction August 1996 https://www.acquisition.gov/browse/index/far
Section E - Inspection and Acceptance
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
E-2
Section F - Deliveries or Performance
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
F-1
SECTION F – DELIVERIES OR PERFORMANCE
F.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following address:
52.211-18 Variation in Estimated Quantity April 1984 52.242-14 Suspension of Work April 1984
F.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK APRIL 1984
The Contractor shall be required to:
(a) Commence work under this contract within 5 calendar days after the date the Contractor receives the notice to proceed,
(b) Prosecute the work diligently, and
(c) Complete the entire work ready for use not later than 45 calendar days after receipt of Notice to Proceed. The time stated for completion shall include final cleanup of the premises.
(End of Clause)
Section F - Deliveries or Performance
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
F-2
Section G - Contract Administration Data
RFQ No.
140R3021Q0064
G-1
SECTION G – CONTRACT ADMINISTRATION DATA
G.1 AUTHORITIES AND DELEGATIONS SEPTEMBER 2011
(a) The Contracting Officer is the only individual authorized to enter into or terminate this contract, modify any term or condition of this contract, waive any requirement of this contract, or accept nonconforming work.
(b) The Contracting Officer will designate a Contracting Officer's Representative (COR) at time of award.
The COR will be responsible for technical monitoring of the contractor's performance and deliveries. The COR will be appointed in writing, and a copy of the appointment will be furnished to the Contractor.
Changes to this delegation will be made by written changes to the existing appointment or by issuance of a new appointment.
(c) The COR is not authorized to perform, formally or informally, any of the following actions:
(1) Promise, award, agree to award, or execute any contract, contract modification, or notice of intent that changes or may change this contract;
(2) Waive or agree to modification of the delivery schedule;
(3) Make any final decision on any contract matter subject to the Disputes Clause;
(4) Terminate, for any reason, the contractor's right to proceed;
(5) Obligate in any way, the payment of money by the Government.
(d) The Contractor shall comply with the written or oral direction of the Contracting Officer or authorized representatives(s) acting within the scope and authority of the appointment memorandum. The Contractor need not proceed with direction that it considers to have been issued without proper authority.
The Contractor shall notify the Contracting Officer in writing, with as much detail as possible, when the COR has taken an action or has issued direction (written or oral) that the Contractor considers to exceed the COR's appointment, within 3 days of the occurrence. Unless otherwise provided in this contract, the Contractor assumes all costs, risks, liabilities, and consequences of performing any work it is directed to perform that falls within any of the categories defined in paragraph (c) prior to receipt of the contracting Officer's response issued under paragraph (e) of this clause.
(e) The Contracting Officer shall respond in writing within 30 days to any notice made under paragraph
(d) of this clause. A failure of the parties to agree upon the nature of a direction, or upon the contract action to be taken with respect thereto, shall be subject to the provisions of the Disputes clause of this contract.
(f) The Contractor shall provide copies of all correspondence to the Contracting Officer and the COR.
(g) Any action(s) taken by the Contractor, in response to any direction given by any person acting on behalf of the Government or any Government official other than the Contracting Officer or the COR acting within his or her appointment, shall be at the risk of the Contractor.
G.2 1452.242-80 POSTAWARD CONFERENCE - BUREAU OF RECLAMATION JULY 1993
(a) Prior to the Contractor starting work, a post award conference (as described in FAR Subpart 42.5), will be convened by the contracting activity or contract administration office. The Contractor's Project
Section G - Contract Administration Data
RFQ No.
140R3021Q0064
G-2
Manager shall attend the conference. If the contract involves subcontractors, a representative of each major subcontractor is also required to attend.
(b) The conference will be held via teleconference.
(c) The Contracting Officer and the Contractor will agree to the date and time of the conference after award of the requirement. In event of a conflict in schedules, the Contracting Officer shall establish the date for the conference.
(d) The Contractor shall include any associated costs for attendance at the conference in its quote.
G.3 GOVERNMENT ADMINISTRATION PERSONNEL
The Contracting Officer responsible for this requirement is:
Kevin Broadnax, Contracting Officer Bureau of Reclamation Interior Region 8 Lower Colorado Basin P.O. Box 61470 Boulder City, NV 89006 Phone No.: 702-293-8413 Email: kbroadnax@usbr.gov
Section H - Special Contract Requirements
RFQ No.
140R3021Q0064
H-1
SECTION H – SPECIAL CONTRACT REQUIREMENTS
(There is no additional information in this section.)
Section H - Special Contract Requirements
RFQ No.
140R3021Q0064
H-2
Section I - Contract Clauses
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-1
SECTION I – CONTRACT CLAUSES
I.1 52.252-02 CLAUSES INCORPORATED BY REFERENCE
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at the following address:
52.204-13 System for Award Management Maintenance October 2018 52.204-18 Commercial and Government Entity Code Maintenance August 2020 52.204-19 Incorporation by Reference of Representation and Certifications December 2014 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations November 2015 52.215-8 Order of Precedence--Uniform Contract Format October 1997 52.219-28 Post-Award Small Business Program Representation November 2020 52.222-6 Construction Wage Rate Requirements August 2018 52.222-7 Withholding of Funds May 2014 52.222-8 Payrolls and Basic Records July 2021 52.222-9 Apprentices and Trainees July 2005 52.222-10 Compliance with Copeland Act Requirements February 1988 52.222-11 Subcontracts (Labor Standards) May 2014 52.222-12 Contract Termination-Debarment May 2014 52.222-13 Compliance with Davis-Bacon and Related Act Regulations. May 2014 52.222-14 Disputes Concerning Labor Standards February 1988 52.222-15 Certification of Eligibility May 2014 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal
Employment Opportunity for Construction February 1999
52.222-27 Affirmative Action Compliance Requirements for Construction April 2015 52.223-3 Alternate I
Hazardous Material Identification and Material Safety Data (Jan 1997) – Alternate I
July 1995
52.223-18 Encouraging Contractor Policies to Ban text Messaging While Driving
June 2020
52.227-1 Authorization and Consent June 2020 52.227-2 Notice and Assistance Regarding Patent and Copy
Infringement June 2020
52.227-4 Patent Indemnity-Construction Contracts December 2007 52.228-2 Additional Bond Security October 1997 52.228-14 Irrevocable Letter of Credit November 2014 52.232-5 Payments under Fixed-Price Construction Contracts May 2014 52.232-23 Alternate I
Assignment of Claims – Alternate I May 2014
52.232-27 Prompt Payment for Construction Contracts January 2017 52.236-2 Differing Site Conditions April 1984 52.236-3 Site Investigation and Conditions Affecting the Work April 1984 52.236-5 Material and Workmanship April 1984 52.236-6 Superintendence by the Contractor April 1984 52.236-7 Permits and Responsibilities November 1991
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-2
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements
April 1984
52.236-10 Operations and Storage Areas April 1984 52.236-11 Use and Possession Prior to Completion April 1984 52.236-12 Cleaning Up April 1984 52.236-13 Accident Prevention November 1991 52.236-14 Availability and Use of Utility Services April 1984 52.236-15 Schedules for Construction Contracts April 1984 52.236-21 Specifications and Drawings for Construction February 1997 52.242-14 Suspension of Work April 1984 52.243-5 Changes and Changed Conditions April 1984 52.246-21 Warranty of Construction March 1994 52.247-21 Contractor Liability for Personal Injury and/or Property Damage April 1984 52.249-1 Termination for Convenience of the Government (Fixed-Price)
(Short Form) April 1984
52.249-10 Default (Fixed-Price Construction) April 1984
I.2 52.213-4 TERMS AND CONDITIONS—SIMPLIFIED ACQUISITIONS
(OTHER THAN COMMERCIAL ITEMS)
JULY 2021
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses that are incorporated by reference:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or
Statements (Jan 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L. 113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(ii) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (Jul 2018) (Section 1634 of Pub. L. 115-91).
(iii) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (Aug 2019) (Section 889(a)(1)(A) of Pub. L. 115-232).
(iv) 52.222-3, Convict Labor (Jun 2003) (E.O.11755).
(v) 52.222-21, Prohibition of Segregated Facilities (Apr 2015).
(vi) 52.222-26, Equal Opportunity (Sept 2016) (E.O.11246).
(vii) 52.225-13, Restrictions on Certain Foreign Purchases (Jun 2008) (E.O.s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
(viii) 52.233-3, Protest After Award (Aug 1996) (31 U.S.C.3553).
(ix) 52.233-4, Applicable Law for Breach of Contract Claim (Oct 2004) (Pub.L.108-77, 108-78
(19 U.S.C. 3805 note)).
(2) Listed below are additional clauses that apply:
(i) 52.232-1, Payments (Apr 1984).
(ii) 52.232-8, Discounts for Prompt Payment (Feb 2002).
(iii) 52.232-11, Extras (Apr 1984).
(iv) 52.232-25, Prompt Payment (Jan 2017).
(v) 52.232-39, Unenforceability of Unauthorized Obligations (Jun 2013).
(vi) 52.232-40, Providing Accelerated Payments to Small Business Subcontractors (Dec2013)
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-3
(vii) 52.233-1, Disputes (May2014).
(viii) 52.244-6, Subcontracts for Commercial Items (Aug 2019).
(ix) 52.253-1, Computer Generated Forms (Jan 1991).
(b) The Contractor shall comply with the following FAR clauses, incorporated by reference, unless the circumstances do not apply:
(1) The clauses listed below implement provisions of law or Executive order:
(i) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (Oct
2018)(Pub. L. 109-282) (31 U.S.C. 6101 note) (Applies to contracts valued at $30,000 or more).
(ii) 52.222-19, Child Labor-Cooperation with Authorities and Remedies (Jan2018) (E.O.13126)
(Applies to contracts for supplies exceeding the micro-purchase threshold.)
(iii) 52.222-20, Contracts for Materials, Supplies, Articles, and Equipment Exceeding $15,000
(May 2014) (41 U.S.C. chapter 65) (Applies to supply contracts over $15,000 in the United States, Puerto Rico, or the U.S. Virgin Islands).
(iv) 52.222-35, Equal Opportunity for Veterans (Oct2015) (38 U.S.C.4212) (applies to contracts of $150,000 or more).
(v) 52.222-36, Equal Employment for Workers with Disabilities (Jul 2014) (29 U.S.C.793) (Applies to contracts over $15,000, unless the work is to be performed outside the United States by employees recruited outside the United States.) (For purposes of this clause, “United States” includes the 50 States, the District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, and Wake Island.)
(vi) 52.222-37, Employment Reports on Veterans (Feb 2016) (38 U.S.C.4212) (Applies to contracts of $150,000 or more).
(vii) 52.222-41, Service Contract Labor Standards (Aug 2018) (41 U.S.C. chapter 67) (Applies to service contracts over $2,500 that are subject to the Service Contract Labor Standards statute and will be performed in the United States, District of Columbia, Puerto Rico, the Northern Mariana Islands, American Samoa, Guam, the U.S. Virgin Islands, Johnston Island, Wake Island, or the outer Continental Shelf).
(viii)
(A) 52.222-50, Combating Trafficking in Persons (Jan 2019) (22 U.S.C. chapter 78 and E.O 13627)
(Applies to all solicitations and contracts).
(B) Alternate I (Mar 2015) (Applies if the Contracting Officer has filled in the following information with regard to applicable directives or notices: Document title(s), source for obtaining document(s), and contract performance location outside the United States to which the document applies).
(ix) 52.222-55, Minimum Wages Under Executive Order 13658 (Dec 2015) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia)).
(x) 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2017) (E.O. 13706) (Applies when 52.222-6 or 52.222-41 are in the contract and performance in whole or in part is in the United States (the 50 States and the District of Columbia.))
(xi) 52.223-5, Pollution Prevention and Right-to-Know Information (May 2011) (E.O. 13423) (Applies to services performed on Federal facilities).
(xii) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (Jun 2016) (E.O. 13693)(applies to contracts for products as prescribed at FAR 23.804(a)(1)).
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-4
(xiii) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners (Jun2016) (E.O. 13693) (Applies to maintenance, service, repair, or disposal of refrigeration equipment and air conditioners).
(xiv) 52.223-15, Energy Efficiency in Energy-Consuming Products (Dec 2007) (42 U.S.C.
8259b) (Unless exempt pursuant to 23.204, applies to contracts when energy-consuming products listed in the ENERGY STAR® Program or Federal Energy Management Program (FEMP)) will be-
(A) Delivered;
(B) Acquired by the Contractor for use in performing services at a Federally-controlled facility;
(C) Furnished by the Contractor for use by the Government; or
(D) Specified in the design of a building or work, or incorporated during its construction, renovation, or maintenance).
(xv) 52.223-20, Aerosols (Jun 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons as a propellant or as a solvent; or contracts for maintenance or repair of electronic or mechanical devices).
(xvi) 52.223-21, Foams (Jun 2016) (E.O. 13693) (Applies to contracts for products that may contain high global warming potential hydrofluorocarbons or refrigerant blends containing hydrofluorocarbons as a foam blowing agent; or contracts for construction of buildings or facilities.
(xvii) 52.225-1, Buy American-Supplies (May2014) (41 U.S.C. chapter 67) (Applies to contracts for supplies, and to contracts for services involving the furnishing of supplies, for use in the United States or its outlying areas, if the value of the supply contract or supply portion of a service contract exceeds the micro-purchase threshold and the acquisition-
(A) Is set aside for small business concerns; or
(B) Cannot be set aside for small business concerns (see 19.502-2), and does not exceed $25,000).
(xviii) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (May 2014) (42
U.S.C. 1792) (Applies to contracts greater than $25,000 that provide for the provision, the service, or the sale of food in the United States).
(xix) 52.232-33, Payment by Electronic Funds Transfer-System for Award Management (Oct 2013)(Applies when the payment will be made by electronic funds transfer (EFT) and the payment office uses the System for Award Management (SAM) as its source of EFT information).
(xx) 52.232-34, Payment by Electronic Funds Transfer-Other than System for Award Management (Jul 2013) (Applies when the payment will be made by EFT and the payment office does not use the SAM database as its source of EFT information).
(xxi) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (Feb 2006) (46 U.S.C.App.1241) (Applies to supplies transported by ocean vessels (except for the types of subcontracts listed at 47.504(d)).
(2) Listed below are additional clauses that may apply:
(i) 52.204-21, Basic Safeguarding of Covered Contractor Information Systems (Jun 2016)
(Applies to contracts when the contractor or a subcontractor at any tier may have Federal contract information residing in or transiting through its information system.
(ii) 52.209-6, Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment (Oct 2015) (Applies to contracts over $35,000).
(iii) 52.211-17, Delivery of Excess Quantities (Sept 1989) (Applies to fixed-price supplies).
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-5
(iv) 52.247-29, F.o.b. Origin (Feb 2006) (Applies to supplies if delivery is f.o.b. origin).
(v) 52.247-34, F.o.b. Destination (Nov 1991) (Applies to supplies if delivery is f.o.b.
destination).
(c) FAR 52.252-2, Clauses Incorporated by Reference (Feb 1998). This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address: https://www.acquisition.gov/browse/index/far
(d) Inspection/Acceptance. The Contractor shall tender for acceptance only those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. The Government must exercise its post acceptance rights-
(1) Within a reasonable period of time after the defect was discovered or should have been discovered; and
(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.
(e) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence, such as acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.
(f) Termination for the Government's convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges that the Contractor can demonstrate to the satisfaction of the Government, using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right to audit the Contractor’s records. The Contractor shall not be paid for any work performed or costs incurred that reasonably could have been avoided.
(g) Termination for cause. The Government may terminate this contract, or any part hereof, for cause in the event of any default by the Contractor, or if the Contractor fails to comply with any contract terms and conditions, or fails to provide the Government, upon request, with adequate assurances of future performance. In the event of termination for cause, the Government shall not be liable to the Contractor for
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-6 any amount for supplies or services not accepted, and the Contractor shall be liable to the Government for any and all rights and remedies provided by law. If it is determined that the Government improperly terminated this contract for default, such termination shall be deemed a termination for convenience.
(h) Warranty. The Contractor warrants and implies that the items delivered hereunder are merchantable and fit for use for the particular purpose described in this contract.
I.3 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE
(DEVIATION 2020-O0008)
OCT 2020
(a) Definition. “Small business concern,” as used in this clause, means a concern, including its affiliates, that is independently owned and operated, not dominant in the field of operation in which it is bidding on Government contracts, and qualified as a small business under the size standards in this solicitation.
(b) Applicability. This clause applies only to—
(1) Contracts that have been totally set aside for small business concerns; and
(2) Orders set aside for small business concerns under multiple-award contracts as described in
8.405-5 and 16.505(b)(2)(i)(F).
(c) General.
(1) Offers are solicited only from small business concerns. Offers received from concerns that are not small business concerns shall be considered nonresponsive and will be rejected.
(2) Any award resulting from this solicitation will be made to a small business concern.
(d) Agreement.
(1) For a contract or an order at or below the simplified acquisition threshold, a small business concern may provide the end item of any firm. For a contract or an order exceeding the simplified acquisition threshold, unless the Small Business Administration has waived the requirements of paragraphs (d)(1)(i) through (iii) of this clause in accordance with 13 CFR 121.1204, a small business concern that provides an end item it did not manufacture, process, or produce, shall—
(i) Provide an end item that a small business has manufactured, processed, or produced in the United States or its outlying areas;
(ii) Be primarily engaged in the retail or wholesale trade and normally sell the type of item being supplied; and
(iii) Take ownership or possession of the item(s) with its personnel, equipment, or facilities in a manner consistent with industry practice; for example, providing storage, transportation, or delivery.
(2) For contracts or orders for multiple end items, at least 50 percent of the total value of the contract or order shall be manufactured, processed, or produced in the United States or its outlying areas by small business concerns.
(3) Paragraphs (d)(1) through (2) of this clause do not apply to construction or service contracts.
(End of clause)
I.4 52.225-9 BUY AMERICAN ACT-CONTRUCTION MATERIALS FEB 2021
(a) Definitions. As used in this clause—
Commercially available off-the-shelf (COTS) item—
(1) Means any item of supply (including construction material) that is–
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-7
(i) A commercial item (as defined in paragraph (1) of the definition at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means—
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Domestic construction material means—
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if–
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 55 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, https://www.acquisition.gov/far/part-2#FAR_2_101
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-8 billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together.
Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States. Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C.chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows:
________________________________________________[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 http://uscode.house.gov/browse.xhtml;jsessionid=114A3287C7B3359E597506A31FC855B3 https://www.acquisition.gov/far/part-12#FAR_12_505
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-9
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-10 the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction Material Description Unit of
Measure Quantity Price
(dollars)*
Item1:
Foreign construction material
Domestic construction material
Item2:
Foreign construction material
Domestic construction material
[* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-11
[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response;
if oral, attach summary.]
[Include other applicable supporting information.]
(End of clause)
I.5 52.228-13 ALTERNATIVE PAYMENT PROTECTIONS JULY 2000
(a) The Contractor shall submit one of the following payment protections:
A payment bond An irrevocable letter of credit
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within 10 days of receipt of award.
(d) The payment protection shall provide protection for the full contract performance period, plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material who signed the escrow agreement.
I.6 1452.203-70 RESTRICTIONS ON ENDORSEMENTS – DEPARTMENT OF
THE INTERIOR
JULY 1996
The Contractor shall not refer to contracts awarded by the Department of the Interior in commercial advertising, as defined in FAR 31.205-1, in a manner which states or implies that the product or service provided is approved or endorsed by the Government, or is considered by the Government to be superior to other products or services. This restriction is intended to avoid the appearance of preference by the Government toward any product or service. The Contractor may request the Contracting Officer to make a determination as to the propriety of promotional material.
I.7 1452.204-70 RELEASE OF CLAIMS – DEPARTMENT OF THE INTERIOR JULY 1996
After completion of work and prior to final payment, the Contractor shall furnish the Contracting Officer with a release of claims against the United States relating to this contract. The Release of Claims form (DI-137) shall be used for this purpose. The form provides for exception of specified claims from operation of the release.
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-12
I.8 1452.228-70 LIABILITY INSURANCE -- DEPARTMENT OF THE INTERIOR JULY 1996
(a) The Contractor shall procure and maintain during the term of this contract and any extension thereof liability insurance in form satisfactory to the Contracting Officer by an insurance company which is acceptable to the Contracting Officer. The named insured parties under the policy shall be the Contractor and the United States of America. The amounts of the insurance shall be not less than as follows:
WORKERS' COMPENSATION AND EMPLOYER'S LIABILITY
$100,000
GENERAL LIABILITY
$500,000 per occurrence
AUTOMOBILE LIABILITY
$200,000 each person $500,000 each occurrence $ 20,000 property damage
(b) Each policy shall have a certificate evidencing the insurance coverage. The insurance company shall provide an endorsement to notify the Contracting Officer 30 days prior to the effective date of cancellation or termination of the policy or certificate; or modification of the policy or certificate which may adversely affect the interest of the Government in such insurance. The certificate shall identify the contract number, the name and address of the Contracting Officer, as well as the insured, the policy number and a brief description of contract services to be performed. The Contractor shall furnish the Contracting Officer with a copy of an acceptable insurance certificate prior to beginning the work.
I.9 1452.201-80 CONTRACTING OFFICER’S REPRESENTATIVE’S AUTHORITIES
AND LIMITATIONS--BUREAU OF RECLAMATION
MAY 2018
(a) Performance of the work under this contract shall be subject to the technical direction of the Reclamation Contracting Officer's Representative (COR). The term “technical direction” is defined to include, without limitation:
(1) Inspecting and accepting or rejecting work performed under the contract.
(2) Representing the Government in technical phases of the work. The COR is responsible for the technical administration of the contract and will provide instructions and interpretations to the Contractor on all technical matters relating to the contract. The COR will supervise or oversee all Government technical and administrative personnel assigned to assist the COR.
(3) Reviewing and, where required by the contract, approving submittals of technical data, shop drawings, samples, literature, plans, or other data required to be delivered by the Contractor to the Government.
(b) The Contractor will receive a copy of the written COR designation from the Contracting Officer. It will specify the extent of the COR's authority to act on behalf of the Contracting Officer.
RFQ No.
140R3021Q0064
Project Title: Phoenix Area Office Parking Lot
I-13
(c) Technical direction must be within the scope of work stated in the contract. Only the Contracting Officer is authorized to determine if a change is within the scope of the contract; therefore, the COR does not have the authority to, and may not, issue any technical direction that -
(1) Constitutes a direction of additional work outside the Contract requirements;
(2) Constitutes a change as defined in the contract clause entitled “Changes;”
(3) In any manner causes an increase or decrease in the total contract cost, or the time required for contract performance;
(4) Changes any of the expressed terms, conditions or specifications of the contract; or
(5) Interferes with the Contractor's right to perform the terms and conditions of the contract.
(d) All technical direction shall be issued in writing by the COR.
(e) The Contractor must proceed promptly with the performance of technical direction duly issued by the COR in the manner prescribed by this clause and within its authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction by the COR falls within one of the categories defined in (c)(1) through (c)(5) of this clause, the Contractor must not proceed and must notify the Contracting Officer in writing within five (5) working days after receipt of any such instruction or direction and must request the Contracting Officer to modify the contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer must -
(1) Advise the Contractor in writing after receipt of the Contractor's letter that the technical direction is within the scope of the contract effort and does not constitute a change under the Changes clause of the contract; or
(2) Advise the Contractor that the Government will issue a written change order.
(f) A failure of the Contractor and Contracting Officer either to agree that the technical direction is within the scope of the contract or to agree upon the contract action to be taken with respect to the technical direction will be subject to the provisions of the clause entitled “Disputes.”
I.10 1452.223-82 PROTECTING FEDERAL EMPLOYEES AND THE PUBLIC FROM
EXPOSURE TO TOBACCO SMOKE IN THE FEDERAL
WORKPLACE --BUREAU OF RECLAMATION
OCTOBER 1998
(a) In performing work under this contract, the contractor shall comply with the requirements of Executive Order 13058, dated August 9, 1997, which prohibits the smoking of tobacco products in all interior space owned, rented, or leased by the executive branch of the Federal Government, and in any outdoor areas under executive branch control in front of air intake ducts.
(b) This restriction does not apply in designated smoking areas that are enclosed and exhausted directly to the outside and away from air intake ducts, and are maintained under negative pressure (with respect to surrounding spaces) sufficient to contain tobacco smoke within the designated area.
(c) Smoking…
This is the start of the file's text. The full file is on GovTribe.