Attachment 1_Statement of Work_10 Mar 2020.pdf

PDF 41 KB Posted

Attached to
Ultra Long range Aircraft Lease Federal contract opportunity
Solicitation number
15F06720R0000051
Issued by
Department of Justice Federal Bureau of Investigation Redstone Arsenal Field Office

About this file

This document contains a Statement of Work and related federal contract opportunity notice for the lease of an ultra-long range aircraft. The Federal Bureau of Investigation requires a dedicated Gulfstream G550 or G650 aircraft to transport Department of Justice personnel worldwide in support of counterterrorism and other sensitive investigations. The aircraft must be delivered by August 20, 2020 with communications and other specified modifications. The lessor will be responsible for maintenance and ensuring the aircraft meets international flight certification requirements. The one-year base period of performance will commence upon acceptance of the aircraft. This is a small business set-aside solicitation seeking proposals due by April 15, 2020, with award intended by May 29, 2020.

View the file

Other files for this federal contract opportunity

Other files attached to Ultra Long range Aircraft Lease, newest first.
File Type Posted
Attachment 1_Statement of Work edit 28 April 2020.pdf PDF
Attachment_5 Questions and Answers Sheet.pdf PDF
Attachment_5 Questions and Answers Sheet.xlsx XLSX spreadsheet
Attachment 2_Performance Questionnaire.pdf PDF
Combined_Synopsis_Sol_.pdf PDF
Attachment 3__Instr_to_Offeror_.pdf PDF
Attachment 4_SF 1449_15F067-20-R-0000051 Long Range Aircraft Lease.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

Lease of Long Range Aircraft 10 March 2020

1.0 Background:

The FBI requires an ultra-long range aircraft to provide a rapid response to transport DOJ personnel world-wide in support of Counterterrorism and other sensitive FBI investigations. In addition, the aircraft will provide transportation support for the FBI’s Director and Department of Justice’s Attorney General. The proposed aircraft shall be delivered with all required modifications to assume the FBI mission by August 20, 2020.

Currently, all FBI aircrew maintain a G5/G550 type rating and flight training currency through Flight Safety International.

Registration of this aircraft shall be the responsibility of the offerors.

2.0 Scope of Work

2.1 Aircraft Availability

The dedicated primary aircraft and its support, as outlined below, shall be complete and ready for acceptance on August 20, 2020. Required aircraft modifications to the primary aircraft must be completed prior to the aircraft acceptance date.

The aircraft shall have the standard package as equipped by the manufacturer for a G-550 or G-650 TYPE aircraft.

2.2 Dedicated Aircraft Description

The aircraft delivered under the contract must be designated and available to conduct flights from the FBI’s designated airfield with the following characteristics and ability to provide the following:

The Gulfstream aircraft delivered under the contract shall be designated and available, and meet or exceed the following specifications and technical requirements, to conduct flights from the FBI’s designated airfield. The leased Gulfstream aircraft shall:

a) be either new or pre-owned (manufactured no earlier than 2012), and equipped with new or pre-owned engines manufactured no earlier than 2012;

b) with or without interior modifications, transport no less than 14, and up to 19, passengers and associated baggage (a minimum of 2 per passenger/large duffle-type bags);

c) include a minimum of 195 cubic feet of cargo in approved cargo space;

d) travel 6,700 nautical range at Mach 0.80 or greater with National Business Aircraft Association (NBAA) reserves;

e) have a maximum height of 27’1”;

f) have a maximum of length 112’;

g) have a maximum wingspan of 105’;

h) have the galley located in the rear of the main passenger seating area;

i) have a crew rest area, forward of the galley, equipped with a 60hz power outlet, minimum of 6 ports, on two separate circuits and data port;

j) have two lavatories, one forward and one aft of the main passenger seating area;

k) include Triple Flight Management Systems;

l) include Securaplane camera system with three cameras or equivalent, viewable in cockpit (Securea Plane 500);

m) include Synthetic Vision SV-PFD (ASC 061A)

n) include Enhanced Vision System (EVS) and heads up display ;

o) include Foxtrot Enhanced Navigation (ASC 084A/084B) to included

WAAS/LPV, FANS 1/A-CPDLC Paperless Cockpit;

p) TCAS with change 7.1 (ASC103);

q) Dual Honeywell Mode S Transponders with enhanced Flight ID and ADS-B

Out (ASC 105);

r) APU Thermal Barrier installation (ASC 090/090A)

s) Plane View Avionics Enhancement (ASC 107 and 113A);

t) Plane View Master Operating System Software Update;

u) CNX (Standard IS 54,500 lbs);

v) include wireless Internet throughout the cabin with speeds meeting or exceeding 512k;

w) include Satellite telephone;

x) include Satellite television;

y) include Aircell/GOGO System Antenna or equivalent;

z) include KU or Ka Band, Iridium, and/or Yonder Sat System Antenna or equivalent;

aa) include TACSAT UHF Antenna or capability to install;

bb) never have been previously titled outside of the United States of America, with Offeror’s notarized certification validating requirement;

cc) be the same airframe, make, and variant from the same original manufacturer;

dd) provide maintenance and safety records for offered primary aircraft;

ee) identify backup and supplemental aircraft with response;

ff) include aircraft security system (manufacturer installed or approved alarm system) for entry doors and wheel wells (the Securaplane system installed by Gulfstream is an acceptable system to meet this requirement).

gg) include ancillary maintenance equipment along with the leased aircraft to include 4 built up main wheels, 2 built up nose wheels, all associated aircraft plugs and covers, all FAA mandated safety equipment to include the life rafts, 3 gear pins along with the fly away kit, a Tron Air Tow Bar Head, an installed tow bar, Jack pads, one axle jack pad, any required specialty tools, and all standard OEM test equipment

hh) Lessor shall have a Tip to Tail Parts Program whereby any required aircraft parts are available on short notice.

ii) The aircraft shall contain a bi-polar ionization Modification to better ensure aviation clean air.

2.3 Dedicated Aircraft maintenance

The maintenance of the aircraft shall be responsibility of the Lessor. The FBI shall maintain and keep the aircraft in good order and repair and completely airworthy, replacing any and all consumable parts which may be worn out or require replacement, specifically tires and brakes. In coordination with the FBI, the Lessor shall insure and schedule all required scheduled calendar, hourly and unscheduled maintenance at Gulfstream Aerospace, and the other manufacturers of the aircraft components as may be required, and in accordance with the requirements of the Federal Aviation Administration or any other governmental authority. If such maintenance, damage, repairs, part replacements, or overhauls, are the result of the FBI’s own acts, omissions or negligence, the FBI shall pay all costs. Should this contention be made, the offeror shall notify the FBI as soon as such determination is made, and shall keep any parts replaced as a result until verified and accepted by the FBI.

2.4 Aircraft Modifications

It is preferred, but not required, that the G-550 or G650 have the military’s C-37B Communications System installed at the time the aircraft is delivered to the FBI to begin the lease term. Modifications to the primary aircraft identified are essential to FBI operations. If after delivery, the FBI decides to modify the aircraft in any way, these modifications will be made at government expense and shall be performed by Gulfstream or a Gulfstream approved maintenance facility, and shall include, but not be limited to:

a) The addition of a C-37B Communications System.

2.5 Operational Control of the Aircraft

The FBI will be the sole operator of the leased aircraft and have the sole authority to determine whether a particular flight may be safely operated, to assign crew members for particular flights, and to dispatch and release flights to any location worldwide.

a) The FBI’s designated Pilot-in-Command of the Aircraft will have sole authority of the aircraft and will be in control of the Aircraft in regards to flight safety.

b) Outside of safety of flight concerns, the FBI will have operational control of activities on board the aircraft, and responsibility for the determination of the termination of a flight and full authority and control to conduct the flight as necessary, but at all times in accordance to FAA and ICAO regulations.

2.6 Lessor’s Responsibilities and Obligations

Under the terms of this contract, the aircraft Lessor shall be responsible for provision and cost necessary to deliver the aircraft to the FBI with all appropriate operating certifications and letters, to include:

a) Worldwide RVSM compliant

b) Airworthiness certification for all required modifications.

c) MNPS

d) RNP-5 and RNP-10

e) Airshow 4000 or newer

f) Broadband Satellite capability

g) All certifications and letters required to operate internationally to include all ICAO compliances, carbon utilization etc.

h) A copy of any private insurance policy the Lessor maintains for the aircraft

2.7 Federal Bureau of Investigations Responsibilities and Obligations

a) The FBI will be the sole operator of the leased aircraft.

b) All FBI personnel assigned to fly the leased aircraft will be fully type rated current, hold a first or second class FAA medical license.

c) FBI personnel assigned to fly the leased aircraft will attend Flight

Safety International (FSI) training annually for re-current training or initial type training.

d) Only routine Maintenance (tires, oil and minor repair) will be performed by the FBI, all other maintenance is the responsibility of the Lessor; and,

e) Leased aircraft will be permanently stationed at an approved, secured and monitored facility. If the permanent base of the aircraft changes, the FBI will immediately notify the owner or company in writing of such new permanent base. The aircraft will not be permanently based outside the continental United States.

2.8 Government Furnished Equipment

The FBI is responsible for providing the following equipment for contractor installation:

a) An Iridium Antenna compatible with an Iridium Portable Telephone if such antenna is not already installed.

2.9 Indemnification/Insurance

The Federal Bureau of Investigation shall indemnify and hold harmless, together with their shareholders, members, directors, officers, employees, agents and subcontractors (Indemnified Parties) from and against all liabilities, claims, damages, losses and expenses, including, but not limited to, claims in tort, whether arising from negligence of the indemnified Parties in connection with or arising out of the bodily injury or death to any passenger on the Aircraft. The above enumerated indemnification is limited to $5M. In the event that damages to aircraft exceed the enumerated limit, the FBI will request additional appropriated funds from Congress to make the Contractor whole.

The government is self-insured. The government will be liable when operating the aircraft.

The contractor shall be liable when they or a sub-contractor is operating the aircraft. Each provision includes hangaring and parking.

3.0 Technical Data

Pilot Operating Handbooks. A total of 10 Pilot Operating Handbooks and any required periodic updates shall be provided. Pilot Operating Handbooks may be provided electronically. A hardcopy shall be provided for use in the aircraft. All technical data to be supplied shall be included in the monthly lease price.

Technical Manuals (TMs). TMs for the aircraft and manufacturer's aircraft components and systems shall conform to current commercial specifications (Air Transport Association specifications) and be reviewed for acceptability. Any furnished electronic checklist or aircraft performance database will reflect applicable technical data. Source data shall be provided to update the crash and rescue Technical Order. Manuals are required to include structural repair, concurrent servicing, and nondestructive inspection. Manuals for corrosion control are desired. TMs shall reflect the final aircraft configuration and operating procedures. Electronic delivery media (i.e., CD-ROM) is required.

Engineering Data. Engineering data shall provide traceability to the final (as-built) configuration. All data developed shall be the property of the contractor and shall be furnished to the Government upon request with limited data rights and will not be disseminated without the approval of the contractor. The contractor shall provide access to all engineering data; i.e., all engineering data/drawings developed to modify the aircraft to unique configuration, and they shall be stored in a contractor maintained facility and shall be made accessible to Government personnel or Government authorized contractor personnel.

Configuration Control. Configuration Control authority will be held by the FBI. A baseline configuration will be provided by the contractor; after delivery date, all changes affecting this baseline must be approved by the FBI prior to implementation.

Logistics. The contractor shall provide a logistics support system. The logistics support system shall cover the minor and major maintenance/repair capability, such as technical support for evaluation and troubleshooting of recurring problems, (APU) overhaul, engine overhaul, mandatory airworthiness directives and mandatory service bulletins.

4.0 Safety and Survivability

The aircraft shall be able to safely perform all assigned missions in accordance with FAR Part 25 Airworthiness Standards. The contractor shall ensure that a cockpit voice and flight data recorder is installed that meets FAA survivability standards.

5.0 Technical Support

24-hr Technical Support: The contractor shall provide 24-hr aircraft technical support (e.g.

access to OEM field service representative). This support must be easily accessible from worldwide locations. Technical support shall be included in the lease price.

6.0 Test and Acceptance

The FBI will require inspection by FBI personnel at the FBI’s expense of selected aircraft prior to lease. The following are included in this inspection:

a) Flight test procedures will test and evaluate the effects or conflicts with Safety of Flight Items (SFI). The FBI requires SFI to be tested while all standard aircraft systems are operating in accordance to manufacturers guidelines and the SATCOM systems are transmitting and/or receiving while the aircraft is on the ground and airborne. SFI tests include, but are not limited to, all pre-existing:

i. Aircraft communications

ii. Aircraft navigation system

iii. Aircraft warning systems

iv. RADAR system

v. Aircraft operating power

b) The FBI will develop and implement the applicable aircraft acceptance system test procedures to determine if manufactured installed avionics and equipment meets government user functional requirements.

Systems failures due to faulty installation or integration and which require additional labor to rectify are the responsibility of the Lessor.

c) Access to and review of all airframe and engine log books.

d) Proof of aircraft ownership and a review of financial and other applicable records

e) Documentation of compliance with all applicable environmental regulations required for domestic and international flights.

f) Notarized certification from owner that aircraft has not been registered outside of the date of manufacture.

7.0 Reconfiguration

The contractor shall return aircraft to commercial configuration and return all installed FBI equipment to the FBI. The FBI will move the aircraft at its expense to the commercial depot the contractor selects (within North America) for the physical reconfiguration. Such movement will be made in a timely manner upon request, but not later than 5 days after contract completion or request (whichever is later). The FBI will have personnel at the depot to assist in providing appropriate security control for any classified materials removed from the aircraft. FBI personnel at reconfiguration will take immediate possession of GFE when removed from the aircraft.

1.0 Background:

File details come from the government source that posted it. Updated .