Attachment 1 - SOW.pdf

PDF 134 KB Posted

Attached to
Well #2 Water Repair Federal contract opportunity
Solicitation number
12805B23Q0529
Issued by
Department of Agriculture Agricultural Research Service Field Research Implementation and Information Delivery Plains Area

About this file

This statement of work describes well repair and replacement services required at the USDA Agricultural Research Service facility in El Reno, Oklahoma. The selected contractor will remove and inspect the existing well pump and motor, repair or replace as needed, clean and repair the well casing, and replace insulation on exposed pipes. The work must be completed within 45 days of award. Bids are due by July 11, 2023 with a pre-bid site visit scheduled for the same date. The selected contractor will be responsible for all labor, equipment, permits, and disposal required to perform the work in accordance with applicable safety, environmental, and construction standards. A one year warranty on workmanship is also required.

View the file

Other files for this federal contract opportunity

Other files attached to Well #2 Water Repair, newest first.
File Type Posted
SF1442.pdf PDF
SF24.pdf PDF
SF 30.pdf PDF
Attachment 4 - ARS-372.pdf PDF
Attachment 3 ARS-371.pdf PDF
Attachment 2 - Wage Determination.pdf PDF
12805B23Q0022 Well 2 Repair.pdf PDF
Attachment 5 - Fill In Biobased Statement Letter.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USDA ARS Grazinglands Research Laboratory 7207 W. Cheyenne St.

El Reno, OK 73036

Statement of Work Replace Water Well Pump #2; Repair and Clean Well and Casing

SECTION 01010 ‐ SCOPE OF WORK

A. GENERAL: It is the intent of these general conditions, specifications, together with the contract, to include all labor, materials, equipment, transportation, permits and fees, temporary protection and supervision necessary to complete the required work. All work shall be done under the direction of and completion to the satisfaction of the Contracting Officer.

1. Project Description:

Water well work at the USDA, ARS, OCPARC El Reno, located at 7207 W. Cheyenne Street, El Reno, OK 73036.

Water well #2 is approximately 60 feet deep with water at approximately 11 feet below ground level. The top of the casing is approximately 10 feet above ground level on a raised platform.

Casing is believed to be 8in. and necks down to 6in. at around ground level (possibly 10in. and necks down to 8in.) and pipe is believed to be 3in.(possibly 2in.). Contractor to verify. Piping is insulated and has a heat tape between well head and underground supply line to protect against exposure to the elements. Insulation will need to be removed and replaced as necessary and is a part of this scope.

Current Pump: Grundfos ‐ pump type: 230S150‐4 Current Motor: Hitachi 15HP/3PH/230v MFG.No. G25863E Pump, motor and pipe were replaced in 2016, well was also cleaned/brushed at that time.

Work includes:

1‐1. Remove necessary insulation to pull pump/motor.

1‐2. Pull and inspect well pump and motor.

1‐3. Repair/replace pump/motor.

1‐4. Repair and clean well/casing (brush screens).

1‐5. Replace insulation on exposed pipes.

The contractor shall furnish all labor, tools, equipment, transportation to the job site, and supervision for the job indicated above. The contractor shall furnish all material except material listed in the government furnished material section of this document.

2. Government Furnished Equipment: None

3. Site Visit/Pre Bid Meeting : Tuesday July 11, 2023 @ 10 am. Please contact Troy Gibbens to register for the site visit. (405) 243‐1367

4. Codes and Standards: Construction shall comply with the requirements of ARS Facilities Design Standards Manual 242.1, ARS Energy Management Plan 134.2 and all other applicable

El Reno, OK 73036 federal, state and local code requirements as well as current industry standards, (ie. UBC, UPC, NFPA, UL, ASTM, ACI, NEC, NEMA., etc,) and health and safety codes, in effect at the time of contract award. ARS Design and construction manuals can be found on the website under “P&P and Manuals” at http://www.afm.ars.usda.gov/facilities/pplist‐FD.htm.

5. Permits: Where governing regulations and imposed codes and standards require notices, permits, licenses, inspections, tests, and similar items or actions in order to lawfully proceed with the required work, Contractor shall obtain items and take those actions in accordance with the regulations of the governing authority. The costs of such permits, licenses, inspections, etc., are the responsibility of the Contractor.

6. Application: It shall be the responsibility of the Contractor to perform all work in accordance with the manufacturers’ recommendations and Industry Standards. If any item specified herein and/or on the drawings conflicts with applicable codes and recommendations, the contractor shall bring it to the attention of the Contracting Officer for immediate resolution.

SECTION 01050 ‐ FIELD ENGINEERING/INSPECTION OF SITE

A. The Contractor shall be responsible for verifying site conditions, making quantity take‐offs, obtaining accurate measurement of existing conditions, and performing any act or operation which may be necessary to properly bid the work and complete the same as depicted and specified. Failure to verify the existing site conditions shall not relieve the Contractor of the responsibility to complete the work as required.

SECTION 01300 ‐ SUBMITTALS

A. Manufacturer's descriptive literature sufficient to determine conformance of the proposed product to the contract requirements shall be submitted to the CO for review and approval. The descriptive literature shall be annotated/highlighted to show its conformance with contract requirements.

B. Installation procedures supplied by the manufacturer.

SECTION 01400 ‐ QUALITY CONTROL

A. GENERAL: To satisfy the requirement for Quality Control, the work performed under this contract shall be subject to continuous audit by the Location Site Monitor (LSM). Quality control is the exclusive responsibility of the Contractor.

B. FINAL ACCEPTANCE: Acceptance of the completed work will be based upon its conformance to the contract.

C. WARRANTY: The warranty period for workmanship shall be for one (1) year from the date the government accepts the work.

http://www.afm.ars.usda.gov/facilities/pplist

El Reno, OK 73036

SECTION 01525 ‐ SAFETY REQUIREMENTS

A. The Contractor shall implement, and provide to the Contracting Officer (CO) for review, a site specific, SITE SAFETY AND HEALTH PLAN in accordance with all local, state and federal regulations. The plan shall address, at a minimum all responsible parties by name, all safety/health hazards, personal protective equipment and other hazard controls, all required training, emergency procedures, and other required information to perform the work. The plan shall be implemented by contractor supervisor signature. Two copies shall be provided to the Contracting Officer and one copy will be maintained at the site. In the event of changing site conditions or hazards, the plan shall be appended in writing and a copy of the change provided to the CO and COR.

SECTION 01545 ‐ PROTECTION OF WORK AND PROPERTY

A. The Contractor shall protect the work, the site, and all existing property and structures within the limit of construction activities or that may be affected thereby until acceptance of the work.

Any damage to property shall be repaired at the Contractor’s expense, to pre‐damaged condition to the satisfaction of the COR.

B. Safety and health matters, as they relate to the work, are the exclusive responsibility of the Contractor. The Contractor shall furnish, erect, and maintain barricades, warning lights, signs, guards, or take other precautions as may be required by law or local authorities for protection and security.

SECTION 01560 ‐ TEMPORARY FACILITIES

A. Temporary utilities (water and electricity) will be furnished to the Contractor by the Government, if so requested. Contractor shall maintain and protect all such utilities during the course of construction and shall repair or replace any items damaged through is own negligence.

B. Should the Contractor require any power or utility shutdown during construction, he shall receive approval for such shutdown from the LSM three working days prior to this need.

SECTION 01600 ‐ MATERIALS AND EQUIPMENT

A. The material and equipment to be furnished under these contract documents shall be the standard products of manufacturers regularly engaged in the production of such materials and equipment and shall be the manufacturer's latest standard design.

B. All materials and equipment to be incorporated in the work shall be handled and stored by the manufacturer, fabricator, supplier and Contractor before, during and after shipment in a manner to prevent warping, twisting, breaking, chipping, rusting and any injury, theft or damage

El Reno, OK 73036 of any kind whatsoever to the materials and equipment. All materials and equipment furnished by Contractor shall be subject to inspection and approval by the CO/LSM.

D. EXECUTION:

(a) The Contractor shall provide the necessary tools, equipment, labor, coordination, and related materials necessary for the completion of work.

(b) Erection techniques employed by the Contractor must be in accordance with the manufacturing company's suggested erection procedures. Work is expected to be completed no later than 45 days after notice of award.

SECTION 01710 ‐ CLEANING

Upon completion of project, and prior to final inspection, the Contractor shall remove from the premises all unused material, trash, and debris resulting from the work to the satisfaction of the

LSM.

SECTION 01711 – WARRANTY

Submit data concerning the standard one year warranty for workmanship, including the warranty period (dates), and warranty contacts with names, addresses and telephone numbers.

Extended Equipment/Product Warranties: Obtain and furnish to the Contracting Officer all written warranties for equipment/products that have extended warranties (warranty periods exceeding the standard one‐year warranty) furnished under the contract. The warranty period shall begin on the same date as project acceptance and shall continue for the full/product warranty period. The warranties shall be fully executed and delivered to the Contracting Officer prior to final acceptance of the facility.

SECTION 01010 ‐ SCOPE OF WORK
SECTION 01050 ‐ FIELD ENGINEERING/INSPECTION OF SITE
SECTION 01300 ‐ SUBMITTALS
SECTION 01400 ‐ QUALITY CONTROL
SECTION 01525 ‐ SAFETY REQUIREMENTS
SECTION 01545 ‐ PROTECTION OF WORK AND PROPERTY
SECTION 01560 ‐ TEMPORARY FACILITIES
SECTION 01600 ‐ MATERIALS AND EQUIPMENT
D. EXECUTION:
SECTION 01710 ‐ CLEANING
SECTION 01711 – WARRANTY

File details come from the government source that posted it. Updated .