Attachment 1 - SOW Bldg 31.pdf
PDF 1 MB Posted
- Attached to
- B31 Modular Furniture Federal contract opportunity
- Solicitation number
- FA8601-21-Q-0068
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 5 - RFI.docx | DOCX document | |
| Attachment 5 - RFI.docx | DOCX document | |
| Attachment 4 - B31 Drawings.pdf | ||
| Attachment 5 - RFI - B31 Modular Furniture.docx | DOCX document | |
| Attachment 5 - RFI - B31 Modular Furniture.docx | DOCX document | |
| Attachment 6 - demountable wall.jpg | JPG image | |
| Attachment 7 - demountable wall.jpg | JPG image | |
| Attachment 5 - RFI - B31 Modular Furniture.docx | DOCX document | |
| Attachment 2 - Offeror Reps and Certs.pdf | ||
| Attachment 4 - Bldg 31 Drawings.pdf | ||
| Attachment 3 - CLIN Structure and Provisions.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Furniture Package
Facility 31
WPAFB, Ohio
Furniture Package
SOW
Facility 31
2300 D Street, Area B
Wright-Patterson Air Force Base, 45433 USA
Facility 31
WPAFB, Ohio
1.0 Scope
The Contractor shall provide all supervision, labor, materials, equipment, and transportation to accomplish this project in accordance with the Statement of Work, project drawings, and the requirements contained in the soliciting documents.
2.0 General Requirements
Modular Furniture: manufacturer’s minimum 10-year product warranty (excluding fabrics and lighting), unless specified differently below.
High Pressure Laminate (HPL) on specified finishes
All furniture will be installed on carpet. Provide proper footings/ bases on furniture.
Provide certified electrician to connect power poles to building power. Ensure all furniture is connected and powered accordingly.
All specified power cords to be proper lengths to reach systems panels/modular walls and building walls.
Provide overall 2D floorplan drawing, overall 3D rendered floorplan and 3D renderings of each typical.
2.1 Non- Typical Configurations/Descriptions
For this project we require the following typical(s) and quantities:
Basis of design
Modular Furniture: T-Shape Office
Typical MO.1
Tag Item Description Finishes
QTY: 5
o To come from same manufacturer’s collection as MO.2 and MO.3 o Table and Credenza
• Center drawer below credenza
• Lateral file below credenza (on guest seating side)
• (1) grommet in both table and credenza. Include covers
• Wire management baskets below surfaces
• Modesty panel on table only
• Integrated worksurface power unit in credenza.
• Minimum of (2) power receptacles and (1) CAT 6 hookup.
Close flush when in use.
• Dual monitor arm on 30”D +/- table
• Grommet mounted, articulating, height adjustment
• Minimum of (2) power receptacles and (2) USB ports in base
• Wire management
• Leg base on all units o Freestanding Hutch
• Textile tack board
• LED task light with wire management
• Locking hinged doors with handles
• Open bookcase to gang with overhead (above lateral file) o Wardrobe
• Combination shelving with coat rod or coat hook
• To align with height of hutch
• Locking with handles
• 1 adjustable shelf
• Leg Base o Total of (2) wall hung markerboards to go in office that are against exterior walls. Dry erase marker kit with cup, markers and eraser
• Minimum: 42”W x 32”H, Maximum 50”W x 39”H o Furniture: HPL with a minimum of 5 woodgrain finishes, matching wood where applicable o Leg bases and pulls
• Minimum of grade 1 metal o Monitor arm
• Metal
For Government Use OnlyMeets Does Meets
Reason(s) does not meet:
Modular Furniture: U-Shape Office
Typical MO.2
Tag Item Description Finishes
QTY: 1
o To come from same manufacturer’s collection as MO.1 and MO.3 o Table , Bridge and Credenza
• Center drawer below bridge
• Mobile pedestal file (cushion top) below table and lateral file below credenza
• (1) grommet in table, bridge and credenza. Include covers
• Wire management baskets below surfaces
• Modesty panel on table only
• Integrated worksurface power unit in bridge.
• Minimum of (2) power receptacles and (1) CAT 6 hookup. Close flush when in use.
• Dual monitor arm on 30”D +/- table
• Grommet mounted, articulating, height adjustment
• Minimum of (2) power receptacles and (2) USB ports in base
• Wire management
• Leg base on all units o Freestanding Hutch
• To span length of bridge. Textile tack board
• LED task light with wire management behind tack board
• Locking hinged doors with handles
• Open bookcase to gang with overhead (Closest to credenza) o Wardrobe
• To align in height with hutch
• Combination lateral storage, shelving and coat closet
• Coat rod or hook in chassis. Adjustable shelving
• Lateral drawer
• Leg Base
• Locking with handles o Round Table
• Minimum 40”, Maximum 44”
• Metal X-Base o Bookcase
• Freestanding
• 5H
• Minimum: 39”W, Maximum: 44”W
• Shelving o Wall hung markerboard. Dry erase marker kit with cup, markers and eraser.
• Minimum: 42”W x 32”H, Maximum: 50”w x 39”H o Furniture: HPL with a minimum of 5 woodgrain finishes, matching wood where applicable o Leg bases and pulls
• Minimum of grade 1 metal o Monitor arm
• Metal
Modular Furniture: T-Shape Office
Typical MO.3
Tag Item Description Finishes
QTY: 2
o To come from same manufacturer’s collection as MO.1 and MO.2 o Table and Credenza
• Center drawer below credenza
• Lateral file below credenza (on guest seating side)
• (1) grommet in both table and credenza. Include covers
• Wire management baskets below surfaces
• Modesty panel on table only
• Integrated worksurface power unit in credenza.
• Minimum of (2) power receptacles and (1) CAT 6 hookup. Close flush when in use.
• Dual monitor arm on 30”D +/- table
• Grommet mounted, articulating, height adjustment
• Minimum of (2) power receptacles and (2) USB ports in base
• Wire management
• Leg base on all units o Freestanding Hutch
• Textile tack board
• LED task light with wire management
• Locking hinged doors with handles
• Open bookcase to gang with overhead (above lateral file) o Wardrobe
• To align in height with hutch
• Combination lateral storage, shelving and coat closet
• Coat rod or hook in chassis
• Adjustable shelving
• Lateral drawer
• Leg Base
• Locking with handles o Round Table
• Minimum 40”,Maximum 44”
• Metal X-Base o Wall hung markerboard. Dry erase marker kit with cup, markers and eraser.
• Minimum: 42”W x 32”H, Maximum: 50”w x 39”H o Furniture: HPL with a minimum of 5 woodgrain finishes, matching wood where applicable o Leg bases and pulls
• Minimum of grade 1 metal o Monitor arm
• Metal
Image depicts tier structure. Not to scale
Modular Wall or Panel System
Typical MW.1
Tag Item Description Finishes
QTY: 2
o Modular Wall or Panel System
• Minimum 76”H, Maximum 84”H.
• To fit within allocated space
• To connect to building walls (wall starter or equivalent)
• Transparent (clear not frosted) sliding door, locking
• Total of (8) duplex outlets. Total of (8) communication knock outs. Refer to I-1 for locations
• Total of (2) Power Poles to accommodate electrical cords and 4 CAT 6 cables per pole. Provide all required tie in points to make connection to building’s power.
• Panel A:
• Top tier of wall/panel to be transparent (clear not frosted)
• Minimum height= 14”
• Maximum height= 20”
• Remaining panel to be woven textile
• Panel B:
• Top tier of wall/panel to be transparent (clear not frosted)
• Minimum height= 14”
• Maximum height= 20”
• Middle tier wall/panel to be makerboard
• Minimum height: 28”
• Maximum height: 38”
• Dry erase marker kit with cup, markers and eraser
• Lower tier wall/panel to be woven textile
• To complete the remaining height of panel.
• Refer to I-1 drawing for location details o Woven textile: Minimum grade 2, unless grade 1 has a minimum of 12 patterns o Metal trim: Minimum grade 1
For Government Use OnlyMeets Does Meets
A B
Fully Upholstered Lounge Chair
Typical LC.1
Tag Item Description Finishes
QTY: 17
o Mid-Century Mod Chair o Back and seat to be connected o Fully upholstered o Armless o Angled 4 leg wood base o Minimum weight capacity 250 lbs o Upholstery:
Silicone, EPU, equivalent or better o Leg base:
Minimum of 5 wood selections
For Government Use OnlyMeets Does Meets
Fully Upholstered Conference Chair
Typical LC.2
Tag Item Description Finishes
QTY: 12
o To come from same manufacture’s collection as LC.3 o Back and seat to be connected o Fully upholstered o Integrated arms o To fit under conference table (T.1). Arms not to interfere with pushing chair underneath table.
o 5 prong caster base o Height adjustable seat o Overall height (includes height adjustment)
• Minimum: 37”- 42”
• Maximum: 41”- 44” o Minimum weight capacity 300 lbs o Upholstery:, Silicone, EPU, equivalent or better o Aluminum or powder coated base
For Government Use OnlyMeets Does Meets
Fully Upholstered Conference Chair
Tag Item Description Finishes
Typical LC.3
QTY: 12
o To come from same manufacture’s collection as LC.2 o Back and seat to be connected o Fully upholstered o 4 prong or leg caster base o Overall height
• Minimum: 30”
• Maximum: 33” o Minimum weight capacity 300 lbs o Upholstery:, Silicone, EPU, equivalent or better o Aluminum or powder coated base
For Government Use OnlyMeets Does Meets
Table
Typical T.1
Tag Item Description Finishes
QTY: 1
o Top- HPL with minimum of 5 wood grain finish selections o Table base and power modal:
Metal
For Government Use OnlyMeets Does Meets
Reason(s) does not meet:
o Minimum: 55”W x 18’L o Maximum: 64”W x 23’L o Rectangular two piece top o Bevel Edge o U-shaped/ looped base or angled leg base o Integrated power module
• Flip top or hinged lid
• Power receptacle
• USB port
• CAT 6 port
• HDMI port
• Computer Video port
• Minimum of a 9’ cord o Wire management
• Manage wires from underside of table to the floor.
• Channel in table base
Facility 56
WPAFB, Ohio
Once the contract has been awarded, it becomes the responsibility of the contractor to validate the actual site conditions as well as any specific programming needs of the customer. It is understood that the actual site parameters or certain customer requirements may deviate from the standard typical layouts; therefore any deviation that causes an increase in the price submitted during the bid process must be documented in writing and submitted to the Contracting Officer for review, along with a floorplan reference to show just cause. A final furniture layout and Bill of Materials (BOM) will then be provided that meets the customer requirements and accommodates the physical environment. Design parameters and expectations are followed in Section 3.2.
3.0 Description of Services
3.1 General Services
Coordination and management of all new product, equipment and people required to create, deliver and install new systems and modular furniture within an Air Force location.
This includes ongoing servicing of any items defective due to manufacturing error as well as for replacement or repair of any damaged item after purchase.
3.1.1 The contractor shall perform tasks on the Furniture in accordance with the requirements stated in this section and Contract (#TBD based upon manufacturer of successful offeror).
3.1.2 The contractor shall be responsible for all personnel, equipment, tools, materials, supervision, storage, assembly, transportation, incidentals and all other items and services necessary to provide and install systems and modular furniture.
3.1.3 The contractor shall be knowledgeable of and shall comply with all applicable federal, state, and local laws, codes, permits, DoD, AF, and base requirements and instructions required for the performance of the duties in this Statement of Work
(SOW).
3.1.4 The contractor shall ensure policies and procedures are established that protect the safety and welfare of customers, employees, and the community to minimize or eliminate safety or environmental risks. These policies shall be in compliance with Federal and Installation policies and procedures.
3.1.5 The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate or alternates who shall act for the contractor when the manager is absent shall be designated in writing to the Contracting Officer (CO) within 5 days after contract award. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to the daily operations of this contract on the installation.
3.1.6 The contractor shall provide a Project Manager responsible for project site management, scheduling, coordination and technical assistance to the Air Force representative as required throughout the project. Resumes and letters of intent shall be provided upon request.
3.1.7 Reserved
3.1.8 All contractors shall submit a complete list of personnel in accordance with installation policy, including deliverymen, who will be expected to work on the installation. This list will contain Privacy Act information as required as well as the expectation that each individual will be able to present a current and valid state identification, to meet local Air Force security requirements. (Please note that many installations require this information be coordinated days in advance).
3.1.9 The contractor shall not employ persons for work on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, general well-being or operational mission of the installation and its population. Contractor personnel shall present a neat appearance and be easily recognized as contractor employees.
3.1.10 The contractor shall be an authorized dealer of the specific furniture manufacturers specified on the project.
3.1.11 The vendor shall manage ordering, shipment, delivery and installation of all new furniture from manufacturer to final acceptance by the designated Government
Acceptor.
3.1.12 The contractor shall provide customer service during normal duty hours, 0730-1630 hours, Monday through Friday; except for federal holidays.
3.1.13 Recognized US Federal Holidays are as follows: New Year’s Day, Martin Luther
King Day, Presidents Day, Memorial Day, Independence Day, Labor Day, Columbus Day, Veterans Day, Thanksgiving and Christmas. If the holiday falls on a Saturday, it is observed on Friday. If the holiday falls on Sunday, it is observed on Monday.
3.1.14 When the contractor desires to work other than standard times, a written request shall be submitted to the Government Acceptor for approval. Written approval from the Contracting Officer must be received before proceeding with the work.
The request shall be submitted at least five (5) work days prior to the proposed performance of work, and it shall indicate the day/days, time/amount of work, and reason why performance is necessary during nonstandard hours.
3.1.15 All Air Force inquiries shall be responded to by a contractor representative within two business days.
3.1.16 Meetings may periodically be held between top level base personnel and contractor management to discuss contract status. The CO will notify the contractor in writing in advance of the place and time of required meetings.
3.1.17 Vehicle registration, proof of insurance and a valid driver’s license shall be presented to gain base access.
3.1.18 The contractor shall be responsible for coordination of an escort through any controlled areas through the assigned Government Acceptor.
3.1.19 Lost vehicle and entry passes shall be reported immediately to the Security Police as well as the Government Acceptor in accordance with the local security forces policy.
3.1.20 The contractor shall be responsible for any storage of all new systems/modular/demountable wall furniture, components, parts and assemblies prior to and during installation in accordance with the agreed upon delivery schedule.
3.1.21 The contractor shall maintain continuity between the support operations at Facility
31, WPAFB, Ohio and all other assigned performance locations and the contractor’s corporate offices. The contractor shall provide the necessary resources to manage and administer the contract. The contractor shall, as a minimum, maintain a single point of contact for this effort to be available in person to Stephanie Nishanov at (937) 656-3437 or thru email at stephanie.nishanov@us.af.mil during the same business day.
3.1.22 The contractor shall provide for the management and support of personnel, to include: making necessary arrangements for employees required to travel;
supporting personnel co-located on Facility 31, WPAFB, Ohio and other locations specified with additional resources, expertise, advice; necessary infrastructure to support work to be accomplished off-base; conducting personnel meetings; providing administrative support for employees in a timely fashion; and providing facility and staff security requirements.
3.1.23 All personnel attending meetings, answering Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed.
mailto:stephanie.nishanov@us.af.mil
3.2 Design Services
Providing professionals versed in programming, space planning and product specification, able to communicate product capabilities to the customer, to ensure products purchased meets the requirements.
3.2.1 Reserved
3.2.2 The contractor shall be able to provide design services, including space planning, site verification, material selection and programming as necessary for each project.
3.2.3 The contractor shall define and furnish the necessary hardware, software, and all other equipment necessary to accomplish design tasks. Standard equipment in addition to the hardware and software shall include but not necessarily be limited to: reproduction machines, plotters, paper, pencils, fax machines, and office furniture.
3.2.4 The contractor shall be responsible for collection of information relevant to the design of a space. Examples could include personnel interviews, questionnaires and walk-through inspections of the facility.
3.2.5 Services shall include site evaluation to ensure proper fit of the new furniture within the given space and that all structural and other anomalies are taken into account.
3.2.6 The contractor is responsible for notifying the Government Acceptor of all power requirements regarding location of communication, LAN and power junction boxes. The user will be responsible for cabling as well as providing and locating those junction boxes within 4'-0" of the Power Pole location provided by the contractor.
3.2.7 Design shall ensure that base feeds do not protrude into main walkways.
3.2.8 Design shall ensure that all outlets included in the design are accessible to the user, free and clear of obstacles.
3.2.9 Design shall not allow more than four cubicles to be served by a single circuit.
3.2.10 Design shall ensure that no more than two duplex outlets (four plug in points) are put onto the same circuit.
3.2.11 Design shall ensure that no existing wall outlets or thermostats are covered or concealed by panels or other systems furniture components.
3.2.12 Reserved
3.2.13 All designs of furniture layouts, including original designs and any subsequent redesigns, must be accomplished by, qualified professional Interior Designers.
3.2.14 The contractor shall provide two additional drawings of furniture layouts, if requested by base organizations on a non-rewritable CD or DVD in both .dwg and
.pdf formats unless otherwise specified in the contract.
3.2.15 The hardware/software shall perform computerized inventory, computer aided design, automated take-off function, and report generation for all product purchased. The software for this contract shall be compatible software for
AutoCAD and Revit. The software shall be fully compatible with Microsoft
Windows, the most current version.
3.2.16 Design service shall include an initial complete design with up to two additional revisions prior to final approval. Revisions shall include the following:
Reconfiguration of cubicles, relocating cubicles and the addition of new cubicles to the design in the SOW and drawing.
3.2.17 Designs of each location shall include a Basic component floor plan sheet in which all systems furniture and workstation is tagged: to include graphic symbols for all major hanging components (flipper cabinets, shelves, task lights, tack boards, work surfaces, drawers, etc.) as determined by the government. This design sheet shall include station numbers and movable wall and associated product locations, in 1/4"
= 1'0" scale.
3.2.18 Reserved
3.2.19 Site Visit: There will be an optional site visit held, time and date TBD. Please wear facemasks.
3.2.20 Designs of each location shall include a Panel and Hardware Layout sheet:
to include all finish colors and fabrics, panel widths (30", 36", 42", etc.), in 1/4" =
1'0" scale, in addition to display hardware, keys and locksets shall be included.
3.2.21 Design sheet layouts of each location shall include a Furniture Power
Distribution sheet in 1/4" = 1'0" scale to include: the location of all new powered panels, powered components, receptacles, communication ports, power poles, powered raceways, base electrical feeds and building connection points.
3.2.22 Reserved
3.2.23 Reserved
3.2.24 The contractor shall maintain an updated, automated master copy of all furniture layouts, (designs/redesigns) accomplished under this contract for the duration of the warranty, after government acceptance of the project.
3.2.25 Drawing changes required to a layout due to contractor errors or omissions shall be the responsibility of the contractor and the corrected drawing and bill of materials shall be delivered to the government within three calendar days of the request.
3.2.26 Contractor shall provide the base or requiring location a copy the installation drawings and bill of materials via mutually agreed upon electronic media.
3.2.27 Contractor shall make the government aware of any discrepancies to existing conditions not previously identified.
3.2.28 Design shall conform to the parameters established in the Architectural Barriers
Act regarding accessibility of persons with disabilities.
3.2.29 Reserved
3.3 Product Markings/Documentation/Tools
Items used after product acceptance used to identify or modify a particular product.
3.3.1 All documentation (Owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, etc.) shall be provided to and reviewed with the Government Acceptor and/or Government
Project Manager upon completion of the installation.
3.3.2 Special assembly tools (security hardware wrench, spare parts provided with the furnishings, etc.) shall be provided to the Government Acceptor and/or
Government Project Manager prior to final Government acceptance of products and services.
3.4 Delivery Services
Transportation of all new products, loading, unloading, storage and all necessary movement from factory to final onsite set up.
3.4.1 The contractor Project Manager shall be responsible for on-site coordination of all staging and deliveries of their product, to include access to and operation of any equipment needed for unloading and movement of materials or product.
3.4.2 Contractor shall be responsible for determination of the appropriate delivery method and handling, based on site conditions to include the non-existence of loading docks and equipment at any given location. Special circumstances may be identified by and negotiated with the Contracting Officer.
3.4.3 Reserved
3.4.4 A maximum of 30 days storage for new products shall be included in the contractor's agreement.
3.4.5 Work shall comply with applicable building standards and codes, specifically:
National Electrical Code (National Fire Protection Association (NFPA 70) and
National Life Safety Code (NFPA 101).
3.4.6 The contractor shall be responsible for following all safety and security guidelines within the area in which work is being performed, to include securing any contractor owned tools or equipment, and any on site storage being utilized.
3.4.7 The contractor shall maintain accountability and control of any keys provided and shall return them to the Government Acceptor upon completion of work.
Duplication of keys or other means of access is not authorized.
3.4.8 The contractor shall prevent its personnel from entering any area other than the designated work area.
3.4.9 The contractor shall maintain a means of egress within all designated work areas to comply with fire codes.
3.4.10 The contractor shall ensure its personnel eat, drink, or smoke only in designated areas.
3.5 Installation and Removal Services
Manufacturer certified professionals to install systems and modular furniture per the approved design drawings.
3.5.1 Each dealership shall be able to provide, or capable of obtaining support services to include removal and warehousing of the proposed furniture.
3.5.2 The contractor shall appoint an authorized representative who will be the company's senior representation on site for all customer communication and enforce compliance of all requirements for the project. This representative shall have a physical presence during any delivery and throughout installation unless agreed to by the Government Acceptor and/or Government Project Manager.
3.5.4 The contractor representative shall meet with Government Acceptor and/or
Government Project Manager to review the installation drawings prior to installation.
3.5.5 The contractor shall install new systems and modular furniture in accordance with each requirement statement and basic component floorplan, panel plan and electrical plan, designed and provided by the contractor with each purchase.
3.5.6 Contractor shall be liable for any damage to government property caused by the contractor or their representatives.
3.5.7 During installation the contractor shall protect all furniture and building materials, to include carpet, existing within the space with industry approved protective coverings inclusive of craft paper, moving blankets and such type material. The contractor shall not use protective materials that will leave any type of residual print, outline or imaging on any furniture or building materials. Contractor shall not repair damage to finishes but will be responsible to pay for damages. The government will make repairs and back charge the installation contractor.
3.5.8 Reserved
3.5.9 The contractor shall uncrate/unpack all new items and perform required assembly in accordance with the manufacturer instructions.
3.5.10 Services shall include inspection of product for shipping damage. If damage is found it shall be the responsibility of the contractor to notify the authorized government representative and make all arrangements for replacement or repair of the item(s) damaged. Damaged items are not to be installed unless otherwise directed by the Government Acceptor.
3.5.11 Services shall include assembly of new product to conform to final Air Force approved design drawings.
3.5.12 Any furnishings attached to the building shall be attached securely.
3.5.13 Installation of new systems and modular furniture must be under the oversight of an onsite manufacturer certified installer.
3.5.14 Reserved
3.5.15 Services shall include removal of packing materials from the installation.
3.5.16 Reserved
3.5.17 Reserved
3.5.18 All trash removed from the worksite shall be disposed of in accordance with state laws, and packaging and other recyclable materials shall be recycled where ever possible.
3.5.19 The contractor shall maintain environmental controls when working in any Air
Force facility, to include but not limited to keeping doors shut and lights off when not in use and turning off vehicle engines when parked.
3.5.20 Light fixtures shall have appropriate lamps and be in working order.
3.5.21 Prior to acceptance, the contractor shall clean all new furniture only with the manufacturer's recommended cleaning agents/products.
3.5.22 The contractor shall provide all new components, completely assembled, installed, and operational, including keys in each lock set.
3.5.23 New furniture, equipment, and accessories shall be level, square, and in proper alignment with adjoining furniture. All drawers should operate smoothly and stay closed when not in use.
3.5.24 The contractor shall inspect to ensure the new furniture is free of surface dirt and defects, the installation is complete, and the new furniture is ready for use.
3.6 Inspection/Acceptance Checklist
Validation between the contractor and the Government Acceptor that all product has been installed according to manufacturer guidelines and customer specifications.
3.6.1 A post-installation walkthrough shall be coordinated with the contractor’s authorized representative and Government Acceptor and/or Government Project
Manager.
3.6.2 All areas requiring correction shall be documented in a punch list by the contractor and provided to the authorized government representative upon completion of a joint walk through by the contractor and authorized government representative.
3.6.3 A final walk through will be performed with the contractor and the Government
Acceptor and/or Government Project Manager to ensure all punch list items have been addressed to the satisfaction of the Government Acceptor.
3.6.4 Upon completion of all contract requirements, the contractor will submit to the
Government Acceptor the Inspection/Acceptance Checklist (Attachment 1 to this
SOW) and documentation of completed punch list items. The Government
Acceptor will complete the
Inspection/Acceptance Checklist and return it to the contractor. The Contractor may then submit a final invoice in the Wide Area Workflow system (WAWF)
(https://wawf.eb.mil/) and will attach an electronic copy of the signed
Inspection/Acceptance Checklist to the invoice submission.
4.0 Product
4.1 Monolithic Panels, Modular Furniture, Filing and Seating Components
The contractor shall supply all system parts and components needed to fulfill a complete office.
5.0 Government Furnished Property/Support
5.1 Base support includes Government-controlled working space and utilities.
6.0 Site Conditions
6.1 Standard site conditions shall be considered those that include:
6.1.1 Free and clear hard surface access to the receiving and installation location during regular working hours
6.1.2 Parking and off-loading area suitable for access by a semi-trailer combination or truck within 100 feet of the building entrance closest to product installation area
6.1.3 Threat condition level of the base is Bravo. This requires dealer personnel to get base access in order to complete the product installation.
6.1.4 A staging area adequate to sort, stage and uncrate products along with a waste receptacle suitable for disposal of materials
6.1.5 Includes electric power, working lights, heating and air conditioning, and access to a working freight elevator if location is on a floor other than the first floor
6.1.6 Current and correct CAD drawings of the building shell
6.1.7 A building ready for the installation of furniture (i.e. other tasks such as painting and flooring are complete so as not to cause any delays in performance)
6.2 Contractor shall notify the Contracting Officer of any deviations from the above standards, as well as any requests for equitable adjustment to the contract price.
7.0 Quality Assurance
7.1 Contractor performance shall be measured and assessed using the Performance Objectives listed in the Description of Services (3.0). Contractor Performance Objectives are derived from the contract Statement of Work. Performance surveillance shall be accomplished in accordance with the Performance Plan. See Inspection Acceptance Checklist.
8.0 Voluntary Protection Program (VPP)/Safety
8.1 Voluntary Protection Program: The Air Force is part of the AOSHA VPP. All contractors are required to familiarize themselves with the requirements of the VPP. Information on
VPP can be accessed at http://www.osha.gov/dcsp/vpp/index.html.
9.0 Base/Installation Specifics
9.1 All commercial trucks must enter through Gate 26A, WPAFB, Ohio, which is located off St. Rt. 235, WPAFB, Fairborn, Ohio, for inspection. In accordance with the Installation 88 ABW/SFS base entry procedures must adhere to delivery vehicle process requirements mandated by the WPAFB AFI 31-101. Once at
Gate 16A the driver must have a current pass AF Form 75, Visitor Pass, requested by 88 ABW/PZ, Area A, Building 1, POC TBD, and be able to show:
A current Vehicle Registration
A current Proof of Insurance
A valid and current Driver's License for the driver
A valid and current Driver's License or other State Identification for any passenger(s) in the vehicle.
9.2 Gate Procedures:
http://www.osha.gov/dcsp/vpp/index.html
Once at Gate 26A be prepared to exit the vehicle and allow for vehicle inspection. At this time you may ask for directions to your final destination.
If the final destination requires the driver to leave Gate 26A and re-enter the base through an alternate gate, the pass received will be sufficient documentation for entry into both gates, within a pre-established time directed by the Security Forces representative.
Arrival at the appropriate gate after the designated allotted time will result in non-admittance to the installation.
This procedure will occur each time a commercial truck requests access to the base.
9.3 Current Bill of Lading (BOL) to get delivery driver and the vehicle on base. BOL must include the AF installation name, date of anticipated delivery, and specific destination (including building number, street address, and point of contact information).
9.4 Personnel should the following items when entering an installation:
Current Registration for all vehicles x
Current Proof of Insurance for all vehicles x
Valid driver’s license for each driver x
Valid driver’s license or other state identification for each passenger x
Depending on the current Force Protection Condition, a government representative may be required to sponsor those people in person at
Pass & ID, Area A, Building 286.
The sponsor must state the guest's purpose and destination. It is the responsibility of the contractor to validate this need with their government
POC prior to their arrival so as to coordinate the arrival time accordingly.
Sponsors may request that a pass be applicable for multiple days if needed.
9.5 To sponsor 10 or more people, a typed list of those people must be submitted by the Government Acceptor in Word or Excel format, stating LAST NAME then
FIRST NAME of each person. The sponsor must submit that list to Pass & ID
Area A, Building 286, no fewer than three days prior to the anticipated arrival.
Names listed must be complete names, (no nicknames), and correspond to the names on the state ID for each person.
9.6 Mission Essential Services: Contractors are not considered mission essential.
9.7 Prohibitions: Firearms may not be brought on base under any circumstances.
Individuals with criminal records are not allowed on base. Contractor personnel are prohibited from sponsoring guests onto the installation.
10.0 Delivery
10.1 Second floor installation. Stair carry items. Refer to attached stairwell images. Single door entry into stairwell and into project rooms.
10.2 Period of Performance: To begin no later than 12 weeks after awarded finishes and design are finalized.
10.3 The Government has full ownership of all formal deliverables and required supporting documentation with regard to use, distribution and reproduction
11.0 Attachments
11.1 I-1 Drawing
11.2 Government Acceptor the Inspection/Acceptance Checklist
File details come from the government source that posted it. Updated .