This is a Statement of Work (SOW) for the replacement of fabric roof covers and end wall covers on two fabric-covered buildings at the USDA-ARS EIDMRU farm in Stratford, Wisconsin. The project addresses deteriorating roof coverings on buildings housing manure processing operations and chemical storage.
Building 1 (Chemical storage) requires a 30' wide x 40' long replacement main cover, two 30' wide end covers with one 18" x 24" poly louvered screened vent each, ratchet upgrade, and new tensioning hardware. Building 2 (Manure processing) requires a 50' wide x 80' long replacement main cover, two 50' wide end covers without vents, ratchet upgrade, and new tensioning hardware. All fabric must be white, non-fire resistant with woven HDPE scrim weave, white PE coating and film, minimum 13.5 ounces per square yard, 26 mil thickness, and meet specified performance standards including grab tensile strength (Warp 480 lb/Weft 420 lb), tear resistance, mullen burst (680 psi), UV weathering retention (100% after 2000 hrs), and low temperature bend (-65°C). The contractor must perform complete removal of existing covers and endwalls, maintenance service of roof framing, and provide freight/shipping, travel, and rental equipment. Vendor site visitation is mandatory prior to quote submission.
Work must be completed between June 1 and September 30, 2026, during normal business hours (7am-5pm Monday-Friday), with at least one week advance notification to facility staff. The worksite is located at 208356 Drake Ave, Stratford, WI 54484. All travel and material delivery costs must be included in the quote. Vendor staff requiring on-site access for five or more days must undergo background clearance prior to work commencement. No government property or equipment will be provided.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 1 Rev 1 Scope of Work (SOW).pdf | ||
| Solicitation 1232SA26Q0288.pdf | ||
| Site Visit Information.pdf | ||
| Attachment 2 Wage Determination WI20260002.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) Project: Fabric Roof Covers Replacement
GENERAL INFORMATION
1.0 Scope of Work:
Replacement of fabric roof covering and end wall covers on two fabric cover buildings at the USDA-ARS EIDMRU farm in Stratford, WI.
2.0 Background:
The EIDMRU farm has two fabric cover buildings that house manure processing operations and chemical storage. The buildings roof coverings are showing deterioration and require replacement prior to further damage and failure. The project involves removal of the existing roof covers and end walls, and replacement with new covers and end walls. The end walls for the chemical storage building must each have a vent included. Also, the ratchet tightening mechanisms require upgrading.
CONTRACTOR REQUIREMENTS
3.0 Technical Requirements/Tasks:
The project will include the following:
Building 1 (Chemical storage building) -30' wide x 40' long replacement main cover using non-fire resistant fabric (all-white in color to allow maximum amount of natural light) -30' wide replacement end covers (two end walls) -Each end wall to include one 18” x 24” poly louvered screened vent -Includes Ratchet Upgrade and new tensioning hardware
-Fastening tube will be re-used
Building 2 (Manure processing building) -50' wide x 80' long replacement main cover using non-fire resistant fabric (all-white in color to allow maximum amount of natural light) -50' wide replacement end covers (two end walls) -No vents to be included in end walls -Includes Ratchet Upgrade and new tensioning hardware
-Fastening tube will be re-used
Fabric specifications Weave: Woven HDPE scrim Coating: White PE Film: White PE Color: White only Weight: 13.5 ounces/square yard minimum
Fabric performance property minimum values:
Thickness 26 mil (0.66 mm)
Grab Tensile Warp 480 lb/ Weft 420 lb Strip Tensile (N/5cm) Warp 290 lb/in /Weft 260 lb/in Tongue Tear Warp 90 lb / Weft 85 lb Trapezoidal Tear Warp 90 lb / Weft 85 lb Mullen Burst 680 psi Accelerated UV weathering 100% strength retention after 2000 hrs exposure @ 0.77
W/m²/nm, or 1200 hrs ASTM G154 exposure @ 1.35 W/m²/nm
Low Temperature Bend -65°C
-Complete removal of existing roof covers and endwalls, and installation of new roof covers and endwalls -Maintenance service of roof framing (tightening bolts, cables, etc) -Freight/shipping of supplies -Travel for installation -Rental equipment for installation
-Quote must include a description of all materials and services to be provided as part of the package, including materials, labor, travel/deliveries, rental equipment, and any other items necessary for project completion. If items deemed necessary in the above technical specifications are not included in the quote, the quote may not be reviewed.
It is required for vendors to visit the site to understand the scope of work to ensure they quote sufficient labor and the correct supplies and materials to complete the project. If vendors do not visit, their quote will not be evaluated.
4.0 Government Furnished:
No government property or equipment will be provided
5.0 Deliverables / Schedule:
The site of this work is at the USDA-ARS EIDMRU lab and office located at 2615
Yellowstone Drive, Marshfield, WI 54449.
The project must be completed during the summer (June 1 to September 30, 2026) to avoid work during cold weather and snow.
All work at the site must be conducted during normal business hours of 7am and
5pm Monday through Friday unless scheduled in advance with facility staff.
Contractors must work with the contract officer to notify the USDA technical POC
(Matt Akins; matthew.akins@usda.gov; 715-391-3246) and Marshfield farm contact Ashley Blackburn (aablackburn@wisc.edu; 715-650-7451) at least 1 week before anticipated start of the package implementation to ensure the plans work with the staff’s schedule, and coordinate work schedules around other building projects.
mailto:matthew.akins@usda.gov mailto:aablackburn@wisc.edu
6.0 Travel:
Worksite location is the UW Marshfield Agricultural Research Station, 208356 Drake Ave, Stratford, WI 54484. All travel and delivery of materials to the site must be included in the quote.
7.0 Contractor’s Key Personnel:
Key personnel for the contractor include the technical representative to determine the correct materials, and the staff in charge of implementation.
8.0 Security Requirements:
A clearance will be required for vendor staff entry into the building if staff will be on-site 5 or more days to complete the project. Vendor will be required to submit names of those staff who will be on-site for 5 or more days for a background check prior to being allowed into the building to conduct work.
| CONTRACTOR REQUIREMENTS |
| 3.0 Technical Requirements/Tasks: |
| 6.0 Travel: |
File details come from the government source that posted it. Updated .