Attachment 1 - PWS Fike Explosion Suppression Maintenance.pdf
PDF 262 KB Posted
- Attached to
- Fike Explosion Suppression System Maintenance Services Federal contract opportunity
- Solicitation number
- FA813222QFES1
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 2 - Work Request Form.xlsx | XLSX spreadsheet | |
| CSS -Fike Explosion Suppression _Ready to Post.pdf | ||
| Attachment 3 - Equipment List.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
FOR
Serv P22-055 Fike Explosion Suppression
Prepared by
OC-ALC/OBCA
26 August 2022
Section One
1. Description of Services
The 76 PMXG requires Preventive Maintenance (PM) and Remedial Maintenance for the Fike Explosion Suppression System. This is needed to remain in compliance with NFPA 69.
1.1 Scope: The Contractor shall provide all labor, tools, equipment, test equipment, material, parts, quality control, transportation and inspection manuals necessary to perform the PM and any repairs at the Oklahoma City–Air Logistics Complex (OC-ALC). This includes personal lifts, ladders, or elevated work platforms. The equipment is listed in Appendix A.
1.1.1 The Contractor shall be responsible for insuring all services, parts and Original Equipment Manufacturer (OEM) components provided under this contract are in accordance with (IAW) the terms and conditions outlined herein, conform to the manufacturer’s equipment specifications and this PWS.
1.2 Preventive Maintenance (PM): The objective of PM is to protect the equipment capability and investment by removing causes of failure, performing routine maintenance and providing adjustment to compensate for normal wear before failure occurs. The Contractor shall perform all PM’s IAW the OEM specifications and this PWS. The Contractor shall perform PM quarterly on each item listed in Appendix A. The Contractor shall provide a copy of the PM schedule to the Contracting Officer Representative (COR) within five (5) business days after contract award. The Contractor shall notify the COR seven (7) business days prior to each scheduled PM visit.
Additional units are going to be installed beginning with the Basic year. PM is not to be done until warranty is up.
1.2.1 The Contractor shall inspect all parts of the Fike Explosion Suppression Systems on Appendix A that are not covered under warranty per NFPA 69 instructions and the below check list.
a) Inspect components every 3 months.
b) System wiring is free from ground conditions and faults.
c) System components, including mounting arrangements, are not corroded or mechanically damaged.
d) System components have no damage from the process, acts of nature or debris.
e) System components are not blocked by process material.
f) System components have not been tampered with.
g) The system has not discharged or released.
h) System seals, tamper indicators, or discharge indicators are in place and functional.
i) The control unit functions according to design requirements, circuits are properly supervising the system and status is “normal condition” when armed.
j) System suppressors and valve actuators are pressurized and operational.
k) System interlocks are verified for proper sequence and functioning.
l) System sequence of operation is verified by simulation.
m) Removal and testing of thermal detectors will be done yearly.
n) Gas Cartridge Actuators must be replaced every ten years.
1.3 Remedial Maintenance (RM) is the repair of equipment and systems with parts, materials, and labor to restore performance to the designed function in the event of any breakdown or stoppage of equipment or system where the equipment or system is unable to perform its designed function. RM includes repairs and replacement of related components, parts, and appurtenances that have failed, no longer perform reliably, or have worn beyond safe tolerances. CO will make final determination of work being within scope.
1.3.1 RM Procedures:
The Labor Rate(s) for RM shall be fixed at the beginning of the contract for each year of performance. These Labor Rates are fully-burdened rates.
1) When the need for RM The Contractor shall submit the RM/Work request form (attachment 2) with an estimated Not To Exceed (NTE) amount to the COR/Government POC for coordination.
2) The COR will coordinate the Work Request (WR) with the Government Subject Matter Expert (SME)/Program Office in order to validate the contractor’s hours and materials. After the SME reviews and confirms the estimate and then submit it to the Contracting Officer (CO) for final approval. If the CO approves the WR, it will be returned to the Contractor signed, and the Contractor will be briefed that:
a) The WR has been approved in the amount of their estimate; and,
b) They must have CO approval prior to exceeding this amount.
3) If the CO doesn’t approve the WR the Contractor will be notified and will additionally be provided with the CO’s rationale for disapproval.
4) Once the Contractor has approval from the CO, the Contractor shall begin work. If the Contractor exceeds the NTE amount without CO authorization the Contractor does this at its own risk and the Government is not liable to pay for anything over the NTE amount.
5) Upon completion of work, the Contractor shall promptly submit to the CO a quote for the RM work to include actual labor hours and material costs. The Government and Contractor will then negotiate a settlement for the RM work. The CO will then definitize the RM work to a Firm Fixed Price (FFP) amount.
6) Failure to agree on the FFP RM amount shall be a dispute with the meaning of the Disputes Clause as found in the contract.
1.4 Malfunction and Notification Process: Upon occurrence of an equipment or system malfunction, the COR will contact the Contractor by telephone, email, or fax and provide information below. If the COR notifies the Contractor via telephone, the COR will provide a written copy of the request by email or fax.
the equipment identification number (ID#) a brief description of the malfunction location of equipment name and telephone number of the Point of Contact (POC)
Upon notification of the system malfunction, the technician shall arrive on site at the equipment location within two (2) business days or if overseas five (5) business days.
1.5 Equipment Evaluations: The Contractor shall provide a written Estimate Repair Report to the COR by fax or email no later than (NLT) one (1) business day after the completion of the inspection. As a minimum, the information cited on the Estimate Repair Report shall include:
the equipment ID# date of evaluation description of findings and recommendations required parts and part numbers (P/N) cost of parts number of parts needed estimated labor hours required to complete the repair
Any recommendations cited shall consider:
the priority of the requested service available source for obtaining new parts the availability of the new parts shipping and delivery schedules of parts other factors which may be peculiar to the specific repair requirement
1.6 Authorizations for Repair Actions: Only the Contracting Officer (CO) can authorize repair actions. The COR will coordinate any repair actions with the Government Subject Matter Expert (SME) and the CO in order to obtain the approval to proceed. The Contractor shall ensure all repair actions have the documented CO approval, in writing, before initiating any repair or ordering parts. The Contractor shall demonstrate to the Government SME that the repairs have been completed.
1.6.1 Once the authorization for repair action has been received from the CO, the Contractor shall order any required parts within two (2) business days and notify the COR, in writing, of the estimated arrival date of the parts. Upon the receipt of the parts, the Contractor shall perform the repair within five (5) business days. The COR will verify the receipt of the parts with the Contractor to ensure the repair is performed in a timely manner.
1.7 Parts and Materials: The Contractor shall provide and use only new parts and material in performance of this PWS unless otherwise authorized by the CO. The Contractor shall provide a statement that parts must be purchased direct from one souce or provide two (2) or more quotes showing that the parts listed.
1.7.1 The Contractor shall use NIST (National Institute of Standards and Testing) traceable gages.
Measurement & Test Equipment (M&TE) and measurement standards shall be labeled to indicate calibration status. The label shall identify, as a minimum, specific date calibrated (day, month, and year, Julian date or equivalent) and the specific calibration due date. Tamper resistant seals shall be affixed to operator accessible control or adjustments on M&TE and measurement stands that, if moved, shall affect the calibration.
1.7.2 In the event of a discharge of the Explosion Suppression System the Government SME will provide the Fike Rebuild Kit (Kit includes a new Gas Cartridge Actuator) and the Suppression Agent to the Contractor for the purpose of installation. The Contractor shall provide documentation showing receipt of Rebuild Kit and Suppression Agent to the Government SME.
The Government SME shall provide a copy of this documentation to the COR , the Unit Environmental Coordinator (UEC), and the CO.
1.8 Service Report: Immediately upon completion of the maintenance support services and before leaving the OC-ALC, the Contractor shall provide a written Service Report to the Government SME. When necessary the Government SME will forward the service report to the COR within two (2) business days of receipt. The Contractor shall provide, by fax or email, the final service report within five (5) business days to the COR. As a minimum, the final service report shall contain the following information:
name of the company requested service date contract number equipment ID# description of services provided additional services recommended (if any) printed name and signature of technician who performed the services printed name and signature of on-site Government SME or COR start and completion dates complete breakdown of the labor cost (hours and rate) materials and parts used details of any other charges printed name and signature stating only new parts and materials were used written verification statement that a performance check to verify operational condition was performed and that the equipment is in working order.
1.9 Increase of Equipment: The Government reserves the right to increase the number of the Fike Explosion Suppression System to be serviced by the Contractor, through means of a modification based on the Government need during the life of the contract. The Contractor shall provide the agreed upon Fike Explosion Suppression System PM services IAW the unit prices, terms and conditions agreed upon in the Basic and Option years of the contract.
1.10 Decrease of Equipment: The Government reserves the right to decrease the number of the Fike Explosion Suppression System to be serviced by the Contractor, through means of a modification based on the Government need during the life of the contract. The Contractor shall provide the agreed upon Fike Explosion Suppression System PM services IAW the unit prices, terms and conditions agreed upon in the Basic and Option years of the contract.
1.11 Maintenance Documentation: The Contractor shall notify the SME upon completion of each PM / Repair / or similar requirement, IAW OC-ALC Operating Instruction (OI) 21-203, Chapter 1, 2, and 3, as applicable.
1.12 Industry Documents and Requirements.
1.13 Continuation of Essential Department of Defense (DoD) Contractor Services During Crisis: This requirement has been determined not to be essential and does not require continued support during a crisis as defined in DFARS 252.237-7023.
1.14 Hours of Operation: The Contractor shall perform the work required under this contract during the following days and hours: Monday through Friday, 7am to 3pm. If work hours are required outside the hours stated, the Contractor shall contact the COR for approval from the CO.
Upon approval from the CO, the SME or COR must be present with the Contractor.
These dates and hours exclude Federal Holidays, base closures due to inclement weather, and furlough days, as applicable.
1.15 Special Qualifications: The Contractor shall provide personnel with the following special qualifications:
Any Contractors perfoming work must have a current certificate of training from Fike that is signed by Chad Burkhardt.
Certificate must have no less then six months left on certification at time of award.
1.16 Contractor Personnel: The Contractor shall provide the name of the Contract Manager (CM) and any alternates who shall act for the Contractor when the CM is absent. They shall be designated to the CO and COR, in writing, within five (5) business days after the contract award date. The Contractor shall provide telephone numbers and email addresses where the CM and alternates may be contacted at any time. The CM or alternate shall have full authority to act for the Contractor on all matters relating to operation of this contract at the OC-ALC on Tinker Air
Publication Number Title Basic Date
Latest Chg Number
Latest Chg Date
ISO/ANSI/ASQC
Q9001:
Quality Systems – Model for Quality Assurance in Production, Installation and Servicing
2000 N/A N/A
National Fire Protection Association (NFPA) Standard no. 69
Standard on Explosion Prevention Systems
1969 2014
Force Base (AFB). The CM or alternate shall be available to meet on the installation with Government personnel designated by the CO to discuss problem areas. The Contractor shall provide a CM who can read, write, speak, and understand English fluently.
1.16.1 The Contractor and Contractor personnel shall be required to identify themselves as Contractor personnel by introducing themselves or being introduced as Contractor personnel. The Contractor personnel shall also display distinguishing badges or other visible identification for meetings with Government personnel or while performing work for the OC-ALC on Tinker AFB.
The Contractor and Contractor personnel shall identify themselves as Contractor employees in telephone conversations and in formal and informal written correspondence.
1.17 Listing of Contractor Employees: The Contractor shall provide an initial listing of names and position titles of employees who will come to Tinker Air Force Base to the COR within five
(5) business days after the contract award date. Within five (5) business days, the Contractor shall also provide an updated listing of personnel to the COR when employees affecting the work of this contract change status or position.
1.17.1 The Contractor shall not employ persons on this contract if such employee is identified to the Contractor as a potential threat to the health, safety, security, and/or general well-being, or operational mission of the installation and its population. The Contractor shall not employ any person who is an employee of the United States (US) Government if the employment of the person would create a conflict of interest. The Contractor shall not employ any person who is an employee of the Department of the Air Force (AF), either military or civilian, unless such person seeks and receives approval according to the DoD 5500.7-R Joint Ethics Regulations (JER). In addition, the Contractor shall not employ any person who is an employee of the Department of the AF if such employment would be contrary to the policies contained in Air Force Instruction (AFI) 64-106, Air Force Industrial Labor Relations Activities. The Contractor shall be prohibited from employing off-duty CORs who are providing surveillance on any contracts/sub-contracts awarded to the Contractor. All contract personnel, depending on particular condition, occasion, or place or job assignment shall be required to wear professional and suitable attire. All Contractor personnel shall conduct themselves in a professional and courteous manner. The selection, assignment, reassignment, transfer, supervision, management, and control of Contractor personnel in performance of this PWS shall be the responsibility and prerogative of the Contractor; however, the Contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning the conduct of employees as referenced herein. The Contractor shall employ and maintain a technically trained and experienced work force.
1.18 Environmental Protection & Safety: The Contractor shall be knowledgeable of and comply with all applicable federal, state and local laws, regulations, instructions and requirements regarding environmental protection and occupational safety and health. The Contractor shall comply with any laws, instructions or regulation changes during the term of this contract.
1.18.1 Contractors shall be compliant Tinker Air Force Base (TAFB) Supplement to Air Force Manual (AFMAN) 32-7002, “Environmental Compliance and Pollution Prevention”, Tinker AFB procedures per Tinker Air Force Base Hazardous Waste Management Plan (TAFB HWMP), and Complex procedures per Oklahoma City Air Logistics Complex (OC-ALC)
Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention” and OC-ALCI 32-101 “Air Quality Record Keeping Procedure”. Publications are available digitally on e-Publishing website at www.e-publishing.af.mil for downloading or ordering.”
1.19 Hazardous Material (HAZMAT): If no HAZMAT will be brought on base or used in performance on this contract, the contractor shall certify “No HAZMAT will be brought on base” or “No HAZMAT Usage” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.
1.19.1 The Contractor shall not store chemicals or hazardous material (HAZMAT) on Tinker AFB. Contractors shall be compliant with HAZMAT management procedures per Oklahoma City Air Logistics Complex (OC-ALC) Supplement to AFMAN 32-7002, “Environmental Compliance and Pollution Prevention”. The Contractor shall maintain a log of all HAZMAT that is used on base. This usage log shall be provided to the COR monthly, the last business day of each month, or when the required work is completed. The COR will forward the records to the Unit Environmental Coordinator (UEC) no later than the fourth (4th) day of the following month or the first (1st) subsequent business day.
1.20 Safety Data Sheet (SDS) and Labeling: Upon COR receipt of the “No HAZMAT Usage” certification, the requirements of this section no longer apply.
1.20.1 The Contractor shall not transport, ship or use any chemical, material or substance used in the performance of this PWS on Tinker AFB before written approval is provided by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). The Contractor shall submit to the COR, ten (10) calendar days after contract award date all Safety Data Sheets (SDSs). The Contractor shall receive approval from the COR prior to shipping any chemical, material or substance to Tinker AFB. A copy of the manufacturer SDS shall accompany the shipment. Contractor shall comply with the effective dates for SDS requirements IAW the Occupational Safety and Health Administrations (OSHA) Hazardous Communication Standard, Title 29, Code of Federal Regulation (CFR) Part 1910.1200. The Contractor shall ensure containers of hazardous chemicals are labeled with the following information, prior to shipping to Tinker AFB IAW OSHA Hazardous Communication Standard, Title 29, CFR Part 1910.1200 (2012): product identifier; signal word; hazard statement(s); precautionary statement(s);
pictogram(s); and name, address and telephone number of the chemical manufacturer, importer, or other responsible party. The COR will forward all SDS submittals to 72 ABW/CEIE for approval. A current manufacturer SDS shall be submitted to the COR if the Contractor changes manufacturer or vendor for any chemicals that were prior approved. The Contractor shall maintain copies of manufacturer SDSs for all chemicals and SDSs shall be readily accessible at all times by Contractor personnel as well as government employees.
1.21 Hazardous Waste: If no HAZWASTE will be generated during performance of this contract, the contractor shall certify “NO Hazardous Waste Generation” by official correspondence. This certification shall be provided to the COR within ten (10) days after award. Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply. Appropriate penalties for the contractor shall be assessed if found in violation of above certification.
1.21.1 The Contractor shall dispose of contaminated solid waste, spent or processed chemical solutions, used rags and hazardous waste in government furnished waste containers located in the shop or area the work is being performed. The Contractor shall notify the COR if the required waste containers are not available on site.
1.22 Discharges: Any discharges into Tinker’s industrial waste treatment plant (IWTP) or sanitary sewer shall be approved and done IAW Tinker Industrial Waste Water Discharge Permit as instructed by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). Notice of intent documentation shall be provided to the COR within ten (10) days after award. The COR will submit the required notice of intent documentation to the UEC for 72 ABW/CEIE approval. The Contractor shall not discharge into IWTP and sanitary sewer prior to approval issued by 72 ABW/CEIE. The Contractor shall maintain records of written approval issued by 72 ABW/CEIE for discharges into IWTP and sanitary sewer.
1.23 Off-Site Discharges: For discharges outside of Tinker AFB, the Contractor shall ensure waste water discharges, that may contain pollutants resulting from any contracted service, go to a state or federal permitted treatment facility such as a municipal Publicly Owned Treatment Works (POTW). The Contractor shall provide official correspondence ten (10) calendar days after contract award date to the COR from the POTW that states the POTW is permitted for all pollutants that the Contractor may discharge during the contracted service.
1.24 Spills: Upon occurrence of any spill that could enter the storm system or cause any harmful environment effects, the Contractor shall immediately call 911 to report the incident. When possible, the Contractor shall use a base telephone to receive help from Tinker AFB 911. If using a cell phone, the Contractor shall request Tinker AFB 911. The Contractor shall immediately report all environmental violations to the COR and UEC. The Contractor shall provide five (5) copies of a typed or written report about the incident within four (4) clock hours as follows:
One (1) copy to CO, two (2) copies to the COR, a copy for UEC and one (1) copy for record.
The format of the report shall be left up to the Contractor, but the report shall contain the following information:
1.) Name and contact number of person reporting the spill 2.) Date and time of incident 3.) Location and source of spill 4.) Substance or pollutant spilled 5.) Amount spilled and rate of discharge 6.) Any damages or injuries involved 7.) Extent of area impacted 8.) Potential hazards 9.) Actions taken 10.) Organizations contacted
11.) Remarks Section - that addresses the cause of the spill (e.g. human error, equipment, etc.) and whether 911 was called and which agencies responded.
1.25 Environmental Training: Upon COR receipt of the “No Hazardous Waste Generation” certification, the requirements of this section no longer apply.
1.25.1 Contractor personnel performing duties in the service of this PWS shall have training that acquaints the person with the details of Resource Conservation Recovery Act (RCRA) regulations in 40 CFR 260 through 279; applicable State Laws and regulations; DoD, Air Force and local requirements. This training can be obtained through creditable training institutions or companies. All training shall be approved by 72 ABW/CEIE, Natural Infrastructure Management (Environmental Compliance). RCRA training is available at http://www.natlenvtrainers.com/RCRA-hazardous-waste.htm;
http://www.skillsoft.com/catalog/detail.asp?CourseCode=esh_sah_a34_sh_enus000000 and http://www.lion.com/Storing-Hazardous-Waste-for-LQGs at the Contractor’s expense. Prior to obtaining training, the Contractor shall provide the name of the training institution or company and course description to the COR for approval within ten (10) calendar days after contract award date. Once written approval is received from the COR, the Contractor shall provide the environmental training certificates for employees performing duties in the service of this PWS to the COR, within thirty (30) calendar days after contract award date. In addition to the required environmental training, Contractors shall be compliant with Tinker AFB procedures per TAFB HWMP, “Hazardous Waste Management”.
1.26 Batteries Disposed of by the Contractor: The contractor shall recycle or dispose of the batteries removed from the equipment serviced by the terms of this contract. The contractor shall provide a certificate of recycling or a letter from the company stating the method of disposal for the batteries. A copy of the certificate or letter shall be provided to and approved by Tinker AFB’s Hazardous Waste Program Manager, 72 ABW/CEIE, ten (10) calendar days after contract award date. The COR will place a copy of the certificate or letter in the contract file.
The contractor shall report the quantity of batteries, in pounds, sent for recycling or disposal on a monthly basis by providing an email or a copy of the actual certificate of recycling or disposal to the COR no later than the third (3rd) day of the month following the last business day of the month. The COR will forward the information to the Hazardous Waste Program Manager, 72
ABW/CEIE
1.27 Housekeeping: The Contractor shall keep the work areas clean and neat IAW industry standards, OSHA, fire and safety standards, and this PWS.
1.28 FOD and DOP: Contractor personnel who work in or travel though areas near operational and production aircraft, engines, munitions, missiles, drones, space systems, support equipment, Aerospace Ground Equipment (AGE), trainers, and the Contactor personnel operating vehicles and equipment on flight lines, runways, taxiways, parking ramps, and in aircraft hangers and maintenance areas are required to receive the FOD/DOP training and to comply with AFI 36- 2232, AFMC Supplement 1, paragraph 9.2., and A4.3.4. (Initial)/A4.3.5. (Refresher). The Contractor and Contractor personnel shall acknowledge the FOD/DOP training either by viewing the Digital Versatile Disc (DVD) provided by the COR or the You Tube site, http://www.youtube.com/watch?v=tYcbodjFPnM. The Contractor shall provide a Contractor devised certificate to the COR for each employee within five (5) business days after the contract award date. The certificates shall have the title of the training, the name of the person who received the training, and the date of the training. The Contractor shall also ensure all new employees view the FOD/DOP training and provide a Contractor devised certificate of training to the COR prior to the employees starting work in the OC-ALC shops. On an annual basis, the Contractor and Contractor personnel shall be required to review the FOD/DOP training and to provide an updated Contractor devised certificate of training to the COR within five (5) business days of the new period of performance (PoP) start date.
1.29 Tool Control and Accountability: While performing contract services in or around Maintenance Production Shops, which includes ramp areas, the Contractor shall comply with AFI 21-101_AFMC Supplement 1, 21-101, Chapter 10 (all paragraphs) and OC-ALCI 21-112, paragraph 14.1. and 14.5.3. The Contractor shall provide the completed MXRIWRS Form 032 prior to performing work in the OC-ALC industrial areas. The MXRIWRS Form 032 is available from the COR. The Contractor shall provide a Contractor Tool Listing, MXRIWRS Form 032, to the COR within five (5) business days after PM or Repair actions. The Contractor or Contractor’s personnel shall inventory the container or bag of tools at the beginning of each work day and at the end of each work day. The Contractor personnel shall immediately notify the COR of any tools that are missing or lost from the work area or container (e.g. tool or job box or tool bag). The COR will report any missing Contractor’s tools which have not been located within one (1) hour after notification to the appropriate Government personnel. The Contractor shall obtain the Form 32 from the COR. The CM shall ensure each employee on the job site receives a briefing from the COR about Housekeeping, FOD/DOP, and Tool Control prior to starting work in OC-ALC Industrial Areas.
1.30 Privately Owned Motor Vehicles (POV): Contractor personnel shall comply with the directives pertaining to operation of POVs on Tinker AFB per AFMAN 31-116, in its entirety, “Motor Vehicle Traffic Supervision”. The Contractor shall comply with Tinker AFBI 24-302, in its entirety for the operation of POVs within Tinker AFB.
1.31 Visitors Pass: The Contractor shall contact the COR seven (7) business days before arriving on Tinker AFB in order to make arrangements for Visitors Passes. The COR will assign a sponsor for the Contractor from within the organization. The Contractor and the sponsor shall arrange to meet at Pass and Registration, Building 6611 at the Tinker Gate which is South of I-40 off of Air Depot. The Contractor shall provide two (2) forms of identification, one of which shall be a picture ID, to the 72 SFS. The 72 SFS will provide an AF Form 75, Visitors Pass, which will be valid for up to thirty (30) calendar days.
1.32 Foreign Nationals: The Contractor shall notify the COR before sending a Foreign National representative to perform services. Special rules apply for foreign nationals visiting a US Government facility.
1.33 Safety and Health on Government Installations: While performing work under this contract on a Government installation, the Contractor shall comply with federal, state and local regulations, and AFI 91-203, “Air Force Consolidated Occupational Safety Instruction”, as established by this contract and Appendix C. The Contractor shall notify the CO, COR, and Government Contract Administrator (CA) within one (1) business day of any injuries that occur to Contractor personnel while they are on the installation. The Contractor shall notify the CO, COR, and Government CA within one (1) business day of damage to Government property or equipment during the execution of the contract.
1.34 Emergency Procedures: The Contractor personnel shall follow the direction of the Government personnel with regard to emergency procedures, such as fire, tornado, active shooter, bomb threats, or other emergency. It is the responsibility of the Contractor to provide guidance and to establish procedures for its employees to respond to an emergency. It is the Contractor’s responsibility to account for their employees following an emergency evacuation. The Contractor personnel shall participate with the Government personnel in all fire and tornado drills at no additional cost to the Government.
1.35 Training – General: The COR will provide training via slides, video, or classroom prior to the Contractor performing work at the OC-ALC. The Government will be responsible for all approved costs associated with the training identified below. The COR will document training on and maintain copies of the completed AF IMT 1151, Training Attendance and Rating, as part of the contract surveillance file. For purposes of identification and compliance with Personally Identifiable Information (PII) requirements, only the last four (4) of the Contractor employee’s Social Security Number (SSN) will be input on the form.
1.35.1 The Contractor shall contact the COR prior to work being performed in order to accomplish the required training or to verify the required training as listed below has been completed:
Contractor Required Courses Course Number FOD and DOP Awareness Training Course Initial CHPMAS0000400SU AFMC FOD and DOP Awareness Training Refresher CHPMAS0001301CB Initial Fire Safety and Prevention Training CTESAF0000100SU Refresher Fire Safety and Prevention Training, Computer Based Training (CBT)
CTEMAS0002900CB
Section Two
(Reserved)
Section Three
Government Furnished Property (GFP) And Services
3.1. Government Furnished Property.
3.1.1. Government Property Repair/Maintenance On-Base is not considered Government Furnished Property (GFP). FAR Parts 45 and 52.245 plus supplements are not applicable to Government Property Repair/Maintenance On-Base. The responsible Government Organizations (76 PMXG/MXDECB) for Government Property Repair/Maintenance On-Base will be responsible for the Government Property inventory, record keeping, reporting requirements (including Report of Survey), and disposal of all Government Property requiring repair/maintenance on-base during the performance of this contract.
3.1.2. During the Repair/Maintenance On-Base and when applicable, the Government will provide the Contractor replacements parts/material to install upon receipt in the on-base equipment to keep the equipment operational. The Contractor shall not take possession of the replacement parts/material to store and install in the on-base equipment at a later date. The Contractor shall not take the replacement parts/material off-base. The Contractor shall use the replacement parts/material only for the performance of this contract. The Government will maintain accountability of the replacement parts/material during the performance of this contract.
3.1.3. GFP Not Exceed $150,000 - Repair/Maintenance Off-Base.
Not Applicable.
3.2. Government Furnished Services (GFS) are applicable during the performance of this contract. The Government will furnish the following services at Tinker AFB (TAFB), OK:
3.2.1. Security Forces. The Government will provide general on-base security forces’ service.
The security forces’ telephone numbers are 911 for emergencies, 405-734-2000 for crimes in progress and 405-734-3737 for non-emergency calls. The off-base 911 center receives 911 cell phone calls. Cell phone callers need to advise the 911 off-base center they are on TAFB in order to be connected with the on-base 911 center.
3.2.2. Fire Emergency and Routine Services. The Government will provide general on-base fire protection services. The Contractor shall comply with fire prevention rules and regulations enforced by the TAFB Fire Prevention Branch. Call 911 for emergencies. For routine fire prevention matters call 405-734-3981 or 405-734-3982 and 405-734-7964 for after hours and weekends. For routine calls to dispatch call 405-734-7964.