ATTACHMENT 1 - EQUIPMENT LIST.pdf
PDF 303 KB Posted
- Attached to
- H335--Boiler End of Life Study AMENDMENT 0001 Federal contract opportunity
- Solicitation number
- 36C24221Q1060
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24221Q1060_1.docx | DOCX document | |
| WAGE DETERMINATION.pdf | ||
| 36C24221Q1060.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EQUIPMENT DATE EQUIPMENT Life Expectancy NOTES
Boiler #1 Cleaver Brooks Model CB 200-700 Serial# OLO94344 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil
Built in 1995 30 Installed 7/11/1996
Boiler #2 Cleaver Brooks Model CB 200-700 Serial# L-90891 SWP 200 20000 lbs/hr Input 29,290,000 BTU /HR Nat Gas 209 GPH Oil
Built in 1993 30 Installed 7/12/1995
Boiler #3 Cleaver Brooks Model CB 200-700 Serial# L-90892 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil
Built in 1993 30 installed in 7/15/1993
Boiler #4 Cleaver Brooks Model CB 200-700 Serial# L-90890 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil
Built in 1992 30 installed in 7/15/1993
Boiler #5 Cleaver Brooks Model CB 200-700 Serial# OLO94345 SWP 200 20000 lbs/hr Input 29,290,000 BTU/HR Nat Gas 209 GPH Oil
Built in 1995 30 Installed in 7/22/1995
Deaerator Feed Water Tank East Fabricators Serial# 12774 Vessel# NB 3807 Manufactures Rating 3400 Gal Design pressure 30 PSI Safety valve setting 15/20 PSI Shell thickness .3125”
5/20/1996 30
Condensate/Surge Tank East Fabricators Serial# 12783 Vessel# NB 3783 Manufactures Rating 3100 Gal Design pressure 25 PSI Vented 3” Line
4/19/1996 40
Burner Management Controls Need Upgrade Such as CB Hawk 4000 4/25/1995 20 Combustion Controls Need Upgrade To Go With CB Hawk 4000 4/25/1995 20
Instrumentation Need Upgrade Including SCADA, Transmitters and Gauges Modified 2/12/1997 20 No original install date could be found. Modified to PCC-III Controllers
Boiler Feed Water Pump #5 2/24/1994 20 Current number of F/W pumps does not meet CEOSH 1810 Standard of N+1
Boiler Feed Water Pump #6 2/24/1994 20 Current number of F/W pumps does not meet CEOSH 1810 Standard of N+1
Condensate Transfer Pump #1 4/19/1996 20 Condensate Transfer Pump #2 4/19/1996 20 Condensate Receiver #1 with 2 Pumps 1/27/1994 20 Installed with Surge Tank Condensate Receiver #2 with 2 Pumps 1/27/1994 20 Installed with Surge Tank Fuel Oil Pump #1 4/6/1995 40 Fuel Oil Pump #2 4/6/1995 40
Valves, Shut Off and Control Boiler Non Return Valves Boiler Main Steam Stop Valves Main Steam Header Distribution Valves Main Steam Header Steam Traps, Isolation and Bypass Valves Feedwater Isolation and Stop Valves Boiler Feedwater Control Valves.
Initial install done with install of boilers in 1994/1995
Piping/valves/non return valves and various valves have been repaired or replaced as needed over the years. Boiler feedwater valves are of different configuration and manufacterer.
Definitive date of replacement is unreliable. Safe to say all piping is orginal from mid 1990's
Water Treatment Equipment 12/12/1995 20
Blowdown Tank and Blowdown piping 2015 40
Tank is undersized and piping from tank to sewer may be wrong diameter and material. Could also be partially obstructed.
Blowdown Piping from boilers to Blowdown tank is about 30 years old and developing multiple leaks.
Project #: 561A4-21-110 Boiler End of Life Study - LYONS CAMPUS
EQUIPMENT DATE EQUIPMENT Life Expectancy NOTES Boiler #1 Cleaver Brooks Model CB 200X-600 Serial # OLO88369 SWP 200 20700 lbs / hr Input 25,106,000 BTU / HR Natural Gas Built in 1990 30 Installed 10/1/1990
Boiler #2 Cleaver Brooks Model CB 200X-600 Serial # OLO88368 SWP 200 20700 lbs / hr Input 25,106,000 BTU / HR Natural Gas Built in 1990 30 Installed 9/1/1990
Boiler #3 Cleaver Brooks Model CB 200X-600 Serial # OLO88367 SWP 200 20700 lbs / hr Input 25,106,000 BTU / HR Natural Gas Built in 1989 30 Installed 5/1/1990
Boiler #4 Cleaver Brooks Model CB 200X-600 Serial # L99715 SWP 200 20700 lbs / hr Input 25,106,000 BTU / HR Natural Gas Built in 1999 30 Installed 9/8/2000
Deaerator Feed Water Tank Cleaver Brooks Model BM-42 Serial # DG-5941 50,000 lbs / hr Built in 1990 30 Installed 10/1/1990
Condensate Tank Wendland Manufacturing Corporation Model NB-5452 Serial # 36616 Built in 2005 40 Installed 2006
Burner Management Controls Built in 1990 20 Installed 1990
Combustion Controls Built in 1990 20 Installed 1990
Instrumentation Built in 1990 20 Installed 1990
Boiler Feed Water Pump #1 baldor grundfos NA 20 Installed N/A DATE
Project #: 561A4-21-110 Project Name: Boiler End of Life Study - EAST ORANGE CAMPUS
| Sheet1 |
| Boiler End of Life Study - East Orange Equipment New List.pdf |
| Sheet1 |
File details come from the government source that posted it. Updated .