H335--Boiler End of Life Study AMENDMENT 0001 Federal contract opportunity
Solicitation number
36C24221Q1060
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

View the file

Other files for this federal contract opportunity

Other files attached to H335--Boiler End of Life Study AMENDMENT 0001, newest first.
File Type Posted
WAGE DETERMINATION.pdf PDF
ATTACHMENT 1 - EQUIPMENT LIST.pdf PDF
36C24221Q1060.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT*

Boiler End of Life Study AMENDMENT 0001

GENERAL INFORMATION

CONTRACTING OFFICE’S ZIP CODE*
10010
SOLICITATION NUMBER*
36C24221Q1060
RESPONSE DATE/TIME/ZONE
07-06-2021 3PM EASTERN TIME, NEW YORK, USA
ARCHIVE
60 DAYS AFTER THE RESPONSE DATE
RECOVERY ACT FUNDS
N
SET-ASIDE
SBA
PRODUCT SERVICE CODE*
H335
NAICS CODE*
541330
CONTRACTING OFFICE ADDRESS
Department of Veterans Affairs

Network Contracting Office 2 New York Harbor Healthcare System 423 East 23rd Street New York, NY 10010

POINT OF CONTACT*

Contracting Officer Monique Paltan Monique.Paltan@va.gov

PLACE OF PERFORMANCE

ADDRESS
Deparment of Veterans Affairs

New Jersey Health Care System

Lyons Campus and East Orange Campus

151 Knollcroft Rd

Lyons NJ

POSTAL CODE
07939
COUNTRY
USA

ADDITIONAL INFORMATION

AGENCY’S URL

URL DESCRIPTION

AGENCY CONTACT’S EMAIL ADDRESS

EMAIL DESCRIPTION

Amendment to a Previous Combined Solicitation

Amendment to a Previous Combined Solicitation

DESCRIPTION

*= Required Field
Amendment to a Previous Combined Solicitation

Page 1 of

Amendment to a Previous Combined Solicitation

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO:

Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 06/30/2021 561A4-21-110 36C242 Department of Veterans Affairs Network Contracting Office 2 New York Harbor Healthcare System 423 East 23rd Street New York NY 10010 36C242 Department of Veterans Affairs Network Contracting Office 2 New York Harbor Healthcare System East 23rd Street New York NY 10010 To all Offerors/Bidders

36C24221Q1060 06-30-2021

X X X

This is an Amendment to Solicitation 36C24221Q1060, effective date 06/30/2021. The purpose of Amendment 0001 is to:

- Respond to questions regarding the Combined Solicitation.

----------------See Continuation Page------------------

Monique Paltan Contracting Officer Page 1 of Page 1 of

CONTINUATION PAGE

SOLICITATION 36C24221Q1060 – QUESTIONS AND ANSWERS

Question 1: What are the dimensions of the manways on the Lyons Campus deaerator?

Answer: The dimensions are 12” X 16” as per U-1A Data Report.

Question 2: What are the dimensions of the manways on the Lyons Campus condensate/surge tank?

Answer: The dimensions are 12” X 16” as per measurement.

Question 3: What are the dimensions of the manways on the East Orange Campus deaerator?

Answer: The dimensions are 11” X 15” as per measurement.

Question 4: What are the dimensions of the manways on the East Orange Campus condensate tank?

Answer: The dimensions are 11” X 15” as per measurement.

Question 5: Does “At the completion of the inspection each boiler is closed up properly and that combustion testing on both #2 Fuel Oil and Natural Gas is performed.” require recording as-found measurements only?

Answer: No, it must be properly tuned to manufacturers standards performance.

Question 6: Does “At the completion of the inspection each boiler is closed up properly and that combustion testing on both #2 Fuel Oil and Natural Gas is performed.” require tuning (adjusting) the combustion controls to manufacturer’s standard performance?

Answer: Yes. Also use the following for additional guidance:

Required burner performance (natural gas and fuel oil):

1. Turndown (ratio of maximum and minimum firing rates): 10/1 8/1 5/1 4/1 (Refer to original burner specification).

2. Achieve, but do not exceed, boiler maximum steam flow output rating. Measure fuel input at minimum and maximum firing rates.

3. Maximum carbon monoxide: 200 parts per million (ppm).

4. Maximum nitrous oxide: refer to original burner specification.

5. Flue gas oxygen: 2.5-4.2 percent (Up to 5.2 percent at loads below 40 percent of maximum steam output, no upper limit at minimum firing rate, oxygen can be one percentage point higher on oil firing on single-point positioning systems).

6. Flue gas oxygen (low excess air burners): 1.0-2.0 percent (Up to 2.5 percent at loads below 40 percent of maximum steam output, no upper limit at minimum firing rate: oxygen can be one percentage point higher on oil firing on single point positioning systems).

7. No visible smoke.

8. Flames shall be stable with no pulsations, shall be retained near burner, no blowoff or flashbacks, no constant flame impingement on refractory.

Question 7: In addition to low fire (0%) and high fire (100%), how many points are required for combustion testing?

Answer: 6 points. It shall be tuned at every point which is approximately 14 positions.