Attachment_05_Submittal_Template.pdf
PDF 146 KB Posted
- Attached to
- MN-Replace Fishing and Canoe Launch Platforms Federal contract opportunity
- Solicitation number
- 140F0221Q0039
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140F0221Q0039_Amd_0001.pdf | ||
| Attachment_03_DBA_Wage_Determination.pdf | ||
| Attachment_01_Specifications.pdf | ||
| Sol_140F0221Q0039.pdf | ||
| Attachment_02_Drawings.pdf | ||
| Attachment_04_PreCon_Safety_Checklist.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
U.S. FISH AND WILDLIFE SERVICE
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTURER’S
CERTIFICATES OF COMPLIANCE FOR APPROVAL
(Read attached instructions prior to initiating this form)
Date:
Transmittal No.
Section I (Contractor) To: Infrastructure Management Division U.S. Fish and Wildlife Service 5600 American Boulevard West Suite 990 Bloomington, MN 55437
From:
Contract No.
Previously Submitted On Transmittal No.____
Project and Location:
Halfmoon Landing – Replace Three Platforms Upper Miss NW & FR – Winona District
Item No.
Description (Include Brand or Manufacturers Name)
Contract Specification Paragraph No.
Contract Drawing No.
COTR
Use Only Action Code *
Name & Signature of Contractor
Section II (Fish and Wildlife Service Engineering) Comments
Date Received
Reviewed by Signature Date
*Action Codes Distribution: Station A – Approved As Submitted C – Approved, Except As Noted – Resubmission Required E – Disapproved – See Comments – Resubmission Contract File B – Approved Except As Noted D – No Action Taken – See Comments Required Engineers File Resubmission Not Required Resubmission Required F – Other Returned to Contractor
SUBMITTAL INSTRUCTIONS
1. SECTION 1 will be completed by the Contractor.
SECTION 2 will be completed by the Fish and Wildlife Service.
2. Number each submittal consecutively as submitted throughout the contract.
3. Form is self-transmittal; letters of submittal are not required.
4. Submit in accordance with Section 01 3000 Submittals.
5. Mark submittal items to clearly indicate Item number.
6. The approving authority will assign action codes under column provided in Section I for each item submitted (Action Codes are defined at the bottom of form).
File details come from the government source that posted it. Updated .